Evaporative Crystallization: Theoretical 627 kWh per Ton of Water, MVR Buys Only 7 kWh; the Other 20 kWh Is Paid for the Salt

The previous article discussed how membranes concentrate water to 4 times, and the concentrate still needs somewhere to go. This article discusses evaporating water to dryness by thermal methods: first, clearly calculate what MVR is actually buying, then clearly calculate what it cannot afford—boiling point elevation, water of crystallization, and mixed salts; none of these three are on the equipment quotation.

Industrial Water Treatment Technology Notes · 2026-11-22 · Full text approximately 7 300 words, 12 tables, 3 figures, 18 references

Turning one ton of water from liquid into steam requires 2 257 kJ, equivalent to 627 kWh. This is a physical constant that no one can bypass. But MVR evaporating one ton of water costs only 27 kWh. The difference of 600 kWh is not saved by anyone; it was never purchased—what it buys is something else: raising the temperature of the secondary steam by more than ten degrees. So the real question is not "why is MVR so energy-efficient," but "are these ten-plus degrees enough?" Saturated brine itself first takes away 8.8 degrees, and only the remainder is left for the heat exchange surface.

I. 627 degrees is water's account; MVR buys another commodity

First, make this 627 clear. The latent heat of vaporization of water increases as temperature decreases; at 100 ℃ it is 2 257 kJ/kg, and at 60 ℃ it is 2 358 kJ/kg, equivalent to 627 and 655 kWh per ton, respectively. This is the energy of one phase change; whether you use steam, electricity, or flue gas, as long as you want water to become steam, someone has to pay this account.

Table 1 Latent Heat of Vaporization of One Ton of Water (at saturation temperature, converted based on 1 kWh=3 600 kJ)
Saturation TemperatureLatent Heat of Vaporization kJ/kgEquivalent Power Consumption kWh/tSpecific Volume of Saturated Steam m³/kg
60 ℃2 358.3655.17.671
70 ℃2 333.5648.25.045
80 ℃2 308.8641.33.407
90 ℃2 283.2634.22.361
100 ℃2 257.0626.91.694

How does triple-effect evaporation pay this bill? It does not pay 627; it pays 304. Because the secondary steam from the first effect is used as the heat source for the second effect, and that from the second effect is passed to the third effect, the same latent heat is used three times. The measured steam consumption per ton of water for triple-effect evaporation in the industry is 0.37~0.46 t (commonly 0.40), multiplied by 2 738 kJ/kg gives 1 095 MJ, equivalent to 304 kWh of heat. Dividing 627 by 304 gives 2.06—this is the "energy efficiency ratio" of triple-effect evaporation.

MVR takes another route: the secondary steam is not sent to the next effect, but into a compressor, where its pressure and saturation temperature are raised together, and then returned to the same heat exchanger as a heat source. The latent heat circulates in a closed loop, and the equipment only pays for the compressor's electricity. 30 kWh divided by 627 gives 20.9. Therefore, the 2 times of triple-effect and the 21 times of MVR are two numbers under the same definition:

COP = latent heat ÷ input energy (triple-effect: heat; MVR: electricity)
Criterion one: Whenever MVR and a steam heater are compared together for "efficiency," what is compared is not efficiency but the unit price of two different commodities. MVR sells "temperature rise," while steam sells "latent heat." The former is priced per K, the latter per t, and between them lies only the ratio of electricity price to steam price.

There is also a sense of scale worth establishing: an evaporation rate of 10 t/h corresponds to a heat load of 6.27 MW. What a triple-effect evaporator must transfer is exactly this 6.27 MW, relayed effect by effect by 0.40 t/h of steam; whereas MVR needs only one compressor of about 300 kW to circulate this 6.27 MW of latent heat in place. What differs twentyfold is not energy, but the "mode of transport."

This also explains why MVR's savings disappear where electricity prices are extremely high or steam prices are extremely low—it does not create energy out of thin air, but merely changes buying fuel into buying electricity, and changes the latent heat bill from "buying" to "moving." How much one move costs can be calculated in the next section.

II. The temperature rise budget is only a dozen or so degrees, and the salt takes 8.8 first

For a heat exchanger to transfer heat, there must be a temperature difference. MVR's temperature difference comes from the compressor, and the compressor can only raise the steam by a dozen or so degrees—this is not conservative design, but a dual constraint of physics and machinery: the larger the temperature rise, the larger the compression ratio, the more severe the outlet superheat, the more expensive the machine, and the power consumption increases by two or three degrees per K (Section III).

