Drainage Metering: A 0.5-class meter set at the 10% range is a 5-class meter; the water level difference is 12 mm acceptable, yet the flow differs by 19.5%
The previous dozens of articles all discussed how to determine the denominator—the five denominators of baseline discharge volume, water consumption per unit product, permitted emission volume, and reuse rate. This article asks a more fundamental question: where does the number in the denominator itself come from, and is it accurate? The answer is not pretty. A meter marked as 0.5 class may, under low-load conditions, have an actual accuracy equivalent to only 5 class; an open channel that has just passed liquid level comparison may have a flow deviation of nearly 20%.
Writing the emission volume as an equation involves only three factors: flow rate × concentration × time. We manage concentration errors very carefully—how to compare, how to take the five values, how to account for chloride ions—all have been written about separately. Flow rate errors are almost unmanaged—it hangs on something called a "measuring instrument," and this thing belongs neither to the process nor to water quality; in many plants, even the ledger is not in the hands of the environmental protection department. Yet it is precisely the only quantity that gets multiplied by time when wrong: a concentration error affects one batch of water, a flow rate error affects an entire year.
I. First, ask: who provides the number in the denominator
Throughout this series, the same type of equation keeps appearing: discharge volume per ton of pulp, discharge volume per ton of hide, baseline discharge volume per unit product, permitted emission volume, the several denominators of reuse rate, and the concentration ratio of circulating water. These numbers appear independent, but tracing them up one level, they all fall back to the same equation: emission volume equals flow rate times concentration times time. No matter how precisely the denominator is determined, if the flow rate itself deviates by 5%, the accuracy of all previous conversions is consumed by this layer, and in the same direction.
For a specific example: a plant operates 8 000 h per year, the main outlet has a constant flow of 18.75 m³/h, the annual discharge volume is 15 万 m³, and the permitted emission volume is also 15 万 m³—the actual discharge exactly equals the permit, not a drop more. But if the meter is DN100 with a range of 0–200 m³/h, 18.75 m³/h accounts for only 9.4% of the range, and 0.5 class calculated as %FS is ±1.0 m³/h, i.e., ±5.3%. The book value becomes 15.8 万 m³, exceeding the permit by 5.3%. This "exceedance" comes not from production, not from the process, and not from illegal discharge, but solely from a meter's range dial.
So this article does not discuss the process, but only three things that almost no one calculates on site: how errors are expressed, where they are amplified, and why they will not be averaged out.
II. Two ways of expressing errors, opposite amplification directions, same consequences
There are only three technical routes for discharge metering on site: full-pipe flow meters (mostly electromagnetic), open channels with standard weirs/flumes equipped with level gauges, and the geometry of the weir/flume itself. Their error labeling methods are completely different, which is the starting point of all subsequent troubles.
| Device | How the error is specified | Amplification mechanism | When it is worst |
|---|---|---|---|
| Pipeline electromagnetic flowmeter | Percentage of full scale (%FS) or percentage of reading (%RD); both notations are in use | A fixed absolute error divided by an ever-smaller actual flow rate | Low load, oversized meter for the duty, low nighttime flow |
| Open-channel ultrasonic level gauge | Level in millimeters (mm) | Amplified by the exponent of the flow formula: the error is multiplied by n and then divided by the head h | Low head, oversized weir/flume, dry season |
| Weir/flume body | Geometric dimensions (throat width, crest width, flume bottom elevation) | Enters the discharge coefficient directly and does not vary with operating conditions | Construction deviation, flume deformation, siltation |
In one sentence: the error of an electromagnetic meter is fixed in absolute terms and drifting in relative terms; the error of an open channel is amplified in relative terms by an exponent. The two paths look entirely unrelated, yet both point to the same operating condition—low flow and low water level. And industrial wastewater happens to run year-round at low flow and low water level: the design selects equipment based on the maximum hourly flow, while actual operation follows the average daily flow, and a three-to-five-fold difference in between is the norm.
