Chemical phosphorus removal: The dosage cannot be calculated accurately because the denominator for "phosphorus" has been changed.

Across multiple industries nationwide (upgrade and retrofitting of municipal was
Medium to large scale (32,000 to 200,000 m³/d; magnetic coagulation clarifier si

Chemical Phosphorus Removal: Dosing Calculations Are Inaccurate Because the "Phosphorus" Denominator Has Been Swapped Out

The previous article discussed secondary clarifiers, where what gets replaced is the load; this article discusses phosphorus removal chemicals, where what gets replaced is the denominator. For the same molar ratio 1.5, whether the denominator is influent Total Phosphorus or the phosphorus that needs to be removed, the chemical dosage differs by 4.4 times. Layered on top of that are the effluent target and the content of the commercial chemical—the PAC dosage at the same plant can range from 22 mg/L to 395 mg/L—a difference of 17.8 times. Inaccurate calculation is not because the formula is wrong, but because the three multipliers each use a different version of the denominator.

Gaowutong · Industrial Wastewater Treatment Technology Series · For industry technical personnel · All data are annotated with public standard clauses and literature sources

First, four numbers: The molar ratio given in Clause 7.10.5 of GB 50014—2021 is 1.5~3.0 ("the molar ratio of coagulant dosed to Total Phosphorus in the sewage"); the German dosing coefficient β is taken as 1.5 when the effluent is below 1 mg P/L, with the denominator being the phosphorus that needs to be removed by precipitation; the U.S. "Nutrient Control Design Manual" gives 1.38 / 1.72 / 2.3, corresponding to removal rates of 75%, 85%, and 95%, with the denominator being influent Total Phosphorus; and to achieve an effluent of 0.1 mg/L, engineering practice requires dosing at 3.5 to 6. All four numbers are called "molar ratio," and only when the denominators are aligned can they be placed on the same sheet of paper.

I. A Chemical Order That Doesn't Add Up

Engineers doing upgrade designs have probably all encountered this scenario: the phosphorus removal chemical calculated according to the standard is three tons per day, but after commissioning the actual requirement is twelve tons per day, and the effluent barely stays below the limit. At this point there are usually two explanations—one is "the influent phosphorus is higher than the design value," and the other is "the manufacturer's chemical content is insufficient." These two explanations are sometimes valid, but more often the real reason lies in the calculation: the "phosphorus" you calculated and the "phosphorus" being removed on site are not the same phosphorus.

The core equation of chemical phosphorus removal is just one line: one mole of trivalent aluminum or trivalent iron reacts with one mole of phosphate to form one mole of aluminum phosphate or iron phosphate. The molecular weights are what they are—aluminum 26.98, iron 55.85, phosphorus 30.97—so theoretically, for every 1 kg of phosphorus removed, 0.87 kg of aluminum or 1.80 kg of iron is required. No one disputes this step.

All the disagreement comes in the next step: the coefficient greater than 1 that must actually be multiplied. How much to multiply depends on which "phosphorus" you put in the denominator, on what effluent level you need to achieve, and on how much metal is actually in that drum of chemical you're holding. These three things are written in three different ways in standards, in manuals, and in equipment manufacturers' brochures.

II. The Denominator: A Removal Rate Is Hidden in the Division of β

In chemical phosphorus removal calculations, the Germans introduced the dosing coefficient β, defined as the ratio of the moles of iron or aluminum dosed to the moles of phosphorus. German engineering practice gives the following values: when the effluent is maintained below 1 mg P/L, β is taken as 1.5, meaning that for every 1 kg of phosphorus removed, 1.5×(56/31)=2.7 kg of iron must be dosed, or 1.5×(27/31)=1.3 kg of aluminum. The key here is that the "phosphorus" is the portion of phosphorus that needs to be removed by precipitation, not all the phosphorus in the influent.

This point is clearly stated in the worked example of the German method: a plant with 1 万 m³/d, influent phosphorus 14 mg/L, primary sedimentation removal 2 mg/L, biological assimilation removal 1 mg/L, and the remainder to be removed by precipitant is 11 mg/L, i.e., 100 kg/d. Calculated at β=1.5, the aluminum required is 130 kg/d; converted to aluminum chloride with an effective content of 6%, this is 2167 kg/d, with a density of 1.3 kg/L, amounting to 16.67 m³/d. If the influent phosphorus 14 mg/L is mistakenly used as the denominator, the same formula would yield 165 kg of aluminum and 2757 kg of chemical—an overcalculation of 27%, and this is only the smaller part.

The original text of Clause 7.10.5 of GB 50014—2021 states: "When aluminum salts or iron salts are used as coagulants, the molar ratio of coagulant dosed to Total Phosphorus in the sewage should preferably be 1.5~3.0; when the Total Phosphorus concentration in the effluent is below 0.5 mg/L, the molar ratio may be appropriately increased." Read literally, "Total Phosphorus in the sewage" is the Total Phosphorus of this stream, i.e., influent Total Phosphorus. The clause explanation of the same standard cites data from the 2009 edition of the U.S. "Nutrient Control Design Manual": the molar ratio of aluminum salts to Total Phosphorus at removal rates of 75%, 85%, and 95% is 1.38, 1.72, and 2.3, respectively; the molar ratio of iron salts to Total Phosphorus is 1:1, but an additional 10 mg/L must be dosed to form hydroxides.

