Equalization Tank: Flow Equalization Only Gets You 4.5 小时, Quality Equalization Needs 38 小时, 8 小时 Achieves Neither
The previous article discussed biodegradability, where what was replaced was the time scale; this article discusses the equalization tank, where what is replaced is the word "equalization" itself—flow equalization and quality equalization are fundamentally not the same thing; one is arithmetic, the other is exponential. For the same 480 m³/d plant, the three answers all called "equalization tank volume" are 90, 160, and 760 m³ respectively, differing by a factor of 8.4. Yet the national standard GB 50014 only states "should be provided," without a single word on how to calculate it; six industry codes give six sets of figures from 4 to 24 小时, with mixing power from 2 to 30 W/m³, a difference of 15 times. None of these eight lines of material provides the criterion for "why this number."
I. The national standard only says "should be provided"; the volume algorithm is empty
Throughout GB 50014—2021 "Standard for Design of Outdoor Wastewater Engineering," the entire provision on equalization facilities is one sentence. Article 7.1.6 original text: "Wastewater treatment plants with large variations in water quality and/or quantity should be provided with facilities for equalizing water quality and/or quantity." No volume, no retention time, no mixing intensity, no tank type. One word "should" hands this matter over to industry codes and experience.
Yet the same standard states in Article 7.1.3: "The capacity of a wastewater treatment plant shall be determined by the average daily flow." This sentence is worth pausing on—all structures in the plant are sized by average daily flow, so who handles the peak flow? The standard's answer is that "should" in Article 7.1.6. In other words, a standard that sizes by average flow hands the task of peak shaving to a tank with no volume algorithm. This is not an oversight of the standard; it is a delegation of authority; and the result of that delegation is six industry codes each writing its own set of numbers.
| Reference (Clause No.) | Publication Status | Effective Volume / Retention Time | Mechanical (Submersible) Mixing | Aeration Mixing | Tank Bottom Slope |
|---|---|---|---|---|---|
| GB 50014—2021 Clause 7.1.6 | National Standard | Not specified; only states "should be provided" | — | — | — |
| Technical Specification for Sugar Wastewater Treatment Engineering 6.3.3 | Draft for Comments | In the absence of data, 4~8 h of the maximum daily average hourly flow | 15~30 W/m³ (provided only when SS > 500) | Should not be less than 3 m³/(m²·h) | Not less than 0.005 |
| Technical Specification for Phosphate Fertilizer Industry Wastewater Treatment Engineering 6.4.2 | Draft for Comments | Based on 8~12 h average hourly flow; effective water depth 4~6 m | 4~8 W/m³ | 3~6 m³/(m²·h) | Not less than 0.01 |
| HJ 2004—2010 Slaughtering and Meat Processing 6.3.1.5 | Issued Version | 10~24 h, with appropriate consideration for accident emergency | 5~10 W/m³ | 0.6~0.9 Nm³/(h·m³) | Not less than 2% |
| Technical Specification for Chlor-Alkali Industry Wastewater Treatment Engineering 6.4.1.4 | Draft for Comments | Based on 12~24 h average hourly flow; effective water depth 4~6 m | 4~8 W/m³ | 3~6 m³/(m²·h) | Not less than 0.01 |
| HJ 2003—2010 Leather and Fur Processing 6.3.4.3 | Issued Version | Graphical method based on production cycle variation curve; equalization time should be greater than 20 h (single plant) and greater than 16 h (centralized processing zone) | 2~8 W/m³ | Should not be less than 3 m³/(m²·h) | Not less than 0.01 |
| Interim Provisions on the Standardized Construction of Sewage Collection and Treatment in Chemical Industry Parks of Hunan Province, Article 31 | Local Document | 8~24 h, or determined according to park scale and process characteristics | Homogenizing mixing or aeration | — | — |
Reading this table across, three ranges emerge: retention time from 4 to 24 小时, a factor of 6; mixing power from 2 to 30 W/m³, a factor of 15; tank bottom slope from 0.5% to 2%, a factor of 4. None of these three parameters can compensate for one another—you cannot save volume by making the slope steeper, nor can you replace retention time by increasing mixing intensity.
The more noteworthy issue is not the range, but the absence of criteria. Of the six values, only one comes with a trigger condition: the sugar industry document states "when wastewater SS is greater than 500 mg/L, a mixing device should preferably be installed in the equalization tank." The other five give ranges unconditionally, so readers can only pick within the range based on experience. The wider the range, the more the act of picking resembles a judgment call.
II. The Three Units Are Actually One Physical Quantity
In Table 1, the "aeration mixing" column shows two units: m³/(m²·h) and Nm³/(h·m³). The denominator of the former is tank area, and that of the latter is tank volume. Add the power-based W/m³, and the same "mixing" has three notations. Can they be converted? Yes—and the conversion changes the conclusion.
The energy for aeration mixing comes from the work done by bubble buoyancy. As bubbles rise from the tank bottom to the surface, the work done by buoyancy equals the weight of displaced water multiplied by the lift height:
P = ρ · g · Qa · H (Qa is air flow rate, H is effective water depth)
Dividing by tank volume V = A · H gives the mixing power per unit tank volume:
P / V = ρ · g · Qa / A = ρ · g · qa (qa is area-specific air flow rate)
The water depth H cancels out. This is an easily overlooked conclusion: when converting area-specific air flow rate qa to power density, it is independent of water depth—double the tank depth, and the work done by bubbles doubles, but the tank volume also doubles, exactly canceling out. If the specification gives volume-specific air flow rate qv, however, then P/V = ρ·g·qv·H, which is proportional to water depth; without stating the water depth, the number is unusable. Taking ρ = 1000 kg/m³, g = 9.81 m/s², ρ·g = 9810 N/m³, 1 m³/(m²·h) is 2.778×10⁻⁴ m³/(m²·s), and multiplying them gives 2.73 W/m³.