III. Electromagnetic Flowmeter: Accuracy Class × Full Scale ÷ Actual Flow = Effective Accuracy
First, the thing most easily overlooked: the "class" in Class 0.5 is not an accuracy; it is a coefficient. It must be multiplied by something to be meaningful, and that something is the full scale.
In the industry, there are two ways of writing Class 0.5, both of which can be found in manuals and catalogs: one based on 0.5% of the reading (%RD), and one based on 0.5% of the full scale (%FS). Many catalogs state "take the larger of the two." This is not wordplay; under low-load conditions, the two differ by an order of magnitude.
| Approach and Range | Normal Flow | % of Range | Absolute Error at 0.5%FS | Relative Error Converted to That Point |
|---|---|---|---|---|
| DN100, 0~200 m³/h | 20 m³/h | 10% | ±1.0 m³/h | ±5.0% (equivalent to class 5) |
| DN100, 0~100 m³/h | 20 m³/h | 20% | ±0.5 m³/h | ±2.5% |
| DN80, 0~60 m³/h | 20 m³/h | 33% | ±0.3 m³/h | ±1.5% |
| DN50, 0~40 m³/h | 20 m³/h | 50% | ±0.2 m³/h | ±1.0% |
All four meters in Table 2 are class 0.5, with a price difference of only a few hundred yuan, yet their actual performance differs by a factor of 5. DN100 with 0~200 m³/h is the default setting at many sites—because the pump's rated flow is stated as 200, the selection is quoted accordingly as 200. But the pump's rated flow is an upper limit, not the normal flow. Once the upper limit enters the range, the normal flow drops to 10%, and the error increases tenfold.

Converting the error into money makes it feel more direct. ±5% of 20 m³/h is ±1 m³/h; over a year, 8 000 h amounts to ±8 000 m³. Roughly calculated at an industrial tap water plus sewage treatment fee of 4 元/m³ (regional differences are large; this is only an order-of-magnitude reference), the annual difference is 3.2 万 yuan. Yet for the same 5%, if it is used only to calculate the environmental protection tax, the annual difference is only about 900 元 (see Section 10). The same error is painful on the cost ledger but painless on the tax bill—this explains why a large number of meters at main outfalls go uncalibrated year after year: on the very ledger that is most assessed, it happens to be unimportant.
There is really only one rule for selection: set the upper range limit at 1.5–2 times the normal flow, so that the normal flow falls within 50%–80% of the range. Only then is a 0.5 class truly a 0.5 class. If this cannot be achieved, reduce the pipe diameter—installing a DN50 meter on a DN100 pipe with a reducer transition is cheaper than replacing it with a 0.2 class meter, yet the effect is much better. Industry literature generally points out that when the actual flow is below 30% of the range, the nominal accuracy no longer holds; the turndown ratio is conventionally 1:20 to 1:100, and the larger the turndown ratio, the better the guarantee in the low-flow range.
There are also four hard conditions on the installation side, written in Section 6.3 of the Technical Specification for Installation of Online Monitoring Systems for Water Pollution Sources (CODCr, NH₃-N, etc.) (HJ 353—2019): on vertical pipes, the flow direction shall be from bottom to top; on horizontal pipes, the two measuring electrodes shall not be directly above or directly below; the upstream straight pipe length and support method shall conform to the design documents; and the pipe design shall ensure that the measuring section is full at all times. The specification also requires "building a platform outside the flowmeter installation pipeline for comparison"—this sentence is easily mistaken for a supporting requirement, but it actually writes into the construction content that "this meter will in the future be compared by someone using a portable device." In industry practice there are two more requirements not written in the main text of the specification but mandatory: upstream not less than 5 times the pipe diameter and downstream not less than 3 times the pipe diameter; and the sensor shall be grounded separately, with a grounding resistance not greater than 10 Ω.