The denominator in the U.S. manual is indeed influent Total Phosphorus, because its removal rates are also calculated relative to influent Total Phosphorus. So the two systems are not contradictory—they differ by one division:

β (relative to phosphorus to be removed) = (metal / influent Total Phosphorus) ÷ removal rate η

Divide the three numbers from the US manual: 1.38÷0.75=1.84, 1.72÷0.85=2.02, 2.3÷0.95=2.42. The three numbers immediately fall into the 1.5~2.5 range of the German β, which matches the statement that "β is between 1 and 2.5, and reaches 3 under poor conditions." Conversely, converting the GB 1.5~3.0 to "phosphorus to be removed" based on the 75% removal rate gives 2.0~4.0—30% to 150% higher than when Germany takes 1.5.

Table 1 Denominator comparison and conversion of three "molar ratio" definitions
SystemOriginal wordingDenominatorTypical valueConverted to "phosphorus to be removed"
German dosing coefficient βMetal moles / moles of phosphorus to be removed by precipitationPhosphorus to be removed1.5 (effluent below 1 mg/L); 2~3 under poor conditions1.5
US EPA / WEF manualMetal moles / moles of influent Total PhosphorusInfluent Total Phosphorus1.38 / 1.72 / 2.3 (corresponding to 75% / 85% / 95%)1.84 / 2.02 / 2.42
GB 50014—2021, Article 7.10.5Molar ratio of coagulant dosed to Total Phosphorus in sewageInfluent Total Phosphorus (literal)1.5~3.0; may be increased when effluent is below 0.52.0~4.0 (based on 75% removal rate)
Conclusion of this section: For the same "1.5", the phosphorus used as the denominator differs by 4.4 times (influent 4.0 mg/L versus to-be-removed 0.9 mg/L), and the chemical dosage differs by 4.4 times. Whenever "molar ratio 1.5" is written in a design document, the denominator must be clearly stated at the same time—otherwise anyone can calculate a different number for this chemical dosing list, and every number can claim to be compliant.

III. From Moles to Kilograms: The Two Numbers 0.87 and 1.80

Once the denominator is fixed, the second step is to convert the molar ratio into mass. This step is pure stoichiometry and requires only three numbers: aluminum 26.98, iron 55.85, and phosphorus 30.97. Converted into commonly used engineering coefficients, this means 0.871 kg aluminum and 1.803 kg iron per kg of phosphorus (theoretical values, β=1).

Note that this mass ratio is "metal" to "phosphorus," not "chemical agent" to "phosphorus." The scale on the on-site dosing pump reads in liters per hour, the drum is labeled in tons, and the control room records in mg/L. Between these three numbers lie two levels of conversion: first from metal to commercial chemical agent (divided by the active ingredient content), then from commercial chemical agent to dosing concentration (divided by density or calculated by solution concentration). Many disputes where "the calculated value differs from the actual by a factor of two" die at these two levels.

Table 2 Converting molar ratio to mass: metal dosage and precipitate quantity (per kg phosphorus)
βAl dosage required, kgFe dosage required, kgAl-side precipitate, kg (AlPO₄+Al(OH)₃)Fe-side precipitate, kg (FePO₄+Fe(OH)₃)
1.0 (theoretical)0.871.803.944.87
1.51.312.705.206.59
2.01.743.616.468.32
3.02.615.418.9711.77
6.05.2310.8216.5322.12

The last two columns of Table 2 deserve a separate look: as β increases from 1 to 6, the metal dosage rises only 6 times, while the precipitate increases 4.2 times to 4.5 times—because the portion of metal beyond the stoichiometric requirement does not disappear; it hydrolyzes into hydroxides and settles out together. On the Al side, the precipitate per kg phosphorus rises from 3.94 kg to 16.53 kg, and on the Fe side from 4.87 kg to 22.12 kg. This is why "adding more chemicals" does not just add one more line of reagent cost to the bill.

IV. From Metal to Drum: Commercial Chemical Content Table

The calculated metal amount is 1.31 kg aluminum, but what is purchased on site is liquid polyaluminum chloride, labeled with an alumina content of 10%. In 10% Al₂O₃, aluminum accounts for 52.93% (because the molecular weight of Al₂O₃, 101.96, contains two aluminum atoms), so the aluminum content of this drum of chemical is 5.29%, and 1.31 kg aluminum requires 24.7 kg of liquid. If switched to solid aluminum sulfate (octadecahydrate), the aluminum content is 8.10%, requiring only 16.1 kg; if switched to 40% ferric chloride liquid, the iron content is 13.78%, and at a 1.5 molar ratio, 19.6 kg of liquid is required per kg of phosphorus.

