Injection Water Quality: Permeability Scales by 150 Times While Median Particle Size Scales by Only 5 Times, So High-Permeability Formations Are Actually Held to Stricter Standards
The previous article discussed circuit boards, where what was replaced was the denominator. This article discusses oilfield produced water, where what is replaced is the entire table—the same stream of water, one table governs whether it plugs, another table governs whether it is dirty; each table is missing an entire category of indicators, and the missing category is precisely what they truly govern.
I. First, positioning: one table governs "plugging," one table governs "dirtiness"
The term oilfield produced water has two identities in the standard system. HJ 2041—2014 Article 3.1 defines it as "water containing crude oil generated during oilfield extraction, which after purification treatment can be reinjected into the oil layer for use as a displacement agent, and is one of the water sources for water injection"; Article 3.3 separately provides "oil extraction wastewater"—"wastewater requiring discharge other than production water used for reinjection, process blending, or other purposes." The same stream of water, when injected back into the formation is called produced water, when discharged to the surface is called oil extraction wastewater. Different names carry different applicable standards.
Moreover, "injecting it back" is not something enterprises can choose freely. Article 26 of Shaanxi Province's "Regulations on Ecological Environmental Protection for Coal, Petroleum, and Natural Gas Development" states plainly: "Petroleum produced water shall be reinjected into the same layer and shall not be discharged." Same-layer reinjection—injected back into the original layer, not across layers. This single sentence locks down everything that follows: the permeability tier is not chosen by the design institute, it is given by geology; you do not have the option of "switching to a wider tier."
This explains why injection water quality standards are divided into five tiers by permeability, while standards in other industries rarely do so. Municipal wastewater discharge standards are also graded by the function of the receiving water body, but that grading does not change "how large a particle can be"; injection water standards must be tiered by permeability because the formation genuinely selects particle size—however large the pore throat is, it only accepts particles of that size; even one micrometer more cannot enter.
| Parameter | Reinjection basis SY/T 5329—2012 Table 1 (limits) | Discharge basis HJ 2041—2014 Table 1 (design reference range) | Relationship between the two tables |
|---|---|---|---|
| Suspended Solids / SS | 1.0 ~ 30 mg/L (five tiers) | 10 ~ 150 mg/L | 150 times difference (1.0 vs. 150) |
| Oil content / Petroleum hydrocarbons | 5 ~ 50 mg/L (not tested for clean water) | 20 ~ 200 mg/L | 40 times difference (5 vs. 200) |
| Median particle size | 1.0 ~ 5.0 μm | Not specified | The discharge table does not include this item |
| Average corrosion rate | ≤0.076 mm/a (same value for all tiers) | Not specified | The discharge table does not include this item |
| SRB / IB / TGB | 10 ~ 25 cells/mL; n×10²~n×10⁴ cells/mL | Not specified | The discharge table does not include these three items |
| Dissolved Oxygen / DO | Clean water ≤0.50, produced water ≤0.10 mg/L | Not specified | The discharge table does not include this item |
| Hydrogen sulfide | ≤2.0 mg/L | Not specified | The discharge table does not include this item |
| Compatibility | Good (core damage rate ≤30%) | Not specified | The discharge table does not include this item |
| pH | Not specified | 6.5 ~ 8.5 | The reinjection table does not include this item |
| CODCr | Not specified | 100 ~ 800 mg/L | The reinjection table does not include this item |
| BOD5 | Not specified | 50 ~ 150 mg/L | The reinjection table does not include this item |
| Ammonia nitrogen | Not specified | 6 ~ 80 mg/L | The reinjection table does not include this item |
| Polymer | Not specified | 0 ~ 200 mg/L | The reinjection table does not include this item |
II. The items missing from each of the two tables are exactly what they truly govern
The most interesting part of Table 1 is not the overlapping rows, but the non-overlapping rows.
The reinjection table has no pH, no COD, no BOD5, and no ammonia nitrogen. In other industry standards, these items almost inevitably appear in the first row—especially pH, which is the first item in almost all discharge standards. Yet the injection water standard gives no pH limit from beginning to end, and only regulates "aggressive carbon dioxide −1.0~1.0 mg/L" among auxiliary indicators, because the formation does not care whether the water is acidic or alkaline, only whether what comes in will grow in the pore throats. This connects exactly with the article on neutralization: that article said pH is intensity, not capacity; this article says pH does not exist at all in the reinjection table.
Conversely, the discharge table has no median particle size, no corrosion rate, no SRB, no dissolved oxygen, no hydrogen sulfide, and no compatibility. Because the river does not care whether your particles are 1 microns or 5 microns, nor whether your oil pipe will leak next year.