IV. Open-channel weirs and flumes: one exponent decides everything
The physical basis of open channels is completely different from that of electromagnetic meters. It does not measure flow; it measures water level, and then converts the water level into flow using a level–flow relationship. The shape of this relationship is a power function:
The expression on the right is the whole crux. The level error dh is amplified n times in the flow and then divided once by the head h. It does not matter if you cannot remember the coefficient C; the exponent n determines how delicate this meter is.
| Weir/Flume Type | Flow Relationship | Exponent n | Flow Error of 1 mm at h=100 mm | Same Error at h=300 mm |
|---|---|---|---|---|
| Parshall Flume | Q = 0.372 b (3.28h)1.569 b0.026 | 1.569 | 1.57% | 0.52% |
| Rectangular Thin-Plate Weir | Q = 1.84 (b − 0.2h) h1.5 | 1.5 | 1.50% | 0.50% |
| Triangular Thin-Plate Weir (90°) | Q = 1.4 h2.5 | 2.5 | 2.50% | 0.83% |
The formula for the Parshall flume in Table 3 is cited from a quantitative study on throat width error in Acta Metrologica Sinica 2025 年 (where b is the throat width and h is the measured upstream head); the triangular and rectangular weirs use general empirical formulas, and although the coefficients vary slightly among versions, the exponents are consistent—the three values 1.5, 1.569, and 2.5 represent the respective "character" of these three weirs and flumes.
Many people will readily draw a conclusion: the triangular weir has the highest accuracy. This conclusion holds at the same head, but in engineering it is the opposite. The exponent of the triangular weir is 2.5, meaning it has the worst tolerance for water level; the reason it is recommended for small flows is that at small flows it can still form a sufficient head over the weir, not because it is more accurate. The real criterion is not "which weir or flume has higher accuracy," but "how much head this weir or flume can provide at this flow rate." If the head is insufficient, any weir or flume is an amplifier.
Incidentally, a selection item that is easily overlooked: the head loss of a Parshall flume is only about one quarter that of a thin-plate weir, and the throat velocity is high, making sediment deposition difficult. For industrial wastewater discharge outlets containing suspended solids, this point often determines success or failure more than accuracy—once siltation occurs in front of the weir, the water level datum is raised overall, and siltation is gradual, so no single comparison will report an error.
V. The arithmetic incompatibility of 12 mm and 10%
This is the most critical paragraph of this article. The acceptance basis for open channel flowmeters is the "Technical Specification for Acceptance of Online Monitoring Systems for Water Pollution Sources (CODCr, NH₃-N, etc.)" (HJ 354—2019), which gives two limits:
- 6.3.1 Liquid level comparison error: the portable device and the online equipment record 1 groups synchronously every 2 min, for 6 consecutive groups, take the maximum value, not greater than 12 mm;
- 6.3.2 Flow comparison error: synchronously measure the cumulative flow of 10 min, not greater than ±10%.
The two limits are written separately in two clauses, each checked on its own. But they govern the same thing, with a power function in between. Substituting 12 mm into the exponent of Table 3, the results are as follows.
| Head over weir h | Parshall flume (n=1.569) | Rectangular weir (n=1.5) | Triangular weir (n=2.5) |
|---|---|---|---|
| 100 mm | 19.5% | 18.5% | 32.8% |
| 150 mm | 12.8% | 12.2% | 21.2% |
| 200 mm | 9.6% | 9.1% | 15.7% |
| 250 mm | 7.6% | 7.3% | 12.4% |
| 300 mm | 6.3% | 6.1% | 10.3% |
Reading Table 4 across makes it clear: the liquid level comparison just barely sits on the 12 mm qualification line, while the flow comparison will definitely fail when the head is below 192 mm. The critical heads back-calculated are—Parshall flume 192 mm, rectangular weir 183 mm, V-notch weir 309 mm. In other words, only for open channels with a head stably above 200 mm are these two limits two ways of saying the same thing; below 200 mm, they are two different things, and they contradict each other.
Even more worth comparing is another document. The "Technical Specifications for Monitoring of Total Pollutant Discharge" (HJ/T 92—2002) gives conditions for four flow measurement methods, among which the "electromagnetic flowmeter" requires the discharge outlet to have "a regular straight section of not less than 2 m, width 0.8 m~1.5 m, water level height not less than 0.4 m"; the current meter method requires "a straight flow-through section of not less than 3 m, water level height not less than 0.1 m".