Table 3 Effective Components and Equivalent Dosage of Common Phosphorus Removal Chemicals (β=1.5, per kg P)
ChemicalEffective Component SpecificationMetal ContentProduct Mass kgAlkalinity Consumption per kg Chemical kg (as CaCO₃)
Ferric Chloride Liquid 40%FeCl₃ 40%Fe 13.8%19.60.370
Ferric Chloride SolidFeCl₃·6H₂OFe 20.7%13.10.555
Aluminum Sulfate SolidAl₂(SO₄)₃·18H₂OAl 8.1%16.10.450
Aluminum Sulfate LiquidAl₂O₃ 8%Al 4.2%30.90.235
Polyaluminum Chloride LiquidAl₂O₃ 10%Al 5.3%24.70.294
Polyaluminum Chloride SolidAl₂O₃ 30%Al 15.9%8.20.883
Ferrous SulfateFeSO₄·7H₂OFe 20.1%13.50.540
Polyferric Sulfate LiquidTotal Iron 11%Fe 11.0%24.60.295
An easily overlooked detail: The statement "how much alkalinity 10 mg/L consumes" can differ by a factor of two across different sources. Neo's technical note states that "10 mg/L of aluminum sulfate consumes 4.5 mg/L of alkalinity (as CaCO₃)", which is calculated based on anhydrous aluminum sulfate (molecular weight 342); when converted to the most common octadecahydrate form in China (molecular weight 666), the same 10 mg/L consumes only 2.25 mg/L. The factor-of-two difference is not a calculation error by anyone — it is because the term "aluminum sulfate" refers to different substances in the two sources.

V. The Real Primary Variable Is the Effluent Target, Not the Influent Concentration

What was discussed above is the cross-sectional discrepancy in definitions, but there is another longitudinal variable: how low you need to bring the effluent. In the standards, this is handled with a soft statement—"when the Total Phosphorus concentration in the effluent is below 0.5 mg/L, the molar ratio may be appropriately increased." The word "appropriately" is left to the designer, whereas foreign references specify this tier structure rigidly: 1.5 to 2.0 corresponds to effluent 1 mg/L, 2.5 to 3.5 corresponds to 0.25 mg/L, and 3.5 to 5 and above corresponds to 0.1 mg/L.

The operating records of the Rock Creek Wastewater Treatment Plant in Oregon, USA, serve as a good supporting evidence. The influent Total Phosphorus at this plant is approximately 6 mg/L, and the target dosage rate for alum addition in the tertiary clarifier is dry alum to phosphorus 50:1 (mass ratio, not stoichiometric), which converts to a molar ratio of approximately 4.65; operational analysis also found that when the aluminum to Total Phosphorus molar ratio in the secondary effluent is between 5:1 and 7:1, the final effluent Total Phosphorus can be below 0.1 mg/L. Its discharge limit is a monthly average of 0.11 mg/L, with a measured monthly average of 0.07 mg/L and a monthly mean range of 0.05 to 0.1 mg/L. The same report contains an even more critical operational experience: as long as the Suspended Solids in the final effluent is below 1.5 mg/L, the phosphorus limit can typically be met.

This statement changes the nature of the problem. When chemical phosphorus removal achieves 0.1 mg/L, the bottleneck is no longer whether there is enough chemical dosage, but rather whether the sludge has captured it—because a considerable portion of the phosphorus in the effluent is not in the water but in the body of the Suspended Solids. Based on an Activated Sludge phosphorus content of 2.5% to 5%, 1 mg/L of SS will carry out 0.025 to 0.05 mg/L of Total Phosphorus. Working backward: for effluent Total Phosphorus of 0.3, SS must be suppressed to 6 to 12 mg/L; for 0.1, SS must be suppressed to 2 to 4 mg/L. A conventional secondary clarifier cannot deliver this figure, so projects below 0.3 almost without exception incorporate filtration or membranes.

Table 4 The effluent target determines the molar ratio, and also determines which level of solid-liquid separation must be selected
Effluent Total Phosphorus TargetCommonly Used Molar Ratio in EngineeringPAC (10%) Dosage mg/L
(when 0.9 mg/L needs to be removed)
Allowable Effluent SS mg/LTerminal Solid-Liquid Separation Requirement
1.01.5~2.022~3020~40Secondary clarifier is sufficient
0.52.0~2.530~3710~20Secondary clarifier operates stably
0.32.5~3.537~526~12Filtration required
0.13.5~6.052~892~4Filtration or membrane, and high excess dosage required
Comparison of PAC dosage under five calculation bases at the same plant
Figure 1 The same "1.5" can be calculated as twenty-two to three hundred ninety-five. For the same 10 万 m³/d plant (influent Total Phosphorus 4.0, secondary clarifier effluent 1.2, target 0.3), changing only the denominator and the molar ratio, the PAC (10% Al₂O₃ liquid) dosage spreads from 22 mg/L to 395 mg/L. This figure is a numerical relationship chart plotted according to the formulas in the text.
Relationship between effluent target and molar ratio, allowable SS
Figure 2 For each step the target is lowered, the molar ratio rises by a notch, and SS is the first to reach its limit. The columns are commonly used molar ratios in engineering, and the broken line is the allowable SS when all effluent Total Phosphorus is carried out with Suspended Solids (using the strict basis of sludge phosphorus content 5%). This figure is a numerical relationship chart plotted according to the formulas in the text.