The trouble is that these dozen or so degrees are not all available to the heat transfer surface. The boiling temperature of a solution is higher than that of pure water at the same pressure, and this difference is called boiling point elevation (BPE). Its physical source is that the solute lowers the chemical potential of water, so the temperature must be raised for the vapor pressure to equal the external pressure again. The boiling point of saturated brine at atmospheric pressure is 108.8 ℃, so the BPE is 8.8 K.

Table 2 Boiling Point Elevation of Common Saturated Salt Solutions at Atmospheric Pressure (Engineering Value Ranges, Varying with Concentration and Coexisting Ions)
SystemSaturated BPESaturated Boiling Point at Atmospheric PressureImplication for MVR
NaCl saturated8.8 K (8~10)108.8 ℃Coverable by conventional centrifuges, but consumes half of the temperature rise
Na₂SO₄ saturated10~12 KApprox. 110~112 ℃Already approaching the upper limit of Roots blowers
NH₄Cl saturated12~14 K—Requires two-stage or screw compressors
CaCl₂ saturated25~30 K—Pure MVR is basically infeasible; must be coupled with multiple-effect evaporation

How should this be written in the design? The formula commonly used in the industry is very simple:

Design temperature rise = Boiling point elevation + Heat transfer approach (2~3 K) + Safety margin

The approach of 2~3 K is the lower limit for the heat exchange surface to work effectively; any smaller and you have to brute-force it with more area. So saturated brine requires a temperature rise of 8.8+3=11.8 K, while evaporating pure water requires only 0+3=3 K. The same machine: one needs to be raised by 11.8 degrees, the other only by 3 degrees—see Figure 1 for how much the specific power consumption differs.

Relationship between temperature rise budget and specific power consumption
Figure 1 Left: Comparison of temperature rise budgets for pure water and saturated brine; the salt alone accounts for 8.8 K. Right: Variation of specific power consumption with saturation temperature rise; the solid line is calculated in this paper based on isentropic compression, and the circles are simulation data for screw compressors. The vertical coordinate difference between the two points is 20 kWh/t, which is exactly 8.8 K times 2.3.

Read Figure 1 as a single number: the 7.0 kWh/t for pure water and the 26.9 kWh/t for saturated brine differ by 19.9. And 8.8 K times 2.3 kWh/(t·K) is 20.2. In other words, eighty percent of the electricity for evaporating brine is paid for the salt, and only twenty percent is paid for the water. Said another way for other occasions: the energy consumption of MVR does not depend on how much water you need to evaporate, but on how much salt is in the water.

Criterion two: When you receive an MVR quotation, first ask for three things—the design evaporation temperature, the measured BPE at the final concentration, and the saturation temperature rise of the compressor. A quotation lacking BPE is equivalent to leaving the most expensive item as an open-ended contract. Selection must calculate BPE based on the final concentration, not the average concentration: at the end of evaporation, the concentration is highest, the BPE is greatest, and the effective temperature difference is smallest—that stage is the bottleneck of the system.

III. The price of 1 K temperature rise: 2.3 kWh

This 2.3 can be calculated by yourself; you don't need to trust any sample. Treat saturated steam as an ideal gas and perform isentropic compression, taking k=1.33, cp=1.86 kJ/(kg·K):

w = cp·T₁·[(p₂/p₁)^((k−1)/k) − 1], then divide by isentropic efficiency 0.80 and motor efficiency 0.95

100 ℃ evaporation, raised by 3 K, specific power consumption 7.0 kWh/t; raised by 11.8 K, 26.9; raised by 15 K, 34.3; raised by 28 K (the order of magnitude for saturated calcium chloride), 64.7. The unit price per K obtained by point-by-point differencing is stable at 2.25~2.31; taking 2.3 is sufficient.