| Area-specific gas flow rate qa m³/(m²·h) | Converted power density W/m³ (independent of water depth) | Reference: conversion of tank-volume-specific gas flow rate (this column is independent of the left column, no correspondence) |
|---|---|---|
| 0.6 | 1.64 | Water depth 4 m: qa=2.4, 6.5 W/m³ |
| 1.0 | 2.73 | Water depth 5 m: qa=3.0, 8.2 W/m³ |
| 1.5 | 4.09 | Water depth 6 m: qa=3.6, 9.8 W/m³ |
| 2.0 | 5.45 | When qv=0.9: 4 m → 9.8; 5 m → 12.3; 6 m → 14.7 W/m³ |
| 3.0 | 8.18 | For the same qv, changing from 4 m to 6 m, the power density increases by 50% |
| 4.0 | 10.90 | — |
| 5.0 | 13.62 | — |
| 6.0 | 16.35 | — |
Looking back now at the two rows of Table 1, you will notice something interesting. HJ 2004—2010 gives two options for the same equalization tank: submerged mixing 5~10 W/m³, and air mixing 0.6~0.9 Nm³/(h·m³). Converted at an effective water depth of 4~6 m, the latter is 6.5~14.7 W/m³—falling in the same band as the former range it itself gives, with substantial overlap. In other words, the two rows of this specification state the same number, only in different units.
HJ 2003—2010 is even more straightforward: mechanical mixing 2~8 W/m³, aeration "should not be less than 3 m³/(m²·h)". The latter converts to not less than 8.18 W/m³, which lands exactly at the upper limit of its own range. One says "2~8", the other says "not less than 8.18" — both are given by the same source. This is not a contradiction; it is that the two formulations each imply a different dilution assumption: mechanical mixing is based on the whole-tank average, while aeration allows a margin for the non-uniformity of perforated-pipe air distribution.
Here is another set of empirical values that circulates more widely: mechanical mixing 4~8 W/m³, aeration mixing 1~3 m³/(m²·h). The latter converts to 2.73~8.18 W/m³, which overlaps substantially with the former and almost coincides digit for digit with the 2~8 of GB 50014. At this point one can say: four sources, four formulations, and once converted to the same unit they fall into the same band, roughly 2 to 10 W/m³. The 15-fold span in Table 1 (2 to 30) is mainly held up by one row — the 15~30 for sugar refining — and that happens to be the only row in the entire text that states a trigger condition. That these two things appear in the same specification is not a coincidence; this will be expanded in Section 9.
III. Flow equalization is arithmetic; quality equalization is exponential
Under the word "should" in Section 1 lie two completely different tasks, both called "equalization" in Chinese but two different terms in English: equalization of flow and equalization of quality. Their mathematical natures differ, and so do the required volumes.
Flow equalization: store the maximum difference of the cumulative curves
The method for flow equalization is the cumulative curve method from textbooks: plot the cumulative inflow line and the cumulative outflow line on the same graph (outflow at constant rate); the sum of the maximum positive deviation and the maximum negative deviation of the two lines is the required equalization volume. A publicly available worked example gives: maximum positive deviation 237.3 m³, maximum negative deviation 53.76 m³, summing to 291.06 m³, corresponding to an average residence time of 4.52 h. Back-calculating the average flow of this stream: 291.06 ÷ 4.52 = 64.39 m³/h, i.e. 1545 m³/d.
The nature of this method must be clearly understood: it is conservative, it is addition and subtraction. As long as the outflow is constant, a large enough tank can store it, regardless of tank type, mixing, or number of compartments. So the volume required for flow equalization is determined by only one thing — the daily variation coefficient of the inflow. A rough calculation based on a typical daily flow hydrograph: when the daily variation coefficient is 1.3, the required volume is about 10% of the daily water volume (2.4 h); when it is 1.5, about 17% (4 h). The worked example above falls at 4.52 h, corresponding to a daily variation coefficient of around 1.5.
Quality equalization: a first-order system, exponential decay
Quality equalization is not storing water, it is mixing water. When a stream of concentration 600 mg/L enters, the water in the tank does not immediately become 600; instead it climbs along an exponential curve. In process control this is a standard first-order system, with step response C(t) = C₀ + (Cin − C₀)(1 − e^(−t/τ)); after one time constant it is 63.2% complete, after three time constants 95.0%, and after five 99.3%.
However, the influent of industrial wastewater is not a step change but periodic fluctuation—by shift, by batch, by day and night. For periodic fluctuations, the steady-state response of a first-order system is amplitude attenuation rather than exponential climb. Let the fluctuation period be T and the residence time be τ, and the angular frequency ω = 2π/T; then the ratio of the effluent fluctuation amplitude to the influent amplitude is:
|G| = 1 / √(1 + (ω·τ)²) = 1 / √(1 + (2π·τ/T)²)
The model has four assumptions: constant tank volume, constant outflow, complete mixing within the tank, and no reaction consumption. Actual tanks have short-circuiting and dead zones, and the real reduction rate is lower than this formula—so all the numbers below are upper limits, not guaranteed values.
| Retention Time τ (h) | ω·τ | Effluent Residual Fluctuation | Reduction Rate | Corresponding Cutoff Period 2πτ (h) |
|---|---|---|---|---|
| 4 | 1.047 | 69.06% | 30.94% | 25.1 |
| 6 | 1.571 | 53.70% | 46.30% | 37.7 |
| 8 | 2.094 | 43.09% | 56.91% | 50.3 |
| 10 | 2.618 | 35.68% | 64.32% | 62.8 |
| 12 | 3.142 | 30.33% | 69.67% | 75.4 |
| 16 | 4.189 | 23.22% | 76.78% | 100.5 |
| 20 | 5.236 | 18.76% | 81.24% | 125.7 |
| 24 | 6.283 | 15.72% | 84.28% | 150.8 |
| 30 | 7.854 | 12.63% | 87.37% | 188.5 |
| 40 | 10.472 | 9.51% | 90.49% | 251.3 |
| 48 | 12.566 | 7.93% | 92.07% | 301.6 |
IV. What 8 小时 Filters Out and What It Does Not
Replace the T in the formula, and you can see what a tank "can control." Table 4 shows the residuals for the same set of retention times under four cycles.