VI. Alkalinity Balance: The Largest Item Is Not Phosphorus Removal

Dosing aluminum or iron salts consumes alkalinity, and the mechanism is metal ion hydrolysis:

Me³⁺ + 3H₂O → Me(OH)₃↓ + 3H⁺

Each mole of trivalent metal releases 3 moles of hydrogen ions, i.e. consumes 3 equivalents of alkalinity. Converted to the commonly used engineering coefficients: each mg/L of aluminum consumes 5.56 mg/L of alkalinity (as CaCO₃), and each mg/L of iron consumes 2.69 mg/L. This conversion is quite intuitive—take 3 equivalents, divide by the atomic weight, then multiply by 50 (the equivalent weight of CaCO₃): for aluminum it is 3÷26.98×50=5.56, and for iron it is 3÷55.85×50=2.69.

The German design formula writes this directly into its estimation equation (Equation 7 cited in the Hach white paper):

δKs = 0.035×(influent ammonia nitrogen + effluent Total Nitrogen) + 0.14×(influent Total Phosphorus − effluent orthophosphate)

The unit is mmol/L of acid capacity. The first term is alkalinity consumed by Nitrification, and the second is alkalinity consumed by phosphorus removal. The coefficient 0.14 is worth calculating: 1 mg/L of phosphorus is 0.0323 mmol/L, and 0.14÷0.0323 equals 4.34, i.e. each mole of phosphorus consumes 4.34 equivalents of alkalinity—exactly corresponding to 3 equivalents/mole of metal when β is about 1.45. This 0.14 already incorporates the assumption of β=1.5; it is not a purely theoretical value.

But what really eats up the alkalinity is not phosphorus removal. Nitrification consumes 7.14 mg/L of alkalinity per 1 mg/L of ammonia nitrogen oxidized (2 moles of bicarbonate per 1 moles of ammonia nitrogen), and Denitrification can recover about half of it. For a plant with influent ammonia nitrogen of 30 mg/L and influent alkalinity of 250 mg/L, Nitrification alone requires 214 mg/L, Denitrification recovers 107 mg/L, leaving a net 143 mg/L; while PAC dosed at 100 mg/L consumes only 29 mg/L, and dosing up to 300 mg/L consumes 88 mg/L.

The weight relationship in this section must be put right: phosphorus removal chemicals usually account for only a little over ten percent of alkalinity consumption, while Nitrification accounts for more than eighty percent. But this does not mean the phosphorus removal chemicals are innocent—they are the last straw. The margin was originally only a little over one hundred, and phosphorus removal takes another thirty to ninety, pushing it below the target line of 50 mg/L; once pH collapses, the first thing to stop is precisely Nitrification, and once Nitrification stops, ammonia nitrogen rises and alkalinity is further consumed, setting off a positive feedback. Conversely, if a plant is already adding alkali, first check the balance between Nitrification and Denitrification, then check the phosphorus removal chemicals—do not reverse the order.
Breakdown of alkalinity consumption
Figure 3 The largest item on the alkalinity account is not phosphorus removal. Influent alkalinity is estimated at 250 mg/L and ammonia nitrogen at 30 mg/L, with each sub-item converted by equivalents; below is the superimposed margin, and the gray box is the target alkalinity band of 50~100 mg/L. This figure is a numerical relationship diagram drawn according to the formulas in the text.

VII. Sludge account: which molar ratio do the 20~35% given in the code correspond to?

Article 7.10.6 of GB 50014—2021 says only that "the amount of sludge generated during chemical phosphorus removal should be considered," and the clause explanation gives three levels: pre-dosing increases sludge by 40% to 75%, post-dosing by 20% to 35%, and simultaneous dosing by 15% to 50%. The order of the three levels is worth noting—pre-dosing has the largest sludge increment, because it also captures an additional batch of Suspended Solids in the primary clarifier; simultaneous dosing has the lowest lower bound, because the precipitate is directly mixed into the excess sludge and discharged together, without adding a separate sludge stream.

The problem is that these three percentages have no matching dosage. Back-calculating from the precipitate product amounts in Table 2: for a plant of 10 万 m³/d with influent BOD 200 mg/L and yield 0.9 kgDS/kgBOD, the biological sludge is about 18000 kg/d, equivalent to a concentration of 180 mg/L. If iron salt is dosed for a required removal of 0.9 mg/L at β=1.5, the chemical sludge is only 5.9 mg/L, an increment of 3%; raising β to 3.5 gives an increment of 7%; raising β to 6 gives an increment of 11%. To reach the 20% to 35% stated in the code, one must take influent Total Phosphorus at 4.0 mg/L and β at 2.3 to 4.0.