III. Five tiers: six rows change with permeability, one row does not move at all
Copying SY/T 5329—2012 Table 1 verbatim reveals that the structure of this table is more complex than imagined: among the seven rows of control indicators, six rows change with permeability, and only the average corrosion rate row has the same value across all five tiers.
| Average Air Permeability of Injection Layer (μm²) | ≤0.01 | >0.01~≤0.05 | >0.05~≤0.5 | >0.5~≤1.5 | >1.5 |
|---|---|---|---|---|---|
| Suspended Solids Content (mg/L) | 1.0 | 2.0 | 5.0 | 10.0 | 30.0 |
| Median Suspended Solids Particle Diameter (μm) | 1.0 | 1.5 | 3.0 | 4.0 | 5.0 |
| Oil Content (mg/L) | 5.0 | 6.0 | 15.0 | 30.0 | 50.0 |
| Average Corrosion Rate (mm/a) | ≤0.076 | ||||
| SRB (cells/mL) | 10 | 10 | 25 | 25 | 25 |
| IB (cells/mL) | n×10² | n×10² | n×10³ | n×10⁴ | n×10⁴ |
| TGB (cells/mL) | n×10² | n×10² | n×10³ | n×10⁴ | n×10⁴ |
| Auxiliary Control Indicators: Dissolved Oxygen ≤0.50 for clean water, ≤0.10 mg/L for sewage or oil-bearing produced water; Hydrogen Sulfide ≤2.0 mg/L; Aggressive Carbon Dioxide −1.0≤ρCO₂≤1.0 mg/L; Sulfide ≤2.0 mg/L; Compatibility good (core damage rate ≤30%). Note 1: 1≤n≤10.Note 2: For clean water quality indicators, oil content is excluded.Note 3 (original note): When ferrous iron is present in water, iron bacteria can convert ferrous iron to ferric iron, forming ferric hydroxide precipitate; when sulfide (S²⁻) is present in water, FeS precipitate can form, increasing suspended solids in the water. | |||||
First look at the row "n×10²". It looks like a single number, but it is actually an interval: Note 1 gives 1≤n≤10, so the IB limits for the two strictest tiers are actually 100~1000 cells/mL, and for the two loosest tiers are 10 000~100 000 cells/mL. More importantly, the middle tier n×10³ is 1 000~10 000—its upper bound exactly equals the lower bound of the next tier, and its lower bound exactly equals the upper bound of the previous tier.
3.1 One limit interval connects end-to-end with the next tier
This means: when preparing construction drawings, whether n is taken as 1 or 10, the result for the same tier differs by a factor of 10; and if the client takes 10 and the contractor takes 1, two people using the same standard can reach completely opposite conclusions for the same water stream, and both are correct. This is not a case of the standard being written loosely; it is the standard handing over part of the discretionary power—and the part handed over is "who determines n".
IV. Permeability amplified 150 times, particle size amplified only 5 times
Now calculate the scaling factor for each of the six rows of changing indicators. The so-called scaling factor is the widest tier divided by the strictest tier.
| Indicator | Strictest tier (≤0.01) | Loosest tier (>1.5) | Scaling Factor | Notes |
|---|---|---|---|---|
| Injection-layer permeability (μm²) | 0.01 | 1.5 (no upper bound for this tier) | 150 | Independent variable |
| Suspended Solids content (mg/L) | 1.0 | 30.0 | 30 | Should be 12.2 times by the square-root relationship |
| Oil content (mg/L) | 5.0 | 50.0 | 10 | Tighter than SS |
| Median particle size (μm) | 1.0 | 5.0 | 5 | The tightest row |
| SRB (cells/mL) | 10 | 25 | 2.5 | Barely moves with permeability |
| IB / TGB (cells/mL) | n×10² | n×10⁴ | 100 (for the same n) | Jumps by whole tiers, 10 times at a time |
| Average corrosion rate (mm/a) | 0.076 | 0.076 | 1 | Does not move at all |
If all three rows were governed by the same mechanism, they should relax by the same ratio—permeability by 150 times, and each of the three rows by 150 times. In reality they are 30, 10, and 5.The difference in scaling rates is the fingerprint of the mechanism.
Why is the oil content limit tighter than that for suspended solids? Because oil droplets are deformable. A 20 micron oil droplet entering a differential pressure field will be elongated and squeezed through pore throats smaller than itself; a 20 micron quartz particle will not — once it is stuck, it stays stuck. That is why the margin the standard allows for oil is naturally wider than for solids — the strictest tier 5.0 is 5 times that for 1.0, and the middle three tiers are 3 times. But this margin is being tightened: the widest tier 50 versus 30 leaves only 1.67 times. The reasoning follows: as pore throats grow larger, oil droplets more easily penetrate deep into the formation instead of being intercepted at the face; once deep, they coalesce and become difficult to treat, so the margin must be narrowed.
Why is the median particle size the tightest, relaxed by only 5 times? Because it is the only row determined by geometry. The relationship between pore throat diameter and permeability is a square-root relationship (calculated in the next section): when permeability increases 150 times, the pore throat increases only 12.2 times; if the limit were also raised 12.2 times, the ratio would remain constant — and this row would degenerate into a permeability conversion table that need not be listed separately. It rises only 5 times, showing that the standard has proactively tightened this row.
4.1 mass increases 30 times, yet particle count drops to a quarter
The suspended solids row gives a mass concentration, but what plugs pores is the number of particles. The gap between the same number under two different rulers can be calculated directly: assuming spherical particles with a density of 2.6 g/cm³, 1 μm particles of 1.0 mg/L correspond to 7.35×10⁵ particles/mL; while 5 μm particles of 30 mg/L amount to only 1.76×10⁵ particles/mL.
Mass increased 30 times, yet the count dropped to a quarter — because the mass of a single particle increased 125 times (the cube of 5). This give-and-take precisely explains why "suspended solids content" and "median particle size" must be written side by side in the same table: content governs how much mud is carried, while the median governs how coarse the mud is; giving only the content is like giving only the total weight without knowing how many particles there are.