| Fluctuation Period T | Corresponding Operating Condition | τ=8 h | τ=20 h | τ=40 h |
|---|---|---|---|---|
| 4 h | Batch change, cleaning, intermittent discharge | 7.93% | 3.18% | 1.59% |
| 8 h | One production shift | 15.72% | 6.35% | 3.18% |
| 12 h | Half a shift plus flushing period | 23.22% | 9.51% | 4.77% |
| 24 h | Day-night (shift system and cleaning cycle) | 43.09% | 18.76% | 9.51% |
| 48 h | Two days, before and after maintenance | 69.06% | 35.68% | 18.76% |
| 168 h | Weekly cycle (weekend shutdown) | 95.80% | 80.08% | 55.57% |
The reading is straightforward: for a tank with 8 小时, the batch-change fluctuation of 4 小时 is almost completely eliminated (residual 7.9%), the shift fluctuation of 8 小时 is eliminated by 84%, the day-night fluctuation of 24 小时 is eliminated by only 57%, and the weekly fluctuation of 168 小时 is essentially not eliminated at all (residual 95.8%).
Why is the order like this? Because a first-order system has a "cutoff period" equal to 2πτ. The cutoff period of the 8 小时 tank is 50.3 小时: fluctuations with periods shorter than it are suppressed, and fluctuations with periods longer than it are passed through. And the fluctuations of industrial wastewater happen to fall mainly on the long-period side—shift patterns 8 小时, batches 2 to 8 小时, day-night 24 小时, weekend maintenance 168 小时. The value 8 小时 sets the cutoff period at 50 小时, twice as long as the day-night cycle it is meant to manage, and three times shorter than the weekend it cannot manage.
V. To suppress it to 10%, 38 小时 is required
Invert the above equation: given a residual target r, find the required retention time. Let |G| = r, then ω·τ = √(1/r² − 1), so
τ = [√(1/r² − 1)] · T / (2π)
Taking T = 24 h, the values calculated step by step are shown in Table 5. The last column is converted to tank volume according to 480 m³/d (20 m³/h).
| Residual Target | ω·τ | Required τ (h) | Required Tank Volume (m³) | Equivalent to How Many Times the Daily Water Volume |
|---|---|---|---|---|
| 50% | 1.732 | 6.62 | 132 | 0.28 |
| 40% | 2.291 | 8.75 | 175 | 0.36 |
| 30% | 3.180 | 12.15 | 243 | 0.51 |
| 25% | 3.873 | 14.79 | 296 | 0.62 |
| 20% | 4.899 | 18.71 | 374 | 0.78 |
| 15% | 6.591 | 25.18 | 504 | 1.05 |
| 10% | 9.950 | 38.01 | 760 | 1.58 |
| 5% | 19.975 | 76.30 | 1526 | 3.18 |
This table explains something that has long been misjudged. For that 480 m³/d project treating maleic anhydride wastewater, the equalization tank was built to 800 m³ with a retention time of 40 小时, which looks like "overdesign"—peers go with 8 小时, while he went with 40 小时, making the tank five times that of others. But according to Table 5, 40 小时 corresponds to a residual of 9.51%, which is exactly configured to compress "±44% fluctuations down to ±10%". Another 200 m³/d project was built to 400 m³, 48 小时, corresponding to 7.9%, which is the same target. The water quality characteristics of these two projects are clearly documented: COD 6000~12000 mg/L, pH 2.0~3.5, B/C 0.20~0.28, daily variation coefficient 1.3~1.5. Once this kind of water fluctuates into the biological tank, recovery takes weeks, so the retention time buys insurance, not volume.
Now look at the cost of insufficient retention from the opposite direction. In a public case of knitted printing and dyeing wastewater in Taiwan, the daily discharge is 8000~10000 m³, and the retention time in the equalization tank is only 4 小时. The report's exact words are "the retention time is too short, losing the equalization effect." The influent COD fluctuates between 250~650 mg/L (the long-term average also given in the report is 350 mg/L; the midpoint of the range 450 and the mean 350 are not the same statistical basis, and this article estimates the relative half-amplitude 44.4% based on the midpoint of the range). The cause of unstable coagulation is directly attributed to this, with PAC dosed at 700 mg/L. Calculated according to the first-order model, the residual of 4 小时 for the daily cycle is 69.1%, and the effluent fluctuation still has ±30.7% (312~588 mg/L)—the small tank is not a feeling; it is the number 69%. The plant's later improvement plan was to increase the retention time of the equalization tank to 8 小时, add biological treatment before coagulation, and reduce PAC to 200~100 mg/L. Note that the improvement plan is two things: 8 小时 only reduces the residual from 69% to 43%; what really brings down the chemical dosage is the biological stage after it.
VI. The two volumes cannot be added together
Flow equalization requires 4.52 小时, and concentration equalization requires 38 小时, a difference of 8.41 times. These are not two numbers that can be averaged; their relationship is one-way:
- If sized for concentration equalization, flow equalization is automatically satisfied.This is because concentration equalization requires a larger tank volume, and its premise is constant outflow—constant outflow is itself the definition of flow equalization.
- If sized for flow equalization, concentration equalization is not solved at all.A tank of 4.52 小时 flattens the intraday flow, but only cuts the concentration fluctuation by 35.5% (at τ=4.52 h, the residual is 64.5%, slightly better than the 69.06% in the τ=4 row of Table 3).
Therefore, the term "equalization tank volume" itself is imprecise: it should be written as "flow equalization tank 90 m³ + concentration equalization retention time 38 h," or "this tank is designed for concentration equalization with a retention time of 38 h, and the flow equalization function is achieved by a constant-outflow pump." When written as "equalization tank 160 m³," one centimeter on the drawing, in reality no one knows which target it is satisfying.