Table 3 Design Temperature Rise and Specific Power Consumption (Evaporation Temperature 100 ℃, Isentropic Efficiency 0.80, Motor 0.95)
BPEDesign Temperature RiseCompression RatioDischarge Superheat TemperatureIdeal Work kWh/tWith Efficiency Included kWh/t
0 (Clean Water)3.0 K1.116110.3 ℃5.37.0
3 K6.0 K1.237120.2 ℃10.413.7
5 K8.0 K1.323126.9 ℃13.918.3
8.8 K (NaCl Saturated)11.8 K1.501139.6 ℃20.526.9
10 K13.0 K1.562143.6 ℃22.529.7
15 K18.0 K1.834160.6 ℃31.341.2
25 K (CaCl₂ Saturated)28.0 K2.498195.1 ℃49.264.7

One column in Table 3 deserves separate mention: the discharge superheat temperature. Raise it by 3 K, the outlet is 110 ℃; raise it by 11.8 K, the outlet is 140 ℃. This is not a typo—the isentropic compression line of saturated steam heads into the superheated region, and the larger the compression ratio, the more severe the outlet superheat. Therefore, water must be sprayed into the MVR piping to desuperheat, bringing the superheat down to near the saturation temperature before entering the heat exchanger; otherwise, local dry wall and coking will occur. The spray water volume is calculated based on the degree of superheat, typically 1%~3% of the steam volume, and soft water must be used; otherwise, it is equivalent to adding salt into the system.

This column also explains why the compression ratio cannot be arbitrarily increased: at an outlet of 195 ℃, the allowable temperature of ordinary rubber gaskets, some 316L, and even the scaling rate of the feed liquid have all changed. Manufacturers keep the compression ratio at 1.2~1.8 (temperature rise 8~20 K), not just to save power.

Table 4 Compressor Types and Achievable Temperature Rise (Common Engineering Range)
TypeAchievable Temperature RiseApplicationLimitations
Roots (twin-lobe)≤20 KSmall to medium flow, medium to low BPENoise, leakage, efficiency drops rapidly with pressure ratio
Single-stage centrifugal (imported)Approx. 8 KLow BPE, large flowNarrow high-efficiency range, stalls when deviating from design point
Single-stage centrifugal (domestic)Approx. 21 KMedium-scale zero liquid dischargeBalance easily disrupted after impeller scaling
Two-stage series centrifugalApprox. 36 KHigh BPE saline wastewaterHigh investment, complex control
Single-screwUp to 40 KHigh BPE systems such as calcium chlorideOil injection/seal maintenance

IV. The Same Temperature Rise of 10 K, Three Numbers: 23, 35, 40~55

The above calculation is the ideal isentropic work. On real equipment, the same 10 K temperature rise will report three different numbers. This is not anyone exaggerating—it is three layers of real-world factors, each adding a layer of cost.

The first layer, ideal work 22.8. According to the formula in Section 3, raising from 100 ℃ by 10 K is about 22.8 (interpolated between the 8.0 K and 11.8 K rows in Table 3 at 2.3 per K). This layer involves only thermodynamics, no machine.

The second layer, simulated value 35. A simulation of a screw compressor used for MVR gives: condensing temperatures 100/102/104/106/108/110/112 ℃ corresponding to specific power consumption 10/15/20/25/30/35/40 kWh/t, i.e., 5 per 2 K, about 2.5 per K. The slope is almost the same as the calculation in this article (2.3 vs. 2.5); what differs is the intercept—the simulation includes leakage, over-compression and under-compression, and volumetric efficiency decline.

The third layer, on-site measured 40~55. The manufacturer's measured basis is: at a temperature rise of 10 ℃, power consumption per ton of water is 40~55 kWh; at a temperature rise of 15 ℃, 60~80 kWh. Going further up, the whole-unit basis including auxiliary equipment becomes 25~45 kWh/t (commonly 35), while another source simply gives 50~150 kWh/t.

Table 5 Comparison of specific power consumption definitions in public sources (same matter, four numbers)
Source DefinitionValue kWh/tBoundary ConditionsIncluded
Isentropic calculation in this paper7.0 (3 K) / 26.9 (11.8 K)100 ℃, η 0.80×0.95Compression work only
MVR experiment (NaCl 18%)16.8Suction 25 kPa, 100 HzCompressor
Manufacturer complete-unit definition A15~30Low BPE, including auxiliariesCompressor + pump + vacuum
Manufacturer complete-unit definition B25~45 (commonly 35)General saline wastewaterComplete unit
Manufacturer complete-unit definition C50~150High BPE, small flow, including marginComplete unit, conservative

16.8 This value deserves a pause. It comes from an MVR test rig using sodium chloride solution as the working fluid, under the conditions of suction pressure 25 kPa (corresponding to a saturation temperature of about 65 ℃), inlet concentration 18%, and compressor 100 Hz. The same paper also gives a more important conclusion: for every 1 percentage point increase in inlet concentration, the power consumption per ton of water rises by 8.2%, and the COP decreases by 2.7%. This is the experimental version of "BPE rising with concentration"—it does not rise linearly; the more concentrated the stream, the more expensive it becomes.