One more step makes it clear: the particle count stays almost unchanged while the volume of a single particle grows 125 times, meaning what the wide tier lets in is not "more mud" but "mud that plugs more readily." This and the pore-throat ratio to be calculated in Section 5 are two sides of the same coin — one viewed from the particles, the other from the pore throats.
V. Dividing the limits by the pore throat: absolute values are loosening, relative values are tightening
Nobody on the mine site measures "how large the pore throat is" directly, but it can be back-calculated from permeability. Using the most common capillary bundle model:
K = φ·r² ÷ (8τ²) → d = 2√(8Kτ² ÷ φ)
Where K is permeability (m²), φ is porosity, τ is tortuosity, and d is the equivalent pore throat diameter. Taking φ=0.20 and τ²=2 (common values for sandstone) and selecting one representative permeability for each of the five tiers, the calculated pore throat diameters are as follows.
| Permeability range (μm²) | Representative K (μm²) | Pore throat diameter d (μm) | Median particle size limit (μm) | Limit ÷ pore throat |
|---|---|---|---|---|
| ≤0.01 | 0.01 | 1.79 | 1.0 | 0.56 |
| >0.01~≤0.05 | 0.05 | 4.00 | 1.5 | 0.375 |
| >0.05~≤0.5 | 0.5 | 12.65 | 3.0 | 0.237 |
| >0.5~≤1.5 | 1.5 | 21.91 | 4.0 | 0.183 |
| >1.5 | 3.0 | 30.98 | 5.0 | 0.161 |
This result is worth pausing over.From the strictest range to the widest range, the limit is enlarged 5 times and the pore throat is enlarged 17.3 times (the last range has no upper bound, so the representative value is taken as 3.0 μm², equivalent to 300 times the strictest range), so the ratio drops from 0.56 to 0.16, a decrease of 3.5 times.In other words: the standard reads as if it is being relaxed range by range, but in reality it is being tightened range by range. The widest range allows you to carry 30 mg/L of suspended solids, but only allows the median of these particles to occupy 16% of the pore throat—whereas the strictest range actually allows up to 56%.
Let's verify with another set of parameters to see whether the conclusion holds. If we take φ=0.15, τ²=2.5 (denser, more tortuous sandstone), and the pore throats are enlarged overall by a factor of 1.29, the ratios become 0.433 / 0.290 / 0.184 / 0.142 / 0.125—the starting point has changed, but the monotonically decreasing trend has not. The conclusion is insensitive to the values of φ and τ, which is important because φ and τ are inherently difficult to estimate in the field.
5.1 Why high-permeability zones are actually stricter
This makes physical sense. The pore throats in low-permeability zones are only a little over 1 microns, so particles cannot enter at all and simply pile up on the wellbore wall to form a filter cake—this cake raises injection pressure, but it blocks the particles, and it is removed as soon as acidizing is applied. The pore throats in high-permeability zones are 20–30 microns, so particles can enter and only bridge at some point several meters or even tens of meters away where a pore throat narrows. The near-wellbore zone can be acidized; deep bridging cannot be reached by acidizing. Therefore, the standard must push the "relative size" even lower for the wide range. This is not conservatism; it is an acknowledgment that "can enter" is harder to deal with than "cannot enter."
VI. The median is not the tail: damage lies in the tail of the distribution
All the calculations above used the "median particle size." But what actually plugs wells in the field is often not the half of particles at the median.
The standard governs d50—half the particles are finer than it and half are coarser. And compliance with d50 does not restrict at all how many particles are coarser than it. The same batch of water can be a narrow distribution with "d50=3 μm, coarsest 6 μm" or a wide distribution with "d50=3 μm, coarsest 30 μm"; both are identical before the standard.
The article in 2021 年 Applied Chemical Industry on the plugging mechanism of reinjection wastewater in offshore oilfields states this very clearly: "When the particle size is smaller than and closer to 1/3 of the pore throat diameter, the degree of damage to the core is higher"—it is not that smaller is better, nor that larger is worse, but rather that the range close to 1/3 of the pore throat is the worst: large enough to enter, and large enough to bridge at the pore throat entrance. The same article also gives a boundary on the content side: when Suspended Solids is 80 mg/L, the core permeability damage rate exceeds 50%.
The article in 2014 年 Journal of Southwest Petroleum University directly switched to a different measure: using a damage rate of 30% as the threshold, it concluded that when core permeability is less than 10 mD, the injected water particle D90 should be less than 1.00 μm; when greater than 10 mD, it can be relaxed to 5.00 μm. Note that D90 is used here, not the median.
| Permeability range (μm²) | d50 limit (μm) | Estimated D90 (μm) | D90 ÷ pore throat | Where particles can enter |
|---|---|---|---|---|
| ≤0.01 | 1.0 | 2.43 | 1.36 | Cannot enter; cake forms on the face |
| >0.01~≤0.05 | 1.5 | 3.65 | 0.91 | Barely enters; bridging plugging in the near-wellbore zone |
| >0.05~≤0.5 | 3.0 | 7.29 | 0.58 | Can enter; middle-to-near wellbore zone |
| >0.5~≤1.5 | 4.0 | 9.72 | 0.44 | Can enter; deeper |
| >1.5 | 5.0 | 12.15 | 0.39 | Can enter and will bridge |
The conversion relationship is D90 ÷ d50 = exp(1.2816 × ln σg). When σg=2, it is 2.43 times; when σg=3, it is 4.09 times. In other words, for water whose median value has just been pressed down to the limit, D90 is already 2.4 to 4.1 times the limit.