Table 5 Same plant, different dosing bases, chemical sludge can differ by an order of magnitude
Basis and βIron dose mg/LChemical sludge mg/LShare of biological sludge (180 mg/L)
Requires removal of 0.9, β=1.52.45.9+3%
Requires removal of 0.9, β=3.55.712.1+7%
Requires removal of 0.9, β=6.09.719.9+11%
Influent 4.0, β=1.510.826.4+15%
Influent 4.0, β=2.316.637.4+21%
Influent 4.0, β=4.028.960.9+34%
Influent 4.0, β=6.043.388.5+49%

So the two sets of figures in the specification are not contradictory; it is just that the two lower limits cannot be taken at the same time: taking the molar ratio as 1.5 and the sludge increment also as 20% does not add up; 1.5 only matches 15%, and 20% to 35% must be matched with β of 2.3 to 4.0. Which one should be followed when sizing the sludge system? Follow the upper limit. Because the consequence of underestimating sludge volume is that the dewatering machine, sludge pumps, and off-site disposal contracts all fall short together, and these are all contracted on an annual basis.

Another difference in basis needs attention: sludge increments given in foreign reviews are based on the treatment stage—primary treatment increases by 60% to 70%, secondary treatment increases by 5% to 25%, and secondary plus tertiary treatment increases by 45% to 60%. The numbers look different from GB because the denominators differ (the sludge base of primary treatment itself is small). When citing sludge increments across sources, the phrase "relative to the sludge of which stage" must be copied along with them.

VIII. Dosing Point: A Price List of Three Options

The choice of dosing point determines three things: whether the chemical can conveniently do other jobs at the same time, which sludge stream the precipitate mixes into, and whether the chemical will be wasted or backfire due to biological processes. The clause explanations of GB 50014 describe the pros and cons of these three methods very realistically.

Table 6 Comparison of Pre-, Simultaneous, Post-, and Multi-point Dosing
ModeDosing LocationPrecipitate DestinationSludge IncrementMain BenefitsMain Costs and Limitations
Pre-dosingPretreatment stage, generally dosed in the aerated grit chamberDischarged with primary sludge+40%~75%Also removes organics, reducing the load on the biological stageHighest total sludge volume; affects denitrification; residual phosphate must be controlled at 1.5~2.5 mg/L for biological use
Simultaneous dosingUpstream of the biological tank inlet or inside the tankDischarged with excess sludge+15%~50%No additional sludge system requiredAcidic chemicals lower pH, which is unfavorable for nitrification; not suitable for biological contact oxidation tanks or Biological Aerated Filter / BAF, as it will clog the media
Post-dosingAfter the biological system, with a coagulation reaction tank and final sedimentation tankForms separate chemical sludge+20%~35%Good effluent quality; most plants achieving Grade I-A or above use this methodHigh capital investment and operating costs; separate coagulation and sedimentation facilities required; anionic coagulant aid should be added
Multi-pointBefore the biological tank, inside the tank, and before solid-liquid separationBelongs to the first three modes—Reduces total chemical dosage; flexible operationComplex control; the ratio at each point must be tuned on site

The absence of a column for "β values at each dosing point" in this table is intentional: GB 50014 only provides a uniform 1.5~3.0 without tiering by dosing point; moreover, by definition the German dosing coefficient β strictly applies only to post-precipitation. Pre-dosing and simultaneous dosing require two additional calculations—the unreacted chemicals returned in the return sludge (equivalent to a portion of free dosing), and the phosphorus already removed by the primary sedimentation tank and the biological process itself. Directly applying the post-dosing β to pre-dosing would be wrong in direction. If a value must be assigned to pre-dosing in engineering practice, it can only be obtained through jar tests and on-site tuning, not copied from standards.

There are two more hard constraints that are easily overlooked. First, ferrous salts must first be oxidized to ferric salts before phosphorus removal can be achieved, so they are generally not used as a coagulant for post-dosing; when dosed upstream, they should be added at aerobic locations such as the aerated grit chamber so that they can be oxidized as quickly as possible. Second, simultaneous dosing is not advisable in biological filters, as precipitates will clog the media—this point is often overlooked in upgrading projects converted to MBBR or Biological Aerated Filter / BAF, where the dosing points are copied from old drawings.

One more point deserves separate mention: the clause explanation notes that the supernatant from anaerobic sludge treatment, the filtrate from dewatering machines, and the supernatant from thickening tanks contain very high phosphorus, and returning them to the wastewater treatment system will cause a "vicious cycle of phosphorus," increasing the burden on biological phosphorus removal; chemical phosphorus removal can be performed before return. This stream typically accounts for only 1% to 2% of the flow, but its Total Phosphorus / TP load can account for 10% to 30% of the whole plant—those who dose by flow will miss it, while those who dose by load will see it.