Putting 8 小时 back into this coordinate system makes its position clear:it is 77% more than flow equalization (8 ÷ 4.52), and 79% less than concentration equalization (1 − 8 ÷ 38).It occupies neither end, but it is not entirely unreasonable—if the fluctuation cycle of this stream is only 4 小时 (batch discharge), the residual of a 8 小时 tank is 7.9%, which is completely sufficient; if the daily variation coefficient is around 1.3, a 8 小时 tank still has twice the surplus for flow equalization.The correct reading of 8 小时 is not a "standard value," but "sufficient for water with short-cycle fluctuations and a small daily variation coefficient."It became a habit because the discharge cycles of early industrial wastewater stations were mostly one shift.
VII. Compartmentalization is to prevent short-circuiting, not for concentration equalization
Since one tank is not enough, can it be divided into several compartments in series so that the water turns several times? This is the most common structural practice for equalization tanks (concentric circular baffled type, perforated guide-channel type, multi-compartment overflow series). Intuitively, "more turns, better mixing," but a calculation gives the opposite result.
For n equal-volume completely mixed tanks in series with a total retention time τ, each compartment has τ/n, and the overall transfer function is the product of the individual transfer functions:
|G|n = [1 + (ω·τ/n)²]^(−n/2)
| Number of tanks in series n | Hydraulic Retention Time per Tank (h) | Effluent Residual Fluctuation | Compared with Single Tank |
|---|---|---|---|
| 1 (single completely mixed tank) | 8.000 | 43.09% | Baseline |
| 2 | 4.000 | 47.70% | Worse by 4.6 points |
| 3 | 2.667 | 55.13% | Worse by 12.0 points |
| 4 | 2.000 | 61.60% | Worse by 18.5 points |
| 6 | 1.333 | 70.83% | Worse by 27.7 points |
| 8 | 1.000 | 76.71% | Worse by 33.6 points |
| 16 | 0.500 | 87.29% | Worse by 44.2 points |
The more tanks in series, the larger the residual, approaching plug flow (|G| → 1). This makes physical sense: plug flow merely delays the fluctuation for a period of time without changing its amplitude; only complete mixing shaves the peak. Dividing the water into 16 tanks is equivalent to turning it into a single pipe.
One boundary needs to be stated: this "the more compartments, the worse" rule is most obvious when ω·τ is between 1 and 3, that is, when a short tank faces a diurnal cycle. When the retention time is longer (ω·τ larger), two or three compartments in series will be slightly better than a single compartment—calculated by the same formula, at total τ = 20 h, two compartments give 12.73% and three compartments give 12.29%, both lower than the single compartment's 18.76%, but by eight compartments it returns to 24.02%. So compartmentalization is not monotonically harmful, but rather harmful in the interval where "tank volume is insufficient", which is exactly where the equalization tanks from 8 to 10 小时 are located.
So when is compartmentalization useful? Solving [1+(ωτ/2)²]^(−1) = [1+(ωτ)²]^(−1/2) gives ωτ = √8 = 2.828, i.e. τ = 10.8 h (T = 24 h). When the retention time is shorter than 10.8 小时, splitting into two compartments is actually less homogeneous; when longer than 10.8 小时, compartmentalization begins to be beneficial. Yet the design values of the vast majority of industrial wastewater stations are around 8 小时—exactly falling on the "worse when split" side.
VIII. Nominal, Effective, and Operating Water Levels: Three Layers of Discount
All the calculations above use "effective volume". Yet what is written on the drawings, in the tender documents, and in the operating reports are often three different numbers.
The first layer is freeboard and structure. A public case of silk reeling wastewater states it clearly: the equalization tank dimensions are 10.0 m × 5.0 m × 4.0 m, freeboard 1.0 m, effective water depth 3.0 m, effective volume 150 m³. The total volume is 200 m³, and the effective portion accounts for 75%. In this case 580 m³/d, 24.17 m³/h, 150 ÷ 24.17 = 6.21 h, which matches the reported "retention 6 小时"—indicating that the report used the effective volume, which is worth praising.
The second layer is the tank bottom slope. The code requires sloping toward the collection pit, with a slope of 0.005 (sugar), 0.01 (leather, phosphate fertilizer, chlor-alkali), 2% (slaughterhouse). The slope is not free; what it consumes is the wedge at the tank bottom:
- Tank length 20 m, slope 1%, water depth 4 m: slope drop 0.20 m, wedge accounts for 2.5% of the volume;
- Tank length 20 m, slope 2%, water depth 4 m: slope drop 0.40 m, wedge accounts for 5.0% of the volume;
- Tank length 30 m, slope 2%, water depth 4.5 m: slope drop 0.60 m, wedge accounts for 6.7% of the volume.
The steeper the slope, the better the sludge discharge, but the steeper it is, the more volume it consumes. The code writes both sides (requires slope, requires volume), yet does not write how to balance them—this is another source of the span in Table 1.
The third layer is the operating water level. Level control usually keeps the normal water level at 80%~85% of the tank height, leaving margin for alarms and emergencies. After the three layers of deduction, only 60%~70% of the nominal volume remains.
| Basis | Volume (m³) | Retention Time (h) | Daily Cycle Residual |
|---|---|---|---|
| Nominal Volume (drawing) | 800 | 40.00 | 9.51% |
| Effective Volume (deducting freeboard, slope, and sludge hopper, taken as 75%) | 600 | 30.00 | 12.63% |
| Operating Volume (further based on water level 85%) | 510 | 25.50 | 14.81% |
The design target was 10%, but the actual value obtained is 14.8%. What is missing is not the design, but the fact that the term "volume" has not been defined. This item does not require any new technology; it only requires clearly specifying the four words "effective volume" on the drawings and verifying the retention time based on the effective volume during acceptance.
IX. The 15-fold span of mixing power: what is missing is the criterion
Back to the column in Table 1, 2 to 30 W/m³. The previous section has already shown that, except for the sugar-making row, the other four, after normalization, all fall within the same band of 2 to 10. So what really needs explaining is not "why there is a 15-fold difference," but "why sugar-making needs an extra 2 to 4 times"—and that more dangerous question: is it right to directly transfer the 2~8 bracket to the equalization tank?