Read the last column of Table 5 horizontally: from the strictest tier to the loosest tier, D90 ÷ pore throat drops from 1.36 to 0.39.The coarse particles in the strictest tier cannot enter the pore throat at all (1.36 times the pore throat), and can only pile up on the wellbore wall; the coarse particles in the loosest tier are 0.39 times the pore throat, falling exactly in the range of "can enter, and will bridge."This is the arithmetic version of "the looser the tier, the deeper the plugging."
Seven, 0.076 mm/a is 3 mpy: what it governs is not the formation, but the tubing
The only row in Table 2 that does not change with permeability is the average corrosion rate, with the same value of 0.076 mm/a across all five tiers. This number is not calculated; it is converted: 3 mpy (mils per year) × 0.0254 = 0.0762 mm/a, rounded and written as 0.076.It is a round number in imperial units, 3, not a round number in metric units.
Recognizing this is useful. First, it shows that the source of this row is not corrosion statistics from Chinese oilfields, but the "3 mpy acceptable" convention that has been used in the API/NACE system for more than half a century; second, it shows that what this row measures is not the formation at all—the formation does not corrode; what corrodes is the tubing, casing, and water injection lines.Therefore it should not be tiered by permeability; it follows material and wall thickness.
It becomes clearer with a calculation. For tubing with a wall thickness of 8 mm, under uniform thinning at 0.076 mm/a, the service life is 105 年; at 10 times the pitting rate, 10.5 年; at 20 times, 5.3 年.And what SRB causes is almost never uniform corrosion; it is pitting.If the water injection string in an oilfield truly underwent uniform corrosion, the figure of 0.076 could be used with confidence forever; what actually happens is that pits several hundred micrometers deep appear on the pipe wall, while the average wall thickness barely changes.
Eight, the oxygen in 0.10 mg/L can create 1.34 mg/L of iron sludge
One arrangement among the auxiliary indicators is very counterintuitive: the limit for dissolved oxygen is 0.50 mg/L for clean water, and 0.10 mg/L for sewage or oil-bearing produced water. The dirtier the water, the stricter the oxygen requirement, by a factor of 5.
Why? Because in clean water there is nothing that can be oxidized by oxygen; oxygen is only a slight corrosion driving force. But in produced water, three things are waiting for it: Fe²⁺, S²⁻, and a group of bacteria that live on oxygen. The most troublesome of the three is Fe²⁺, because its product is a solid.
4Fe²⁺ + O₂ + 10H₂O → 4Fe(OH)₃↓ + 8H⁺
Balancing according to this equation: 1 g O₂ oxidizes 7.0 g Fe²⁺ (4×56÷32), producing 13.4 g Fe(OH)₃ (4×107÷32). Therefore:
- Oxygen leaking into 0.10 mg/L, if the water contains more than 0.70 mg/L of Fe²⁺, can generate 1.34 mg/L of ferric hydroxide—exactly 134% of the total suspended solids quota (1.0 mg/L) for the ultra-low permeability category;
- If calculated at 0.50 mg/L for the clean water category, it can generate 6.7 mg/L, which is 6.7 times the quota;
- The same oxygen can also oxidize hydrogen sulfide: H₂S + ½O₂ → S↓ + H₂O, 1 g O₂ oxidizes 2.125 g H₂S, and the product elemental sulfur is also a solid.
This turns the matter of "the water injection system must be sealed and oxygen-excluded" from a rule of thumb into an arithmetic problem: you don't need to leak much oxygen—just enough to reach the limit, and the suspended solids item is already consumed. And the locations where oxygen leaks in the field are always the same few—the breather of the buffer tank, the open top of the chemical dosing tank, the mechanical seal of the pump, the sampling port, and pipe sections that were not properly purged after maintenance.
The original note 3 of Table 2 actually spells this out itself: "When ferrous iron is present in water, iron bacteria can convert ferrous iron to ferric iron and generate ferric hydroxide precipitate; when sulfide (S²⁻) is present in water, FeS precipitate can be generated, increasing the suspended solids in water." The standard gives you the suspended solids limit, and then in the note tells you that this limit will be breached by iron and sulfur themselves—this is not a contradiction, but a reminder: half of the suspended solids item is not the filter's business, it's the business of oxygen exclusion and sulfur removal.
IX. 2.0 mg/L of H₂S allows only 5.65 mg/L of sulfate to be reduced
Among the auxiliary indicators in Table 2, the hydrogen sulfide limit is 2.0 mg/L. This number doesn't look tight, but converting it into "how much sulfate has been reduced" tells a completely different story.
The stoichiometric relationship of sulfate reduction is: SO₄²⁻ (96) → H₂S (34), so complete reduction of 1 mg/L of SO₄²⁻ produces 0.354 mg/L of H₂S. Solving in reverse:
2.0 ÷ 0.354 = 5.65 mg/L
That is to say, only 5.65 mg/L of sulfate in this stream is allowed to be reduced; beyond this amount, hydrogen sulfide exceeds the limit. Yet sulfate in produced water is often in the range of tens to hundreds of milligrams per liter, and can reach over two thousand when seawater is injected—the potential generation is tens to hundreds of times the limit. So "H₂S meeting the standard" has never relied on "less reduction," but on "the reduction products being carried away" or "reduction never starting at all."