The same "minimum water level" is written as 0.1 m in one document and 0.4 m in another, a difference of 4 times. Is it a typo? A quick calculation shows it is not. 0.4 m corresponds to a 12 mm flow error of 4.75%, which falls safely within 10%; 0.1 m corresponds to 19.5%, exceeding it by a factor of two. The number 0.4 was back-calculated from the error budget, while the number 0.1 only concerns "whether it can be measured".
In terms of design, the conclusion is very specific: for the flow measurement section where the open channel flowmeter is located, the normal water level should be designed as 0.4 m, and 0.1 m can only be treated as an accident margin. When building the channel, digging 30 cm more is an order of magnitude cheaper than replacing with a 0.2-class level gauge afterwards, yet the effect is much better. This is also the reason why the "weir/flume body" row exists in Table 1—geometric dimensions are the only error source that does not drift with operating conditions but that no one will go back and recheck.
VI. Three Stages, Three Limits, Fivefold Tolerance
Putting the limits of flow measurement at the three stages together reveals a very interesting gradient.
| Stage | Basis | Level Limit | Flow Limit |
|---|---|---|---|
| Factory Inspection | HJ 15—2019 Technical Requirements and Test Methods for Ultrasonic Open Channel Sewage Flow Meters | Measurement error ≤3 mm, precision ≤0.5% | Measurement error ≤2% |
| Installation Acceptance Comparison | HJ 354—2019 Article 6.3 | Comparison error ≤12 mm (maximum of 6 measurements) | Comparison error ≤±10% (10 min cumulative) |
| Routine Operation Comparison | HJ 355—2019 (no less than 1 times per quarter) | ≤12 mm | ≤±10% |
Factory 2%, acceptance 10%, relaxed by 5 times in between. These 5 times are not because the standard was written loosely, but because the standard acknowledges one thing: after installation on site, the dominant error is no longer the instrument, but the installation conditions—the construction deviation of the weir flume, the straightness of the channel, the downstream backwater effect, and the centering of the level gauge. The 2% factory accuracy of the instrument simply cannot be realized in a non-standard channel.
Seven, Submergence: The Only Place Where a Parshall Flume Needs a Second Water Level
All the preceding discussion rests on the same premise: the weir is under free flow. Free flow means the downstream water level is low enough that it does not back up the throat outflow, so the flow rate is determined solely by the upstream head—and this is precisely the entire reason why "measuring only one water level is enough to calculate the flow rate."
This premise has a clear threshold. Industry references give the critical submergence for a Parshall flume as 0.6–0.7 (submergence σ equals downstream head divided by upstream head); beyond this value, the free-flow assumption fails, and correction must be made according to the reduction formula given in the Verification Regulation for Open Channel Weir and Flume Flowmeters:
Where Q is the flow rate calculated under free flow, and QK is the submerged-flow reduction, determined jointly by the submergence σ and the upstream head h (for specific coefficients, refer to Equations 42 and 43 in the original regulation). The actual situation on site is: most online open channel flowmeters have only one level gauge, installed at one-third of the converging section, and have no knowledge of the downstream water level at all, so they always calculate as free flow.
The consequence has a direction: when the downstream is backed up, the actual flow capacity decreases, yet the instrument still converts according to the free-flow formula, so the reading is high. A high reading means over-recording of discharge volume—self-inflicted trouble for enterprises with tight permitted discharge volumes, and extra payment where billing is by water volume. The causes of backwater are commonplace: the outlet is directly submerged below the normal water level of the main channel, downstream siltation, river water level rise during the rainy season, or someone else discharging when a drainage ditch is shared.