The task of mixing in an equalization tank is only one: keep what should not settle from settling. And the driving force of settling is the density difference between particles and water. The density of Activated Sludge flocs is about 1.005 g/cm³, with a density difference of 0.005; organic residue and bagasse pith about 1.05, a difference of 0.05 (10 times that of sludge); sand 2.65, a difference of 1.65 (330 times); chromium sludge (Cr(OH)₃) about 2.9, a difference of 1.9 (380 times); iron oxide scale 5.2, a difference of 4.2 (840 times).
If mixing power were proportional to density difference, then chromium sludge would require 380 times the power—that is, 760 to 3040 W/m³. No code gives this magnitude. This shows that density difference is not the whole determinant: what actually matters is the flow velocity field in the tank (whether the near-bottom velocity exceeds the incipient motion velocity of the particles), the tank geometry (flat bottom or conical bottom), and coordination with the sludge discharge cycle. Therefore, the span of 2 to 30 cannot be extrapolated by density difference, nor simply classified by industry.
So the only criterion that can be taken away from this column is not in the values but in the trigger condition: first ask what is to be suspended, what the density difference and order of magnitude of the suspended solids are, and whether the tank bottom has a sump and a sludge discharge cycle; then set the W/m³. The only row in Table 1 with a trigger condition (sugar-making's "when SS is greater than 500") happens to be one of the few that also gives the 15~30 bracket—this is not a coincidence.
X. Slope, sump, liquid level: get it right the first time in design
Half of the code provisions on equalization tanks are constructional requirements that "cannot be changed afterward." These provisions read as trivial, but they determine whether this tank can still be used ten years from now.
- Pool bottom slope and sump pit. HJ 2003—2010 Clause 6.3.4.3 e) requires that "the bottom of the equalization tank shall be provided with a sump pit, and the tank bottom shall have a slope of not less than 0.01, sloping toward the sump pit"; HJ 2004—2010 Clause 6.3.1.5 d) requires that "the slope design shall be not less than 2%". Without a sump pit, sludge removal can only be done by personnel entering the tank; if the slope is insufficient, sludge consolidates on the tank bottom, and the effective volume shrinks year after year.
- Overflow pipe leading to the emergency tank. The sugar industry specification states: the tank wall shall be provided with an overflow pipe, and the overflow pipe shall lead to the emergency tank. This sentence connects the two tanks—equalization tank overflow is not discharged, but enters the emergency tank.
- Level control and alarm. Item f) of HJ 2003, item e) of the phosphate fertilizer specification, and item d) of the chlor-alkali specification all include this clause. The liquid level is the only online state variable on the equalization tank; without it, the tank is a black box.
- Covers and odor removal. Item c) of HJ 2004: "To reduce odor impact, the equalization tank should be covered, and ventilation, exhaust and odor removal facilities shall be provided." High-concentration organic wastewater retained in the equalization tank for 20 to 40 小时 is equivalent to a natural anaerobic fermentation tank (Articles 11-02 of this series calculated the odor air volume and retention time).
- Corrosion protection and pH adjustment. Both the phosphate fertilizer and chlor-alkali specifications require corrosion protection treatment for the tank body, and "pH adjustment facilities should preferably be provided in the equalization tank" (the tanning specification places corrosion protection requirements under the tank material and source-segregated pretreatment clauses, not under the equalization tank clause). For maleic anhydride wastewater with an influent pH of 2 to 3.5, if the tank is not corrosion-protected, its service life is measured in years.
The common point of these five items is: none of them can be added later. Once the tank is poured, the slope is fixed; if no sump pit was left, sludge removal requires shutdown and opening a hole; if no level gauge interface was left, you can only look down from the tank top. Therefore, 80% of the equalization tank design quality lies in these five items, not in the retention time—if the retention time is too small, it can still be expanded; if the slope is made flat, the tank can only be rebuilt.
XI. Combined use as emergency tank: add the volumes or take the larger
Item b) of HJ 2003—2010 Clause 6.3.4.3 states: "When the equalization tank also serves as a comprehensive wastewater emergency tank, its volume calculation shall consider the capacity for emergency discharge, and may be determined according to the maximum hourly discharge volume of 2 h."
In this sentence, the word "consider" carries all the ambiguity. A quick calculation shows it. The maximum hourly discharge volume of 2 h = 2 × Kh × Qavg. Taking the hourly variation coefficient Kh = 1.5, the average flow of 3 小时 is obtained—which is even smaller than the 4.52 小时 required for the average volume. That is to say, if handled by "taking the larger", the emergency capacity is completely submerged by the equalization volume, and the "combined use" is free of charge, costing nothing.
But the physical constraints of emergency water are not like this. Emergency water (extreme pH, excessive toxic substances, sudden concentration spikes) cannot enter the biological system, and must be stored and slowly returned. It requires independent space above the normal water level, that is, addition, not taking the larger:
- Taking the larger: max(4.52, 3.0) = average water volume of 4.52 h;
- Addition: 4.52 + 3.0 = average water volume of 7.52 h;
- The difference between the two is 66.4%.
Item c) also adds a third volume segment: "When initial rainwater needs to be treated, the equalization tank shall consider the storage capacity for initial rainwater... when relevant data are lacking, 10~15 min may be taken." The magnitude of 10 to 15 minutes is small (0.17 to 0.25 小时), but it is yet another volume segment that can only be added, not taken as the larger—initial rainwater likewise cannot directly enter the biological system.
XII. The collection tank is not a small equalization tank
There are often two tanks at the front end of an industrial wastewater station: the collection tank and the equalization tank. They look similar, but they handle completely different things, and mixing them up will cause problems.