Now put the two documents side by side. Clause 6.3.2.2 of HJ 2041—2014 specifies the influent requirements for anaerobic biological treatment: pH 6.5~7.5, petroleum hydrocarbons preferably less than 20 mg/L, and sulfate concentration should be less than 1 000 mg/L. According to the stoichiometry above, if 1 000 mg/L of sulfate is completely reduced, it produces 354 mg/L of H₂S—177 times the limit of SY/T 5329.
X. The damage rate of 30% is the injection pressure of +43%
The compatibility column says "Good (core damage rate ≤30%)". This is the only indicator in the entire table that cannot be expressed as a concentration and can only be determined by conducting a core flow test, and the only indicator that defines "how much counts as good" as "a damage of 30% is acceptable".
30% sounds fine. But the damage rate is a discount on permeability, and injection pressure is its reciprocal:
Injection pressure multiplier = 1 ÷ (1 − damage rate)
| Damage Rate | Remaining Permeability | Injection Pressure Multiple | Power Consumption per Ton of Water (kWh/m³) | Annual Incremental Electricity Cost (10,000 CNY) |
|---|---|---|---|---|
| 30% (Upper limit allowed by the standard) | 0.70 | 1.43 | 6.94 → 9.92 | +22.8 |
| 35.2% (Measured at Bohai L Oilfield) | 0.648 | 1.54 | 6.94 → 10.72 | +28.9 |
| 43.8% (Measured at Bohai L Oilfield) | 0.562 | 1.78 | 6.94 → 12.36 | +41.5 |
| 50% (Measured at Suspended Solids 80 mg/L) | 0.50 | 2.00 | 6.94 → 13.89 | +53.2 |
Baseline calculation: 20 MPa × 1 m³ ÷ 0.8 = 25 MJ = 6.94 kWh/m³. This set of figures only covers electricity costs, excluding the geological reserves lost due to under-injection, the operation costs of acidizing and plug removal, and the investment in injection booster pumps.
XI. Process: Stages Are Not Precision
Table 2 of HJ 2041—2014 gives the pollutant removal efficiency of each treatment unit. By stringing the three physical stages together and multiplying them through, one can see where the ceiling of the physical method lies.
| Series Combination | Cumulative SS Removal Rate | Effluent at Influent 150 mg/L | Gap to Recharge Water Standard 1.0 mg/L |
|---|---|---|---|
| Natural Sedimentation 20 → Coagulation Air Flotation 40 → Filtration 50 (Most Unfavorable) | 76.0% | 36.0 mg/L | 36 times |
| Sedimentation 30 → Air Flotation 60 → Filtration 55 (Median) | 87.4% | 18.9 mg/L | 18.9 times |
| Sedimentation 40 → Air Flotation 80 → Filtration 60 (Most Favorable) | 95.2% | 7.2 mg/L | 7.2 times |
Even with the most favorable combination, the three-stage physical process can only reduce 150 to 7.2, still 7 times short of 1.0. This is not a matter of poor equipment selection, but an inherent defect of the "relative removal rate" indicator at the low-concentration end: at a removal rate of 50%, the concentration can only be reduced to 5 when the influent is 10 mg/L, and to 75 when the influent is 150. The lower the concentration, the less effective the same percentage becomes.
Therefore, at the final stage of the recharge water line, equipment based on "absolute precision" must be adopted. The following set of measured comparisons makes this point very clear.
| Route | Influent | Effluent | Assessment Against Target Grade |
|---|---|---|---|
| Walnut shell + quartz sand two-stage (Daqing, original process) | Oil content 30, SS 27 mg/L | Removal rate only 50%, calculated effluent oil content 15, SS 13.5 | For the 0.05~0.5 grade (15/5/3), Suspended Solids exceed by 2.7 times |
| Modified fiber ball single-stage (Daqing) | Oil content 30, SS 27 mg/L | Oil content 8, SS 3, median particle size ≤2.0 μm, removal rate 90% | This grade meets the standard; backwash cycle 72 h |
| Al₂O₃ ceramic membrane (Daqing Xing Shiwu-1 Station) | Walnut shell first-stage effluent | Oil content qualification rate 100%, SS qualification rate 100%, median particle size qualification rate 92% | Meets "5, 1, 1"; the only item not fully scored is particle size |
| Offshore six-stage series (hydrocyclone—coalescence—air flotation—fiber ball—modified fiber ball—ultrasound) | Oil content 31.18, median particle size 4.40 μm | Still does not meet ODP's 8.0 / 2.0 | Oil content exceeds by 3.9 times, particle size exceeds by 2.2 times |
| Ceramic membrane (same offshore oilfield) | Oil content 31.18, median particle size 4.40 μm | Oil content 3.6, median particle size 1.42 μm | Meets the standard |
Three things in this table are worth highlighting separately.
First, stringing together six stages of equipment is still not enough. Hydrocyclone, plate coalescer, air flotation, fiber ball, modified fiber ball, ultrasonic fine filter—six pieces of equipment, stacked up according to the logic of "if one doesn't work, add another," and the oil content in the effluent is still 3.9 times the ODP requirement. The reason is not complicated: all six machines are doing the same thing (making oil droplets bigger and then floating them up), only with increasing efficiency; not one of them changes the mechanism. The ceramic membrane changes the mechanism—it does not rely on density difference, but on absolute pore size, so a single unit presses 31.18 down to 3.6.