Eight, Formula Versions: 1.522 and 1.569
There is another point even more subtle than submergence. Table 3 above used the exponent 1.569, but in publicly available references the exponent for the Parshall flume is not limited to this one: common expressions for the power exponent of standard flumes range from 1.522 to 1.55, and some fits by throat width go up to 1.569. The three numbers look similar—how much difference do they make when plugged in?
| Head above the weir h | Relative deviation of flow between the two versions | Share of the ±10% comparison limit |
|---|---|---|
| 100 mm | −10.3% | 103% |
| 150 mm | −8.5% | 85% |
| 200 mm | −7.3% | 73% |
| 250 mm | −6.3% | 63% |
| 300 mm | −5.5% | 55% |
The version difference of a single exponent alone can consume 55% to 103% of the comparison limit. More importantly, it is not a constant: the lower the head, the greater the difference. This means it does not manifest as "the data as a whole is slightly off," but as "a larger deviation in the dry season and a smaller one in the wet season"—the monthly reports look reasonable, yet the annual total does not add up, and the direction of the discrepancy even flips with the seasons.
This is not a hypothetical risk: in a penalty decision issued by the 2026 年 8 月 Luoyang Municipal Ecology and Environment Bureau, the facts of the violation are stated plainly — the on-site collection program was the 2019 年 version installed during station building construction, 1.0 and had not been updated for a long time, "the calculation formula of the software platform had long been inconsistent with the algorithm required by the National Development and Reform Commission platform 4.2 system, resulting in long-term statistical errors in wastewater discharge volume data". The first violation fact in the same decision is "the flow meter did not normally carry out annual mandatory verification".
Nine, four penalty tickets, not one of them because of concentration
Putting the four law enforcement documents disclosed in 2026 年 together, it can be seen that the regulatory lever has already shifted position.
| Region and Document Number | Date | Violations Established | Amount | Legal Basis |
|---|---|---|---|---|
| Luoyang, Henan Yu 0381 Huan Fa Jue Zi [2026] No. 55 | 2026-08-11 | ① The flowmeter did not undergo the annual mandatory verification as required; ② The algorithm of the collection software version 1.0 had long been inconsistent with that of the national data platform 4.2, resulting in long-term statistical errors in emission data | CNY 4.88 万 | Article 36, Item 4 of the Regulations on the Administration of Pollutant Discharge Permits |
| Qingdao, Shandong Lu Qing Huan (West Coast) Fa [2026] No. 22 | 2026-10-15 | The flowmeter used in the online monitoring system at the wastewater discharge outlet was not verified as required, constituting a failure to periodically verify monitoring equipment | CNY 8.3 万 | Article 42, Paragraph 1, Item 2 of the Regulations on Ecological and Environmental Monitoring |
| Dalian, Liaoning Wafangdian Branch Case | 2026-09 Disclosed | The electromagnetic flowmeters at the inlet and outlet completed only one accuracy verification at level 0.5 and were not verified thereafter (the verification interval for levels below 0.2 is 2 年) | CNY 2 万 | Article 42 of the Regulations on Ecological and Environmental Monitoring |
| Wuhu, Anhui Order for Correction Decision | 2026-08 | The ultrasonic open-channel flowmeter (WL-1A1) at the main discharge outlet 2026 年 did not undergo quantity value traceability, nor were the first- and second-quarter comparisons conducted | Ordered to correct | Requirements related to self-monitoring |
None of the four cases involved excessive effluent concentrations; all were about non-compliant metering itself: no verification, no traceability, no comparison, and incorrect formula versions. Moreover, the clues came almost entirely from off-site supervision—abnormal fluctuations in water quantity data on the platform and push notifications of clues about exceeding permitted discharge amounts. Falsifying concentration requires human surveillance, but falsifying flow leaves a fingerprint in the data: it invariably manifests as a slanted line rather than a cluster of scattered points.
The fourth case deserves particular attention: the problem identified for this enterprise was not "failure to conduct comparison," but "failure to conduct quantity traceability, and failure to conduct first- and second-quarter comparison" — the two matters are listed separately. In other words, verification (against the meter) and comparison (against the site) are two independent obligations, and missing either one counts as non-compliance. This corresponds exactly to the three links in Table 5: factory departure relies on type testing, site entry relies on verification, and after installation it relies on comparison — three checkpoints, each governing one segment.