Criterion 3: For the specific power consumption figure, it is not comparable unless four things are clearly stated — evaporation temperature, design temperature rise (or final-state BPE), whether auxiliary equipment is included, and whether fouling margin is included. The easiest of the four to omit is the last one: after fouling, the heat transfer coefficient decreases, and to maintain the evaporation rate the temperature rise must be increased, so energy consumption naturally goes up. When a manufacturer says "fouling can increase energy consumption by 10%~30%", it refers to the same machine under the same load.

V. Evaporation Temperature: Low Temperature Does Not Save Power, It Saves Something Else

The industry often hears "low-temperature evaporation saves power", but for MVR this is exactly the opposite. See Table 1: the latent heat at 60 ℃ is 655 kWh/t, which is 4.4% higher than the 627 at 100 ℃ — for the same water volume, low temperature requires moving 4.4% more heat.

What is more expensive is the compression ratio. For the same lift of 3 K, at 100 ℃ the pressure goes from 101.3 to 112.8 kPa, giving a compression ratio of 1.116; at 60 ℃ it goes from 19.9 to 25.0 kPa, giving a compression ratio of 1.147. The absolute pressure difference is much smaller, but the relative compression ratio is larger, so the isentropic work is also larger. Substituting BPE 8.8 K: evaporating saturated brine at 60 ℃ requires 31.5 kWh/t, while at 100 ℃ it only requires 26.9. Low temperature is 17% more expensive.

Table 6 Effect of Evaporation Temperature on Two Units (Same 10 t/h Evaporation Rate)
Evaporation TemperatureSaturation Pressure kPaSpecific Volume of Steam m³/kgCompressor Suction Volume m³/hRelative 60 ℃
60 ℃19.97.67176 7101.00
70 ℃31.25.04550 4500.66
80 ℃47.33.40734 0700.44
90 ℃70.12.36123 6100.31
100 ℃101.31.69416 9400.22

But low temperature does have its benefits, just not on the electricity meter: slower scaling, less corrosion, no decomposition of heat-sensitive materials, and the ability to utilize low-grade waste heat. What really determines the evaporation temperature comes down to three things—at what temperature the salts precipitate, at what temperature the feed liquid degrades, and at what temperature the compressor's volumetric flow rate remains acceptable. The last column of Table 6 addresses the third: at 60 ℃ evaporating 10 t/h, the compressor must draw 7.7 万 cubic meters of steam per hour, and this volumetric flow rate determines how large and how expensive the machine must be.

Therefore, the engineering operating point usually falls within 70~95 ℃: higher than deep-vacuum MED and lower than normal pressure, which reduces the specific volume while leaving margin for scaling and materials.

Criterion 4: What "low-temperature evaporation" sells is no scaling, not power savings. Whenever you see the claim "lower temperature means more energy efficient," first ask whether it is comparing latent heat, compression ratio, or compressor volumetric flow rate—the three do not point in the same direction. The real order of power savings is: reduce BPE (pretreatment desalination) > choose the right temperature rise (just enough) > raise evaporation temperature (shrink volume) > recover waste heat from condensate.

VI. Triple-effect and MVR: primary energy differs by 5.8 times, but cost differs by only 4 times

Convert the two routes to the same unit, and the accounting becomes clear. Use the equivalent value 0.1229 kgce/kWh to convert electricity into standard coal, and 94.3 kgce/t to convert steam into standard coal:

Table 7 Energy Consumption and Cost of Five Evaporation Routes (per ton of water, steam 200 元/t, electricity 0.6 元/kWh)
RouteSteam t/tElectricity kWh/tPrimary Energy kgce/tOperating Cost CNY/tPrimary Energy Ratio (vs. MVR)
Single-effect1.10~1.30—113.2220~26017.4 times
Double-effect0.55~0.65—56.6110~1308.7 times
Triple-effect0.37~0.468~1837.779~1035.8 times
Quadruple-effect0.25~0.3510~2026.456~824.1 times
MVR0.02~0.0525~456.515~271

The primary energy difference is 5.8 times (triple-effect 37.7 vs. MVR 6.5), while the cost difference is only 4.4 times (80 元 vs. 18 元). The gap in between is the steam-to-electricity price ratio: here steam is assumed at 200 元/t and electricity at 0.6 元/kWh, a ratio of 333 times; yet the energy consumption ratio is only 5.8 times, so MVR wins.