Second, the three pass rates from the Daqing set—100%, 100%, 92%—are the best piece of evidence in the entire article. With the same ceramic membrane, both the oil content and suspended solids items achieved full marks, yet the median particle size alone was only 92%. Why? Because oil content and suspended solids content are total quantity indicators, which can be reduced simply by "retaining more"; the median particle size is a distribution indicator, determined by the absolute pore size of the filter material, not by chemical dosage or residence time. Adding another stage of filtration can press the content down, but what cannot be pressed down is "when there is still 8%, the largest particles exceed the pore size." A single indicator's pass rate falling behind on its own shows that it is not controlled by the same piece of equipment or the same knob.
Third, the three numbers "5, 1, 1" are exactly the first column of Table 1. Oil content 5, suspended solids 1, particle size 1—the customary Daqing way of saying it, in the order "oil, solids, size," whereas the row order of Table 1 is "solids, size, oil." The same thing said two ways; quite a few have gotten the order reversed when copying it into a technical proposal.
Twelve, Fracturing Flowback Fluid: Three Gates Differ by 10 Times
Fracturing flowback fluid is another branch besides produced water; its destination is not reinjection into the formation for oil displacement, but preparing new fracturing fluid. The water quality requirements for this route follow an entirely different logic from Table 1.
First, the volume. For conventional guar gum systems, the flowback rate is often 30%~70%. A publicly reported field case: Yan 0XX-D02 gas well in the Ordos Basin, fracturing fluid volume 370.5 m³, sand volume 37.8 m³, flowback rate 41%. That is, 152 m³ flowed back to the surface, and the remaining 218 m³ stayed in the formation. The denominator of "flowback rate" is the total fluid volume injected into the well, not the total flowback fluid volume—when someone says "the flowback fluid volume is very large," first ask what the base number is.
Next, water quality. The key harmful items in flowback fluid are not COD, but several specific ions: Ca²⁺, Mg²⁺, Fe, and borate. Because they directly determine whether crosslinking can occur and, once formed, how long it can hold.
| Source / System | Ca²⁺ | Mg²⁺ | Boron | Mineralization | Other |
|---|---|---|---|---|---|
| Ordos Basin, Instantized Guar Gum (ISG) | <60 | <120 | BO₃³⁻ <5 | <30 000 | Fe <8, Peroxide <10 |
| Plant Gum + Borax Crosslinking (General) | ≤100 | — | Borate ≤5 | — | Total Iron ≤10, Al ≤10 |
| Plant Gum + Organic Boron Crosslinking (General) | ≤500 | — | Borate ≤5 | — | Total Iron ≤15 |
| Linxing Block Tight Sandstone Gas | <600 | <900 | <10 | <60 000 | pH 7~10 |
All units are mg/L (same for mineralization). Among the four sources, the calcium limit ranges from 60 to 600, a difference of 10 times; mineralization ranges from 30 000 to 60 000, a difference of 2 times; boron ranges from 5 to 10, a difference of 2 times.
The difference is not in the water, but in the crosslinker. Borax crosslinking relies on free borate ions bonding with the cis-hydroxyl groups of guar gum. Calcium already present in the water will preferentially bind with the colloid and also compete with borate ions, so calcium is capped at 100; organic boron crosslinkers encapsulate boron within organic ligands for delayed release, directly raising calcium tolerance to 500. Boron itself works in reverse—when residual boron in flowback fluid is excessive, preparing new fluid causes "over-crosslinking," making the gel brittle and reducing proppant-carrying capacity, so the upper limit for boron is tight on both sides, 5~10.
XIII. The Three Most Common Misjudgments
Misjudgment One: If suspended solids meet the standard, the water is clean. In Table 1, suspended solids and median particle size are two rows, not one. Both labeled "SS ≤5," one stream is fine mud with d50=1 μm, the other is coarse sand with d50=5 μm—identical before the suspended solids row, but differing by 5 times before the pore throat. What really determines whether plugging occurs is the latter—calculated per Section VI, for the stream with d50 5 μm, D90 has already reached 12 μm. So the field complaint "our SS has always been qualified, why are we still under-injecting" often finds its answer between these two rows.
Misjudgment Two: If the median particle size meets the standard, there will be no plugging. Section VI calculated that for water with median exactly at the limit, D90 is 2.4 times the limit (σg=2) to 4.1 times (σg=3). And the paper on plugging mechanisms by 2021 年 states clearly: the most damaging are not the coarsest particles (they cannot enter, form a cake on the face, and can be removed by acidizing), but those approaching 1/3 of the pore throat—they can enter and bridge exactly at the pore throat entrance. A qualified median has no necessary relationship with whether this batch of particles is present.
Misjudgment Three: If there are enough stages, 1.0 can be reached. The three field measurements in Section XI already tell the whole story: walnut shell plus quartz sand two-stage, removal rate 50%; modified fiber ball single-stage, 90%; six-stage series, oil content still 3.9 times the requirement. Adding stages increases "the number of repetitions of the same mechanism," not "precision." To reach the 1.0 magnitude, you must switch to absolute pore-size equipment (membranes, fine filter cartridges), or simply change the mechanism (air flotation to coalescence, gravity settling to centrifugation). "Add one more stage"—these four words are the most expensive four words on the reinjection line.