X. From Instantaneous Flow to Tax Bill: A Pure Multiplication Chain
Now put the error back on the path it actually travels. Emission accounting, pollution equivalent, environmental protection tax, and permit comparison — these four steps are all multiplication or division; not one of them is addition or subtraction.

| Step | Formula | Result | Relative Error Propagated to Next Step |
|---|---|---|---|
| Instantaneous flow | See first row of Table 2 | 20 ±1.0 m³/h | ±5.0% |
| Annual discharge volume | 20 × 8 000 h | 160 000 ±8 000 m³ | ±5.0% |
| Pollutant discharge volume | × 80 mg/L | 12.8 ±0.64 t COD | ±5.0% |
| Number of pollution equivalents | ÷ 1 kg (COD equivalent value) | 12 800 ±640 | ±5.0% |
| Environmental protection tax | × 1.4 元/pollution equivalent | 17 920 ±896 元 | ±5.0% |
| Permit comparison | Permitted 150 000 m³/a | Book value 160 000, exceeded by 6.7% | Determination flips |
The last row of Table 8 is the key point of this article: when the error reaches the end of the multiplication chain, what it encounters is no longer a process indicator but an administrative threshold. The permit is a point, and the error is an interval; once the interval crosses that point, the nature changes—from "compliant" to "exceeding permitted discharge."
There is an easily confused point here that deserves to be unpacked. The example in the table above is actual emissions 16 万 versus permitted 15 万, which is a genuine exceedance 6.7%, and what needs to be reduced is production. Suppose another plant has actual emissions 15 万 that happen to equal the permit, the meter reads high by 5%, the book value is 15.75 万, an exceedance of 5.0%—it is likewise an exceedance, but entirely different in nature; a single calibration of the meter brings it back into compliance. When a site receives an inspection notice of "exceedance of permitted emission volume," the first thing to do should be to determine which type it belongs to; and the only way to tell is whether this meter has ever been compared/calibrated, and whether the comparison records still exist.
XI. What Can Be Averaged Out, and What Cannot
At this point there is a natural rebuttal: errors are positive and negative, so over a year some of it should cancel out. This idea is half right, and the wrong half is precisely the fatal part.
The precondition for averaging out is randomness: high today, low tomorrow, independent of each other, converging toward the true value as the sample grows. Errors on the concentration side largely belong to this category—sampling, digestion, colorimetry, each independent—and the ±15% given for comparison limits relies on exactly this property.
Structural bias on the flow side does not have this property. Once it arises, its direction is fixed, with the same sign all year:
- Range set too large: the error limit is bidirectional, but the systematic part varies monotonically with load, so at low load it deviates in one direction all year;
- Submergence not corrected: only reads high, never low;
- Electrode scaling, liner wear: only reads low;
- Siltation before the weir: the water-level datum is raised overall, so it only reads high;
- Exponential version: reads low, and deviates more at low heads.
Four of the five are one-directional. A one-directional error multiplied by 365 天 is not averaged out—it is amplified into a slanted line. This also explains why the four penalty notices in Section IX all started from the clue of "abnormal fluctuation in water quantity data"—abnormal fluctuation is a random term, while a slanted line is a structural term, and the two have completely different shapes on the data surface.
There is an inexpensive way to identify structural bias on site: calculate the discharge per unit product (m³/t product, or m³/10,000 yuan of output value) and plot it monthly. If the process has not changed, the raw material has not changed, and the output is the same, yet this line shows an interannual drift exceeding 5% and the drift direction is consistent, then the first thing to do is not to check the process but to check the meter. Because this ratio uses output as the denominator, it exactly offsets output fluctuations, and what remains is the metering drift.