IX. Chemical Dosing Sheets from Five Real Plants

After the theory, let's look at the field. The table below shows the actual dosing rates from five publicly available engineering cases, all in the advanced phosphorus removal stage (magnetic coagulation or magnetic media coagulation), with targets at two levels: 0.3 and 0.1.

Table 7 Actual chemical dosage sheets of five advanced phosphorus removal projects
ProjectProcessPAC (10%) mg/LTotal Phosphorus mg/LOther ChemicalsResults and Cost
A plant in Chongqing 7.5 万 m³/dModified Oxidation Ditch + Cloth Media Filter, followed by Magnetic Media Coagulation Sedimentation98—→0.10PAM 0.95 mg/L; magnetic powder supplement 1.73 mg/L90% compliance rate reaches Quasi-Class IV; direct cost 0.1110 元/m³, chemicals account for 85.41%; investment 468 元/(m³/d)
A plant 20 万 m³/dMagnetic Coagulation Clarifier (5 units, 5 万 m³/d each)45~901.1→0.18PAM 0.8~1.5 mg/L; magnetic powder consumption 7~8 mg/LRemoval rate 84%, stably below 0.3
Xincheng Water Quality Purification PlantMagnetic Coagulation Sedimentation Tank90~120—→0.3PAM 0.5~1.0 mg/L; magnetic powder pre-dose 5 g/L, daily supplement 100 kgTotal phosphorus removal rate 97.9%; optimal PAC in jar test 150 mg/L, removal rate 92.8%
A plant 7 万 m³/dModified AAO + Secondary Clarifier + Magnetic Coagulation + Precision Filtration1003.8→0.18Magnetic powder 5~10 g/L; PAM 5 mg/LRemoval rate 95.3%, effluent meets Surface Water Class V
A upgrading projectMagnetic Coagulation High-Density Sedimentation35—PAM 1.5 mg/L; magnetic powder 39 mg/LChemical cost 0.115 元/m³ (PAC 0.09 + PAM 0.015 + magnetic powder 0.01)

There is an interesting comparison in this table: the plant with 7 万 m³/d has influent total phosphorus of 3.8 mg/L and PAC dosage of 100 mg/L, giving a back-calculated β of about 1.7; the plant with 20 万 m³/d has influent of 1.1 mg/L and PAC dosage of 45 to 90 mg/L (average about 68), giving a back-calculated β of about 4.5. The PAC dosage of the two plants differs by only 1.5 times, yet the influent total phosphorus differs by 3.5 times. This indicates that the on-site dosage is not linearly proportioned to the influent load, but is set according to "how low the effluent needs to be"—the plant with high concentration relies on the biological stage to remove the bulk first, with the chemical stage only polishing; the plant with low concentration instead relies on excess dosage to press residual phosphorus to the limit.

This also explains a common confusion: why a dosing system that "doses chemicals according to influent phosphorus" always falls short in the low-concentration range. Because chemical phosphorus removal in the low-concentration range has the worst efficiency—the lower the phosphorus concentration, the higher the proportion of metal ions scavenged by hydroxides, and the greater the excess multiple required per unit of removal. Studies comparing three molar ratio levels of 1:1, 1:2, and 1:3 show that the phosphorus recovery rates for aluminum salts are 59.2%, 81.8%, and 94.0%, and for iron salts are 34.6%, 60.0%, and 82.7%—with the same threefold dose, aluminum salts rise from 59 to 94, and iron salts rise from 35 to 83, and the shapes of the two curves also differ.

10. Price Comparison: Converted to CNY/kg P, Liquid and Solid Are Almost the Same

The last multiplier is price. The most common mistake here is to directly compare "CNY/ton"—liquid polyaluminum chloride at 800 元/ton and solid at 2500 元/ton appear to differ threefold; but the active ingredient also differs threefold (10% vs. 30% Al₂O₃), and converted to "CNY/kg Al" it is 15.1 vs. 15.7, almost the same.

Table 8 When converted to effective metal and unit phosphorus, the price difference disappears
ChemicalUnit Price CNY/tMetal ContentCNY/kg MetalCNY/kg P at β=1.5
PAC Liquid 10% Al₂O₃800Al 5.3%15.119.8
PAC Solid 30% Al₂O₃2500Al 15.9%15.720.6
Ferric Chloride Liquid 40%1200Fe 13.8%8.723.6
Ferric Chloride Liquid 40%1500Fe 13.8%10.929.4

The prices in Table 8 are assumed values, and the basis for these values can be verified: for that project in Chongqing, PAC 98 mg/L, PAM 0.95 mg/L, the direct cost is 0.1110 元/m³, with chemicals accounting for 85.41%, i.e., chemicals 0.0948 元/m³. Calculated at PAC 800 元/ton, 98 mg/L is 0.0784 元/m³; calculated at PAM 1 万 CNY/ton, 0.95 mg/L is 0.0095 元/m³; the two items add up to 0.0879 元/m³, and adding magnetic powder 1.73 mg/L lands exactly near 0.0948. Back-calculating, the PAC unit price for this project is around 800 元/ton.