HJ 2004—2010 Article 6.3.1.4 stipulates for the collection tank: the effective volume "shall not be less than the discharge capacity of the largest working pump 5 min of the tank"; "the wastewater lifting pump should preferably be selected according to the maximum hourly flow rate (when no flow variation curve data is available, 3-4 times the average flow rate may be used)"; "the number of starts per hour shall not exceed six". GB 50014—2021 Article 6.3.1 gives the same family of figures: the sewage pump station shall not be less than the discharge capacity of the largest single pump 5 min (when automatically controlled, the number of starts per hour should preferably not exceed 6), the stormwater pump station shall not be less than 30 s, the combined sewage pump station shall not be less than 30 s, and the underpass stormwater pump station shall not be less than 60 s.
5 minutes is 0.083 小时. Compared with the 10 to 24 小时 of the equalization tank, the difference is 120 to 288 times. These two tanks handle two different things: the collection tank governs the number of pump starts and stops, while the equalization tank governs the fluctuation period of the water. Using a volume of 5 minutes to absorb the fluctuation of 24 小时 is equivalent to not absorbing it at all.
There is another coupling that is more easily overlooked: the pump capacity will in turn eat up the buffer of the tank. HJ 2004 allows the pump to be selected at "3 to 4 times the average flow rate when no curve is available". If the pump draws at 3.5 times the average flow rate and the tank stores at 8 小时 of the average water volume, when the inflow is at the mean value, the net outflow rate in the tank is 2.5 times the average flow rate, and 8 ÷ 2.5 = 3.2 小时 before it is drawn down to the low liquid level. That is to say, a tank of "8 小时" equipped with an oversized pump actually has a buffer of only 3.2 小时—while the residual of 3.2 小时 for the daily cycle is 76.7% (interpolated by the same formula), which is much worse than the 43.1% of 8 小时.
This point is the most practical: the retention time of the equalization tank is not determined by the tank volume alone, but jointly by "tank volume ÷ pump drawing capacity". When designing, selecting pumps according to the average flow rate and using variable frequency or a combination of large and small pumps is more cost-effective than making the tank larger.
XIII. Four Real Projects Placed Side by Side
Putting away all the formulas above, look at the actual values of four publicly disclosed projects. Columns 4 and 5 of Table 8 are residuals calculated by the first-order model, used for horizontal comparison, not measured values.
| Case | Scale and Water Quality Characteristics | Equalization Tank | Hydraulic Retention Time | Daily Cycle Residual (Estimated) |
|---|---|---|---|---|
| A Knitting and Dyeing Plant in Taiwan | 8000~10000 m³/d; average COD 350, influent fluctuation 250~650 mg/L; high salinity (approximately 10 t NaCl per day) | Equalization tank, HRT 4 h (later improved to 8 h, with contact aeration added) | 4 h → 8 h | 69.1% → 43.1% |
| A Maleic Anhydride Production Enterprise | 480 m³/d; COD 8000~12000, pH 2.0~3.5, B/C 0.20~0.25, salinity 5000~8000 mg/L, daily variation coefficient 1.3~1.5 | Effective volume 800 m³, equipped with mixing and online pH, ORP, COD | 40 h | 9.51% |
| Maleic Anhydride Washing Wastewater from an Energy Enterprise | 200 m³/d; COD 6000~9000, pH 2.5~4.0, B/C 0.22~0.28, low nitrogen and phosphorus | Effective volume 400 m³, equipped with mixing and online pH, COD | 48 h | 7.93% |
| A Garment Washing Plant in Shanghai | 600 m³/d; COD not high, B/C less than 0.3, color varies greatly with product type | Effective volume 200 m³, micro-aeration | 8 h | 43.09% |
| A Silk Reeling Mill | 580 m³/d; average COD of cocoon washing wastewater 11200 mg/L, mixed with cocoon cooking wastewater and domestic sewage before entering the equalization tank | Effective volume 150 m³ (total 200 m³), tank bottom i=0.01 sloping toward the collection pit, 2 submersible sewage pumps with one duty and one standby | 6 h (actual calculation 6.21 h) | 53.70% |
The HRT of the five cases ranges from 4 小时 to 48 小时, a difference of 12 times. However, when viewed together with water quality, the logic holds:
- 48 小时 and 40 小时: influent COD 6000~12000, pH 2 to 3.5, B/C just over 0.2; once fluctuation enters the biological stage, recovery takes weeks, so size it by "residual 10%" — exactly the correct use of Table 5.
- 8 小时: influent COD is not high, and fluctuation comes from product changeovers (short cycle); residual 43% is acceptable because coagulation sedimentation follows immediately, and the physicochemical stage itself is insensitive to fluctuation.
- 4 小时 is a counterexample: the report itself admits "loss of equalization effect"; the improvement direction is longer retention time + adding a biological stage.
- 6 小时 is the case of mixing high-concentration and low-concentration water: influent COD is in the tens of thousands but already diluted, and the homogenization demand is lower than the flow equalization demand, so 6 小时 holds.
Together these four points show one thing: the retention time of an equalization tank is not selected, it is calculated; the basis for calculation is "the period of influent fluctuation" and "the tolerance of the downstream process to fluctuation", and these two parameters are usually not written on the drawings. So everyone can only fall back on that 8 小时.
XIV. Summing this up in one sentence
An equalization tank is not a "tank", it is a filter. Its real design parameter is not volume but the time constant τ = V/Q; its real function is not "storing water" but multiplying the amplitude of influent fluctuation by 1/√(1+(2πτ/T)²). Once viewed this way, many arguments dissolve: how large the tank volume should be depends on how long a fluctuation period you want to filter out and how much is left after filtering; not on "industry practice being 8 小时".
And the true identity of 8 小时 is: just enough for water whose daily variation coefficient is around 1.3 and whose fluctuation is mainly at the shift scale. It was calculated thirty years ago and has been copied into codes today. Those who copy it do not know what it filters; those who use it do not know what it lets through — hence the two coexisting confusions: "the tank has 8 小时, yet Monday's influent still breaks through" and "the tank was built at 40 小时, and the boss asks whether it is a waste".