XII. Comparison of Six Metering Methods
Gather the conditions scattered above into one table, which can be followed when selecting equipment. The flow range column is quoted from the requirements of HJ 353 Table 2 and HJ/T 92; it is the envelope of the full series of weirs and flumes, not the range of a single device.
| Method | How Accuracy Is Expressed | Flow Range | Mandatory Installation Conditions | Main Failure Modes | Verification and Comparison |
|---|---|---|---|---|---|
| In-line Electromagnetic Flowmeter | Class 0.5: ±0.5%RD or ±0.2%FS (some are rated at ±0.5%FS) | Full pipe, conductive, DN6–DN2000 | Full pipe at all times; vertical section from bottom to top; electrodes not at the exact top or bottom; upstream 5D, downstream 3D; grounding ≤10 Ω; external comparison platform provided | Not full pipe, bubbles, electrode scaling, oversized range | Mandatory verification; period 2 年 for those below Class 0.2 |
| Ultrasonic Open Channel Flowmeter + Parshall Flume | Level ≤3 mm, flow ≤2% (factory); comparison 12 mm / ±10% | 0.36–3.3×10⁵ m³/h | Standard flume; level gauge located at 1/3 of the converging section; free flow σ<0.6–0.7; no leakage between flume body and channel walls | Submergence not corrected (reads high), siltation upstream of weir (reads high), flume deformation | Quarterly comparison; annual quantity traceability |
| Rectangular Thin-Plate Weir | Same as above | 5–1.8×10⁵ m³/h | Level gauge located at 3–4 times the maximum level upstream of the weir plate; no burrs at the weir notch; side contraction correction | Head too low, weir notch corrosion, side contraction not corrected | Same as above |
| Triangular Thin-Plate Weir | Same as above | 0.72–6 480 m³/h | Same as above; accurate notch angle; dedicated for low flow | Head too high and overflowing the range, notch wear | Same as above |
| Current Meter Method (Channel) | Single-point velocity × cross-sectional area | Regular channel, for temporary or verification use | Hard and smooth channel bottom, regular shape; straight section not less than 3 m; water level ≥0.1 m | Selection of cross-section coefficient, uneven velocity distribution | Manual comparison |
| Container Method | Volume ÷ time | Daily drainage less than 50 t | Appropriate drop at the overflow outlet; accurate timing | Timing error, incomplete collection of overflow | — |
XIII. Eight On-Site Self-Check Items
Go through them in order; one discharge outlet can be checked in an hour. The first five check "whether the design is right," and the last three check "whether it is still right now."
- Calculate the ratio: divide the normal flow rate by the upper range limit; if it is below 30%, prepare to reduce the pipe diameter or change the range. This step requires no tools; you can calculate it by looking at the trend chart.
- Check full-pipe flow: check whether there are air pockets in horizontal pipe sections, whether the flow direction in vertical pipe sections is from bottom to top, and whether the electrodes are at the top or bottom. If any of the three does not match, rectify it first before discussing accuracy.
- Measure the straight pipe section and grounding: upstream 5D, downstream 3D; measure the grounding resistance on site, not greater than 10 Ω; check whether the signal cable is in the same tray as the variable-frequency drive cable.
- Measure the throat width on site: use a tape measure to measure the throat on site and compare it with the value entered in the software. Construction deviation, concrete shrinkage, and lining detachment can all change this value, and it directly enters the flow coefficient.
- Check the normal water level: if it is below 0.4 m, the error budget has already been exceeded (Section 5); if it is below 0.1 m, even "can be measured" does not hold.
- Measure the submergence ratio: divide the downstream water level by the upstream head; if it exceeds 0.6, check whether correction has been applied. If there is no second level gauge, this item can only be measured manually once.
- Check the formula version: check the four items—weir/flume type, throat width, exponent, and unit—one by one against the on-site physical entity; check whether the acquisition software version is consistent with the platform algorithm, and compare one hour of data from both sides for the same period.
- Check three records: the validity period of the calibration certificate, the quarterly comparison report, and the calibration certificate of the portable device used for comparison. The third one is most often missing, and if it is missing, the first two do not hold.
XIV. Conclusion
Back to the question at the beginning: who provided the number in the denominator. The answer is a meter, and a power function.