A point that needs to be verified against the original source: Some literature estimates based on "consumption of 2.47 t polyaluminum chloride per ton of total phosphorus treated, at a cost of 0.25 万 yuan," and from this draws the conclusion that aluminum salts are the most economical. However, back-calculating according to the aluminum-to-phosphorus molar ratio of 1.3, each ton of phosphorus requires 1.13 t of aluminum; if the chemical contains 5.29% aluminum (10% Al₂O₃), then 21.4 t of commercial liquid product is required, not 2.47 t. The aluminum content implied by 2.47 t is 45.7%, higher than any commercial polyaluminum chloride—it actually corresponds to the basis of "measured as pure Al₂O₃" (the aluminum content of pure Al₂O₃ is exactly 52.9%). The two bases differ by a factor of 10; if not unified when comparing prices across the board, the conclusion will be completely reversed.

XI. The Other Half of the Bill for Overdosing

To press the effluent from 0.5 down to 0.1, the chemical dose must be increased two to three times, and what follows is not just the chemical cost:

First, effluent metals. According to the literature, under the conditions of β=1.5, simultaneous precipitation, and neutral pH, effluent aluminum and iron generally do not exceed 1.0 mg/L; after passing through a flocculation filter, they are generally less than 0.5 mg/L. The basic control items of GB 18918 do not include aluminum and iron, and the limit for aluminum in GB 5749 is 0.2 mg/L. In other words, the metals overdosed to meet total phosphorus standards have no corresponding assessment item in the discharge standards—this bill falls on downstream water plants or receiving water bodies.

Second, salinity. Ferric chloride carries chloride ions, and aluminum sulfate carries sulfate radicals. Calculated at β=1.5 and requiring removal of 0.9 mg/L, dosing 40% of ferric chloride liquid is about 17.6 mg/L, introducing about 4.6 mg/L of chloride ions; this amount is not visible at the discharge outlet, but in reclaimed water reuse systems it will accumulate round after round.

Third, the nature of the sludge, not just the quantity. Sludge formed by metal hydroxides is bulky and difficult to dewater, a point specifically noted in the clause explanations of the specification. For the same dry solids content, chemical sludge has poorer dewatering performance than biological sludge, the cake moisture content is harder to press down, and the unit price for off-site disposal is calculated per ton—this part of the cost is not on the chemical bill, but on the sludge disposal contract.

Fourth, "false compliance." After dosing, the total phosphorus figure comes down, but if SS simultaneously rises, the phosphorus in the effluent has merely changed from dissolved to particulate form; the filtrate at the moment of sampling may meet the standard, but the actual total phosphorus discharged has not decreased by that much. This is also why projects at the 0.1 mg/L level almost always monitor SS and turbidity simultaneously during acceptance—it is not redundant, but because the phosphate has already been captured by the flocs, and the remaining problem lies entirely in solid-liquid separation.

XII. An Executable Checklist

Condense the formulas in this article into eight items, and check them one by one when doing design or accounting:

  1. Define the denominator first. When writing "molar ratio 1.5", you must specify whether the denominator is the influent Total Phosphorus or the phosphorus to be removed; the two differ by one removal rate, and that is exactly the gap between 1.5 and 2.0.
  2. Then define the target. For effluent 1.0, use 1.5 to 2.0; for 0.5, use 2.0 to 2.5; for 0.3, use 2.5 to 3.5; for 0.1, use 3.5 to 6. Do not use 1.5 to meet the target of 0.1.
  3. Convert the metal into a commercial product. 0.871 and 1.803 are metal-to-phosphorus ratios; divide by the active ingredient content to get tonnage. For liquids, check the content labeling convention (Al₂O₃ or FeCl₃), and for solids, check the water of crystallization.
  4. Calculate alkalinity at the same time. Each mg/L of aluminum consumes 5.56, and each mg/L of iron consumes 2.69 (as CaCO₃); first deduct 7.14 mg/mg ammonia nitrogen for Nitrification, then check whether the remainder is sufficient for 50 mg/L.
  5. Calculate sludge at the same time. Calculate based on the precipitate product quantity in Table 2, not by a rough percentage; select the sludge system according to the upper limit. When the molar ratio is 1.5, the increment is only 3% to 15%; when it is 4.0, it reaches 35% to 49%.
  6. Check the compatibility of the dosing point with the process. Ferrous salts are not used for post-dosing; Biological Aerated Filter / BAF and MBBR should not be dosed simultaneously; for pre-dosing, leave 1.5 to 2.5 mg/L of phosphorus for the biological stage.
  7. Do not overlook return flows. The Total Phosphorus load from anaerobic supernatant, dewatering filtrate, and thickener supernatant can account for 10% to 30% of the whole plant; dosing by flow rate alone will miss it.
  8. Below 0.3, ask about SS first. For effluent Total Phosphorus 0.1, SS is required to be 2 to 4 mg/L; the secondary clarifier cannot provide this number. Settle the solid-liquid separation first, then discuss chemicals.
One sentence to close: Chemical phosphorus removal is the chapter with the simplest formulas in the whole series—one molar ratio, one molecular weight, one division. Its difficulty is not in the chemistry, but in the basis: which phosphorus is the denominator, which number is the target, and which content the chemical has. Once these three questions are answered, the question of how many kilograms of chemical are needed for 1 kg phosphorus actually has only one answer.