Nine field-executable points
- First split "equalization tank volume" into two numbers: equalization volume (cumulative curve method, V = maximum positive deviation + maximum negative deviation) and homogenization retention time (back-calculated from the residual target). Put both numbers on the same chart; do not merge them into one.
- Check the fluctuation period of the influent, not just the daily variation coefficient. Shift pattern 8 h, batch 2~8 h, diurnal 24 h, weekend 168 h — the residuals corresponding to these four periods differ by an order of magnitude (Table 4). Asking production for shift schedules and batch changeover records is more useful than asking the lab for daily averages.
- Back-calculate the required retention time with τ = [√(1/r²−1)]·T/(2π). First set the residual target r (generally 10%~20%, depending on the downstream process tolerance), then calculate τ, and finally multiply by average flow to get volume. Do not do it the other way round — set 8 小时 first and then explain it.
- Write "effective volume" and convert according to 75%. After deducting freeboard, sloped wedge volume, sludge hopper and operating water level, a nominal 800 m³ tank is actually only 510 m³ (Table 7). At acceptance, check retention time against effective volume.
- For mixing power, first ask what needs to be suspended. The density differences of activated sludge, organic scum, sand, chromium sludge and iron sheet span 840 times (Section 9); 2~8 W/m³ is an anoxic tank clause, not an equalization tank clause. When SS is high and inorganic particles are abundant, check against 15~30 W/m³.
- When citing the "aeration mixing" clause, check the units first. m³/(m²·h) can be converted directly to 2.73 W/m³; Nm³/(h·m³) requires water depth first — 0.6 in a 4 m tank is 6.5 W/m³, and in a 6 m tank is 9.8 W/m³.
- When retention time is shorter than 10.8 小时, do not rely on compartmentalization to improve homogenization. At the same total volume, two compartments in series have a residual 4.6 points higher than a single compartment (Table 6). Compartmentalization is for preventing short-circuiting; volume is for damping fluctuation — do the two things separately.
- When also serving as an emergency tank, calculate by "addition", not "taking the larger". The maximum discharge of 2 h is about 3 h of average flow, smaller than the equalization volume; taking the larger means no emergency space is reserved; after addition the difference is 66.4%. Also keep the normal operating water level below half the tank height, otherwise dual use is only a drawing note.
- Determine pumps together with the tank. Selecting pumps at 3~4 times average flow leaves only 3.2 小时 of buffer in a 8 小时 tank (Section 12). Pumps sized to average flow + variable frequency, or a combination of large and small pumps, saves more than making the tank larger.
References
- Ministry of Housing and Urban-Rural Development of the People's Republic of China. GB 50014—2021 Standard for Design of Outdoor Wastewater Engineering. Beijing: China Planning Press, 2021. (Article 7.1.3 "The scale shall be determined based on the average daily flow"; Article 7.1.6 "Wastewater treatment plants with large variations in water quality and/or quantity should be equipped with facilities to equalize water quality and/or quantity"; Article 7.1.7 "The number of treatment structures (compartments) shall not be less than 2, and shall be designed in parallel")
- GB 50014—2021 Article 6.3.1 Volume of collection tank (for wastewater pumping stations, not less than the 5 min discharge volume of the largest pump, and when automatically controlled, the number of starts per hour should not exceed 6; for stormwater pumping stations 30 s; for underpass stormwater pumping stations 60 s)
- GB 50014—2021 Article 7.6.6 Mixing power for anoxic tank/anaerobic tank 2~8 W/m³ (the clause explanation states this is installed power). Section 9 of this paper discusses this as a "borrowed clause" and it is not used for equalization tank design
- Ministry of Environmental Protection. HJ 2003—2010 Technical Specification for Wastewater Treatment Engineering of Leather and Fur Processing. Beijing: China Environmental Science Press, 2010. (Article 6.3.4.3 a) graphical method and equalization time greater than 20 h/16 h; b) when also serving as an emergency tank, sized according to 2 h maximum hourly discharge; c) initial rainwater 10~15 min; d) submersible propellers 2~8 W/m³, aeration should not be less than 3 m³/(m²·h); e) sump and slope not less than 0.01; f) level control and alarm)
- HJ 2003—2010 Article 12.5.3 "An emergency storage tank for chromium-containing wastewater shall be constructed" (a segregated emergency storage tank, separate from the combined wastewater equalization tank)
- Ministry of Environmental Protection. HJ 2004—2010 Technical Specification for Wastewater Treatment Engineering of Slaughter and Meat Processing. Beijing: China Environmental Science Press, 2010. (Article 6.3.1.4 The effective volume of the collection tank shall not be less than the 5 min discharge volume of the largest working pump, the lifting pumps shall be selected according to the maximum hourly flow, and in the absence of a curve, 3~4 times the average flow, with no more than 6 starts per hour; Article 6.3.1.5 Equalization tank 10~24 h, submerged mixing 5~10 W/m³, air mixing 0.6~0.9 Nm³/(h·m³), should be covered for odor removal, slope not less than 2%)
- Technical Specification for Wastewater Treatment Engineering of Sugar Production (Draft for Comments) Article 6.3.3. (In the absence of data, based on 4~8 h of the maximum daily average hourly flow; when SS is greater than 500 mg/L, provide mixing, submersible propellers 15~30 W/m³, aeration should not be less than 3 m³/(m²·h); slope not less than 0.005; overflow pipe should lead to the emergency tank; where conditions permit, it may be divided into two compartments)
- Technical Specification for Wastewater Treatment Engineering of Phosphate Fertilizer Industry (Draft for Comments) Article 6.4.2. (Effective volume based on 8~12 h of the average hourly flow, effective water depth 4~6 m; mechanical mixing 4~8 W/m³ or perforated pipe aeration 3~6 m³/(m²·h); slope not less than 0.01; pH adjustment and level alarm should be provided)