The "class" of this meter is not accuracy; it is a coefficient that only becomes meaningful when multiplied by the full scale, so at the 10% range it degrades to class 5; the exponent of that power function determines how many times the level error is amplified, so the same 12 mm is 6% at a head of 300 mm, and 32.8% at 100 mm. Both paths lead to low load and low water level—and this is exactly the long-term operating range of industrial wastewater.
What is more worth remembering is the relationship among that set of numbers: the 12 mm and ±10% given by HJ 354 are mutually consistent only when the head over the weir is higher than 192 mm; while HJ 91.1 sets the lower limit of the water level in the flow measurement section at 0.1 m, and HJ/T 92 for electromagnetic type also states 0.4 m. 0.1 and 0.4 differ by a factor of 4; what differs is not the degree of rigor, but that these two numbers answer different questions: one answers "whether it can be measured," and the other answers "whether it is measured accurately." The same phrase "not less than" carries two different things.
The last sentence is left for practice: design open channels according to the normal water level of 0.4 m, select the range of electromagnetic meters at 1.5–2 times the normal flow, compare once each quarter, and check the formulas in the software against the on-site physical entity once each year. The total cost of these four things is far lower than a fine for "long-term statistical errors in discharge volume data"—among the four cases disclosed in 2026 年, the lightest one was 2 万 yuan.
References
- Ministry of Ecology and Environment. HJ 353—2019 Technical specification for installation of online monitoring systems for water pollution sources (CODCr, NH₃-N, etc.): Article 6.3, Table 2. 2019.
- Ministry of Ecology and Environment. HJ 354—2019 Technical specification for acceptance of online monitoring systems for water pollution sources (CODCr, NH₃-N, etc.): 6.3.1, 6.3.2. 2019.
- Ministry of Ecology and Environment. HJ 355—2019 Technical specification for operation of online monitoring systems for water pollution sources (CODCr, NH₃-N, etc.). 2019.
- Ministry of Ecology and Environment. HJ 91.1—2019 Technical specification for wastewater monitoring. 2019.
- Ministry of Ecology and Environment. HJ 15—2019 Technical requirements and test methods for ultrasonic open channel wastewater flowmeters. 2019.
- State Bureau of Metrology. JJG 711—1990 Verification regulation for open channel weir and flume flowmeters (trial).
- Ministry of Water Resources. JJG (Water Resources) 004—2015 Metrological verification regulation for open channel weir and flume flowmeters: Equations 41–43, Appendix A.
- State Administration for Market Regulation. GB/T 18659—2012 Electromagnetic flowmeters; JJG 1033—2007 Verification regulation for electromagnetic flowmeters.
- Ministry of Ecology and Environment. HJ/T 367—2007 Technical requirements and test methods for electromagnetic pipeline flowmeters.
- Acta Metrologica Sinica. Quantitative study on the error caused by throat width of Parshall flume open channel flowmeters. 2025, 46(8): starting page 1127.
- Ministry of Ecology and Environment. Compilation notes for the "Technical Guide for Setting Monitoring Points at Fixed Pollution Source Discharge Outlets (Draft for Comments)". 2023-03.
- Standing Committee of the National People's Congress. Environmental Protection Tax Law of the People's Republic of China: Appendix II Table of Taxable Pollutants and Equivalent Values. Amended 2018.
- Luoyang Municipal Ecology and Environment Bureau. Yu 0381 Huan Fa Jue Zi [2026] No. 55 Administrative Penalty Decision. 2026-08-11; Qingdao Municipal Ecology and Environment Bureau. Lu Qing Huan (West Coast) Fa [2026] No. 22. 2026-10-15; Wafangdian Branch of Dalian Municipal Ecology and Environment Bureau, case of online monitoring equipment not verified beyond the time limit. 2026-09; Wuhu Municipal Ecology and Environment Bureau, Decision on Ordering Correction of Illegal Acts. 2026-08.
Nationwide multi-industry coverage (industrial park wastewater treatment plants,
Pilot to engineering scale (tens to tens of thousands of m³/d; single meter DN50