References

  1. National Standard of the People's Republic of China. Standard for Design of Outdoor Wastewater Engineering GB 50014—2021[S]. Section 7.10 Chemical Phosphorus Removal and Clause Explanations 7.10.1~7.10.7.
  2. National Standard of the People's Republic of China. Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant GB 18918—2002[S].
  3. National Standard of the People's Republic of China. Standards for Drinking Water Quality GB 5749—2022[S].
  4. US EPA / New Jersey DEP. Nutrient Control Design Manual, Chapter 4: Phosphorus Removal by Chemical Addition[R]. 2010.
  5. WEF, ASCE. Design of Municipal Wastewater Treatment Plants[M]. 4th ed. 1998.(Cited from reference 4)
  6. US EPA. Advanced Wastewater Treatment to Achieve Low Concentration of Phosphorus[R]. EPA 910-R-07-002, 2007.(Operating data of Rock Creek Wastewater Treatment Plant)
  7. Hach. Controlling the acid capacity on wastewater treatment plants[R]. Application White Paper, Equations 5~7.
  8. Neo Water Treatment. Preserving Alkalinity During Phosphorus Removal from Wastewater[R]. Technical Note.
  9. MCBA. Nutrient Neutrality & Low Phosphorus Consents: The Engineering[R]. 2024.(Molar ratio tiers and 10 ML/d calculation example)
  10. Detailed Explanation of Chemical Phosphorus Removal Dosage Calculation[EB/OL]. BJX Environmental Protection Network, 2020-04-09.(German dosage coefficient β and aluminum chloride calculation example)
  11. Park T, Ampunan V, Maeng S K, et al. Application of steel slag coated with sodium hydroxide to enhance precipitation-coagulation for phosphorus removal[J]. Chemosphere, 2016.(Comparative data of molar ratios 1:1, 1:2, 1:3, cited from reference 12)
  12. Processes and drivers of biological and chemical phosphorus removal in wastewater treatment plants[D]. DivA Thesis, 2019.
  13. Zhang Meng, Qiu Lin, Yu Xiaoqing, et al. Comparative Study on Phosphorus Removal Processes by Ferrous Salts and Ferric Salts[J]. Journal of Chemical Engineering of Chinese Universities, 2013(3): 519-525.
  14. Xing Wei, Huang Wenmin, Li Dunhai, et al. Mechanisms of Iron Salt Phosphorus Removal Technology and Research Progress of Iron Salt Coagulants[J]. Water & Wastewater Engineering, 2006, 32(2): 88-91.
  15. Xie Jingliang, Liu Eqing, Zhao Xin, et al. Phosphorus Removal Efficiency of Iron Salts in Different Forms[J]. Chinese Journal of Environmental Engineering, 2012, 6(10): 3429-3432.
  16. Comparison of Phosphorus Removal Processes by Ferrous Salts, Ferric Salts, Polyferric Sulfate and Poly Aluminum Chloride[J]. Water Pollution and Treatment, 2019, 7(1).
  17. Application of Magnetic Medium Coagulation Sedimentation Process in Advanced Phosphorus Removal Retrofitting of Wastewater Treatment Plants[J]. Water & Wastewater Engineering (Chongqing 7.5 万 m³/d engineering case).
  18. Cases, Key Technical Parameters and Equipment of Magnetic Loading Coagulation Technology[EB/OL]. Lvheng Environmental Protection.(Operating data of 20 万 m³/d magnetic coagulation clarifier)
  19. Exploration on Optimization of Phosphorus Removal Conditions by Magnetic Coagulation Process in a Water Purification Plant[J].(PAC 90~120 mg/L, removal rate 97.9%)
  20. Magnetic Coagulation Sedimentation Technology for Wastewater Treatment Upgrading[EB/OL]. Wastewater Treatment Engineering Network, 2024-04-14.(PAC 35 mg/L, chemical cost 0.115 元/m³)
  21. A Review of Anoxic Wastewater Treatment: An Overlooked Aspect in Wastewater Treatment in Nigeria[J]. American Journal of Water Resources, 2019, 7(4).(Segmented data of lime dosage and sludge increment)

The data in this paper are all derived from publicly available standard clauses, journal papers and engineering reports, and the calculations can be verified using the coefficients in the text. The influent water quality and dosage of the cases follow the original reports; differences from the assumed working conditions in this paper have been noted in the text.