These three misjudgments share one commonality: they all use "one number" to judge "one thing," when that thing is actually determined by two numbers. Suspended solids and particle size are a pair, content and distribution are a pair, stages and precision are a pair. Standards write them as two rows precisely to remind us of this; treating two rows as one is the most common shortcut in the industry.
XIV. Conclusion: Six Criteria You Can Take Away
- First ask "which standard's table it needs to meet." The reinjection table governs plugging (particle size, compatibility, corrosion, bacteria), while the discharge table governs dirt (COD, BOD, ammonia nitrogen, pH). Each table is missing an entire category—and the missing category is what it actually governs. For the same water stream, the gap between the two tables is a factor of 150 (Suspended Solids 1.0 vs. 150).
- If the factor by which a row's limit is relaxed with operating conditions is smaller than the factor by which the operating conditions themselves are relaxed, then it is being tightened. Permeability spans a factor of 150, yet Suspended Solids is relaxed only 30 times, oil content 10 times, and particle size 5 times. Dividing the particle size limit by the pore throat diameter, the ratio drops from 0.56 to 0.16—the widest tier is the strictest.
- The median is the midpoint of the distribution; the damage is in the tail of the distribution. Meeting the d50 limit does not constrain D90; when σg=2, D90 is 2.43 times d50. Require the full distribution, not just the median.
- Recognize imperial integer units. 0.076 mm/a is 3 mpy. It is set for tubing, not for the formation; it measures uniform corrosion and cannot control SRB pitting.
- If an indicator has an "internal source," it cannot be handled by end-of-pipe equipment alone. Oxygen at 0.10 mg/L can produce Fe(OH)₃ at 1.34 mg/L, which exactly consumes the entire Suspended Solids allowance of the ultra-low permeability tier; when sulfate at 5.65 mg/L is reduced, it pushes H₂S up to the 2.0 limit.
- Number of stages is not precision. The SS removal ceiling for three physical stages in series is 76%~95%; with influent at 150, the effluent is 7.2~36, still 7~36 times away from 1.0. At that magnitude, only a change of mechanism will do.
In the oilfield water business, the hard part is not removal—it is alignment. When a stream comes out of the well, you first need to know where it is going—which layer it will be reinjected into, or which ditch it will be discharged to; then you know which table it must meet; then you know which row in that table will fail first. And the starting point for this entire set of judgments is those six words written into local regulations: same-layer reinjection. The formation has already chosen the tier for you, and you have only one thing left to do—bring the water up to that tier.
References
- National Energy Administration. SY/T 5329—2012 "Water Quality Index and Analysis Method for Water Injection in Clastic Reservoirs" [S]. 2012. (Table 1 Recommended water quality main control indicators five grades, auxiliary control indicators, Note 1 "1≤n≤10", Note 2 "Clear water quality indicators remove oil content", Note 3 Explanation of ferrous iron and sulfide precipitation)
- Ministry of Environmental Protection. HJ 2041—2014 "Technical Specification for Oil Production Wastewater Treatment Engineering" [S]. 2014-06-10 Approved, 2014-09-01 Implemented (Published Draft). (3.1 and 3.3 Definitions, 4.3.4 Clause and Table 1 Oil production wastewater quality indicators, 4.4 Clause 15%~30% Design margin, 6.2.5 Clause and Table 2 Removal efficiency of each unit, 6.3.1.2 Clause Oil separation retention time 2~8 h, 6.3.1.3 Clause Equalization tank 10~24 h, 6.3.1.4 Clause Coagulation reaction 15~30 min and air flotation influent oil content should preferably be less than 100 mg/L, 6.3.2.2 Clause Anaerobic influent sulfate should be less than 1 000 mg/L, 6.3.2.5 Clause ORP higher than −300 mV inhibits methanogenesis, 6.3.2.6 Clause Hydrolysis Acidification 0.7~2.0 kgCOD/(m³·d) and HRT 6~12 h, 6.3.3.1 Clause Aerobic influent COD not greater than 500 mg/L, 6.3.3.2 Clause Sludge loading 0.05~0.20 kgBOD₅/(kgMLSS·d), 6.4.1 Clause Sludge production coefficient 0.3~0.7 kgDS/kgBOD₅, 6.4.3 Clause Dewatered sludge moisture content should be ≤80%)
- Standing Committee of the Shaanxi Provincial People's Congress. "Regulations on Ecological Environment Protection of Coal, Petroleum and Natural Gas Development in Shaanxi Province" [Z]. (Article 26: "Oil produced water shall be re-injected into the same layer and shall not be discharged"; the same article requires the establishment of groundwater quality observation and monitoring wells for re-injected produced water)
- Yu Chenglong, Yang Sen, Zeng Yunfei, Cen Jianfeng, Su Yaojun. Field test of applying ceramic membrane filter to produced water treatment in an offshore oilfield [J]. Natural Gas and Oil, 2020, 38(2): 110-114. (Injection layer permeability 10×10⁻³~50×10⁻³ μm²; ODP recommended oil content <8.0 mg/L, median particle size <2 μm; after ceramic membrane oil content 31.18→3.6 mg/L, median particle size 4.40→1.42 μm; previously treated by hydrocyclone, plate coalescer, air flotation, fiber ball, modified fiber ball, ultrasonic fine filter, all failed to meet standards)