- Technical Specification for Wastewater Treatment Engineering of Chlor-Alkali Industry (Draft for Comments) Article 6.4.1.4. (Effective volume of the inorganic wastewater equalization tank based on 12~24 h of the average hourly flow, effective water depth 4~6 m; mechanical mixing 4~8 W/m³ or aeration 3~6 m³/(m²·h); slope not less than 0.01; overflow pipe should be provided on the tank wall)
- Department of Ecology and Environment of Hunan Province. Interim Provisions on Standardized Construction of Wastewater Collection and Treatment in Chemical Industrial Parks of Hunan Province. Article 31. (An equalization tank or homogenization tank shall be provided at the front end of segregated pretreatment; the hydraulic retention time should preferably be 8~24 h, or determined according to the park scale and process characteristics; mixing or aeration shall be provided in the tank, and oil collection and sludge discharge facilities may be provided)
- Calculation example of the cumulative curve method for equalization tank volume (public technical material). (Maximum positive deviation of the influent cumulative line from the effluent cumulative line 237.3 m³, maximum negative deviation 53.76 m³, sum 291.06 m³; corresponding average retention time 4.52 h, back-calculated average flow 64.39 m³/h; empirical mechanical mixing intensity 4~8 W/m³, aeration mixing 1~3 m³/(m²·h))
- Equalization tank configuration and effluent methods (compilation of public technical materials). (Weir-crest overflow effluent can only equalize water quality, not water quantity; operating principles of the diagonal effluent trough type and the concentric circular baffle type; volume estimation formula V = (Q/T − K·Q/24)·T, where K is the flow equalization ratio; water quality equalization duration is usually considered as 4~8 h)
- Industrial Technology Research Institute (Taiwan). Case study of large-scale knitted fabric dyeing and finishing wastewater treatment. (Daily discharge 8000~10000 m³; raw wastewater COD average 350 mg/L, BOD 80 mg/L, pH greater than 10; homogenization tank retention 4 h, water quality variation COD 250~650 mg/L, judged to be the cause of poor coagulation performance; PAC dosage 700 mg/L; improvement scheme increased the homogenization tank retention time to 8 h and added contact aeration, reducing PAC to 200~100 mg/L)
- Case study of maleic anhydride wastewater treatment project of a new material enterprise (enterprise public information). (480 m³/d; COD 8000~12000 mg/L, pH 2.0~3.5, B/C 0.20~0.25, salinity 5000~8000 mg/L, daily variation coefficient 1.3~1.5; effective volume of the equalization/homogenization tank 800 m³, retention 40 h, equipped with pH/ORP/online COD and automatic mixing; followed by iron-carbon micro-electrolysis + neutralization coagulation + UASB + contact oxidation)
- Case study of maleic anhydride water-washing wastewater treatment project of an energy enterprise (enterprise public information). (200 m³/d; COD 6000~9000 mg/L, pH 2.5~4.0, B/C 0.22~0.28; effective volume of the equalization tank 400 m³, retention 48 h, equipped with mixing and online pH/COD; followed by neutralization + coagulation air flotation + UASB + contact oxidation)
- Treatment of dyeing and washing wastewater by coagulation sedimentation—A/O contact oxidation process (public engineering case). (A washing garment factory in Shanghai 600 m³/d; effective volume of the equalization tank 200 m³, retention 8 h, micro-aeration; B/C less than 0.3; followed by inclined tube sedimentation 2 h, anoxic tank 6 h, aerobic tank 12 h)
- Silk reeling wastewater treatment technology (public engineering case). (Total 580 m³/d, calculated as 25 m³/h; equalization tank 10.0 m × 5.0 m × 4.0 m, freeboard 1.0 m, effective volume 150 m³, retention 6 h; tank bottom i=0.01 sloping toward the sump, equipped with 2 submersible sewage pumps, one duty and one standby; average influent COD of the cocoon cooking wastewater 11200 mg/L, UASB effluent mixed with silk reeling, cocoon cooking and domestic sewage in the equalization tank before entering the SBR)
- Calculation of mixing tank retention time in process control (technical material). (Step response of a completely mixed tank C(t) = C₀ + (Cin − C₀)(1 − e^(−t/τ)); 0.5τ reaches 39.3%, 1τ reaches 63.2%, 2τ reaches 86.5%, 3τ reaches 95.0%, 5τ reaches 99.3%; when the effective volume varies with liquid level, τ varies proportionally)
- Article 2026-10-11 of this series, "Emergency Wastewater Storage Tank: Of the Six Quantities in the Volume Formula, Only Two Can Be Changed by Design". (Composition of the emergency tank volume and the constraint that "emergency water does not enter biological treatment"; Section 11 of this paper connects with it)
- Article 2026-11-07 of this series, "Mixing and Propulsion: 2 W/m³ Is on the Nameplate, but the G Value Recognizes What Is in the Water". (Conversion chain between installed power and hydraulic power; the ρ·g·q conversion in Section 2 of this paper shares the same origin as G = √(P/μV) in that article)
Note: All standard clauses and engineering data in this paper are taken from the above public sources, and the source and clause number are indicated item by item in the text; Tables 3 to 7, as well as the calculations in Sections 8 and 12, are calculated point by point according to the formulas given in the text and can be recalculated. Among them, three tables in Table 1 are drafts for comments (sugar production, phosphate fertilizer, chlor-alkali), and their status has been indicated in the table; please note this when citing. All "residual fluctuations" in the text are upper-limit values estimated according to a first-order completely mixed model, not measured values: the model assumes constant tank volume, constant outflow, complete mixing in the tank, and no reaction consumption; actual tanks, due to short-circuiting and dead zones, have lower reduction rates than the calculated values. The three figures are numerical relationship diagrams drawn locally according to the same set of formulas, not site photographs, and can be checked point by point against the table values. The water types, scales, and subsequent processes of the engineering cases differ, so the retention times in Table 8 should not be directly compared horizontally; they are only used to illustrate the relationship between the selected values and the objectives.
Across multiple industries nationwide (leather and fur processing, slaughtering
Pilot to full-scale engineering (tens to tens of thousands of m³/d; effective vo