- Analysis of causes and countermeasures for under-injection of water injection wells in Bohai L Oilfield [J]. Offshore Oil, 2022, 42(4). DOI:10.3969/j.issn.1008-2336.2022.04.042.(Injected water Suspended Solids 10~30 mg/L (control standard 10), median particle size 2~3 μm (within standard 3), oil content 50~300 mg/L maximum 600 (standard 30), SRB 0~100 cells/mL (standard 25); core injection water damage rate 43.8% and 35.2%; scaling products mainly calcium carbonate, magnesium scale and a small amount of organic matter; static compatibility experiment)
- Study on reservoir plugging mechanism of re-injected produced water in offshore oilfields [J]. Applied Chemical Industry, 2021, 50(z1): 27-31.(When Suspended Solids 80 mg/L, core permeability damage rate exceeds 50%; the smaller the particle size and the closer to pore throat diameter 1/3, the higher the damage degree; emulsified oil damage is no less than that of solid suspended solids)
- Study on the influence of solid particles on water injection development of low-permeability sandstone reservoirs [J]. Journal of Southwest Petroleum University (Science & Technology Edition), 2014, 36(1).(With 30% damage rate as the boundary: when core permeability is less than 10 mD, injected water particle D90 should be less than 1.00 μm; when greater than 10 mD, it can be relaxed to 5.00 μm; when median particle size exceeds pore median 1/3, bridging plugging is likely to form)
- Study on water quality and pressure-reducing injection enhancement system of Shunbei Oilfield [D]. 2024.(Water sample median suspended solids particle size, suspended solids content, and oil content all exceed industry standards; orthogonal experiment ranking is suspended solids content > median suspended solids particle size > oil content; recommended indicators: median particle size ≤1 μm, suspended solids ≤3 mg/L, oil content ≤9 mg/L; salt sensitivity critical salinity 80 514.59~120 771.88 mg/L; pressure reduction rate 26.32%)
- Reuse technology of fracturing flowback fluid from Linxing tight sandstone gas [J]. Oil and Gas Field Environmental Protection, 2018(2).(Fluid preparation water indicators: pH 7~10, salinity <60 000 mg/L, Ca²⁺ <600 mg/L, Mg²⁺ <900 mg/L, boron <10 mg/L)
- Research and application of fracturing flowback fluid treatment and recycling technology [J]. Oil and Gas Field Environmental Protection, 2021(4).(After oxidation treatment pH 7~7.5, Suspended Solids about 10 mg/L, petroleum类 14~30 mg/L, total iron 0.2~0.9 mg/L, boron 2~10 mg/L)
- Research and field application of fast-dispersing guar gum fracturing fluid system and its flowback water reuse technology [D].(Fluid preparation water ion limits Ca²⁺<60, Mg²⁺<120, Fe<8, peroxide<10, BO₃³⁻<5, salinity<30 000 mg/L; after treatment COD removal rate about 94%, SS removal rate about 93%, viscosity reduced to 1.3~1.6 mPa·s; Yan 0XX-D02 well fracturing fluid 370.5 m³, sand addition 37.8 m³, flowback rate 41%)
- Field test of Al₂O₃ ceramic membrane treatment technology for produced water in Daqing Oilfield [J]. Oil and Gas Field Surface Engineering, 2012(8).(Membrane Flux 0.25 m³/(h·m²), filtration cycle 72 h, cleaning 150 min, blowdown cycle 20 h; effluent oil content qualification rate 100%, suspended solids qualification rate 100%, median suspended solids particle size qualification rate 92%; meets ultra-low permeability reservoir "5, 1, 1" indicators)
- Public industry technical data: Application test of modified fiber ball filter in two oil production plants of Daqing Oilfield (influent oil content average 30 mg/L, suspended solids average 27 mg/L; effluent oil content 8 mg/L, suspended solids 3 mg/L, median particle size not greater than 2.0 μm; removal rate 90%, compared with "walnut shell + quartz sand" two-stage process about 50%; backwash cycle up to 72 h). Secondary citation, original volume/issue/pages not verified.
- Public industry technical data: Review of water quality requirements for fracturing flowback fluid reuse (slickwater preparation water Suspended Solids ≤50 mg/L; borax crosslinking system Ca²⁺≤100, total iron≤10, Al≤10, borate≤5 mg/L; organic boron crosslinking system Ca²⁺≤500, total iron≤15, borate≤5 mg/L; SRB≤25, IB≤100, TGB≤100 cells/mL). Secondary citation, a compilation of enterprise technical data, not standard clauses, only used for order-of-magnitude comparison.
Data notes: The limits and table notes of Table 2 are taken cell by cell from SY/T 5329—2012 Table 1 (multiple construction project environmental impact report forms and publicly released drafts mutually verified and consistent); the values for the external discharge scope are taken from HJ 2041—2014 Table 1, which is by nature a "design reference range in the absence of measured data", not an emission limit; emission limits are subject to GB 8978, local standards and environmental impact assessment approvals. The values in Table 4, Table 5, Table 6, and Table 7 are self-calculated according to the formulas given in the text, where the pore throat diameter depends on the capillary bundle model and the values of φ and τ, and another set of parameter sensitivity verification has been given in the text; D90 depends on the log-normal distribution assumption and the value of σg, and is an illustrative estimation that does not replace the measured particle size distribution. The influent and effluent data of each engineering case are all annotated with sources, and secondary citation entries have been marked as "secondary citation" in the reference list.
Nationwide multiple oilfields (waterflood development of clastic rock reservoirs
Pilot to engineering scale (single station from hundreds to tens of thousands of