To ask the reverse question: how low must the steam price be for triple-effect to catch up? Write the per-ton-water costs of the two routes as an equation, and solving it gives a very useful number:

Steam price break-even point = Electricity price × (MVR power consumption ÷ Triple-effect steam consumption)

Substituting 30 kWh and 0.40 t gives 75 times. That is, when the steam price is higher than 75 times the electricity price, MVR is cost-effective; with an electricity price of 0.6 元, then if the steam price is higher than 45 元/t, MVR should be chosen. The "92.5 times" circulating in the industry is also this formula, except it substitutes 25 kWh and 0.27 t (92.6). The same statement with two numbers differs in the two energy consumption values substituted in—so the break-even point is not a constant; it is what your own two numbers divide out to.

There are two more accounts to calculate together: MVR's investment is 30%~60% higher than triple-effect (the compressor is the biggest part), and the payback period is usually 2~4 年; while triple-effect remains irreplaceable in plants with "free or low-priced waste heat steam"—at that time the steam price may be 50 元/t, or even lower, and the break-even point is directly shattered.

Criterion Five: When choosing multiple-effect or MVR, the first question is not energy consumption, but "does the plant have more waste heat steam than it can use." If yes, multiple-effect; if no, MVR. The second question is the steam-to-electricity price ratio, and the calculation method is the division above. Whenever you see "MVR is always more economical than multiple-effect," first ask what the steam price is.

Seven, Crystallization: Sodium Chloride Can Only Be Evaporated

After evaporation to saturation, continued evaporation precipitates salt. To make the salt precipitate out, there are two routes: evaporate off the water (evaporative crystallization), or lower the temperature (cooling crystallization). Which route to take is determined by the solubility curve, not by process preference.

Table 8 Solubility of Two Salts (g / 100 g water, calculated as anhydrous salt)
TemperatureNaClNa₂SO₄
0 ℃35.74.9
10 ℃35.89.0
20 ℃35.919.5
30 ℃36.340.8
32.4 ℃36.349.7 (turning point)
40 ℃36.448.8
60 ℃37.345.3
80 ℃38.443.7
100 ℃39.242.7

The NaCl column is almost flat: 20 ℃ 35.9, 100 ℃ 39.2; over a temperature difference of eighty degrees, only 3.3 g more dissolves. Converted to mass fraction, that is 26.42% to 28.16%, a difference of only 1.74 percentage points.

This means cooling crystallization is essentially ineffective for sodium chloride. Cooling 100 ℃ saturated brine to 20 ℃, only 3.3 g of salt can precipitate per 100 g of water, accounting for 8.4% of the dissolved salt. The remaining 91.6% still has to be evaporated. Therefore, the crystallization stage for sodium chloride must be evaporative crystallization—MVR or forced circulation multiple-effect—and the cooling stage is only used to recover sensible heat and cool the feed liquid, with no expectation of salt production.

Fact check: The common online claim that "sodium chloride can be crystallized by cooling" conflates two things. Sodium chloride can indeed be crystallized by cooling, but the yield is extremely low (8.4%), making it unfeasible in engineering; what is truly crystallized by cooling are salts with a large solubility temperature coefficient, such as sodium sulfate, sodium nitrate, and sodium carbonate. The criterion is ΔS/ΔT, not the absolute value of S—sodium chloride has a very high solubility (36 g), but its ΔS/ΔT is nearly zero.

VIII. Sodium sulfate can be frozen: the bend at 32.4 ℃

The shape of the sodium sulfate column is completely different. 0 ℃ is only 4.9, 20 ℃ 19.5, 32.4 ℃ surges to 49.7, and then drops again—100 ℃ is only 42.7. This "less soluble as it gets hotter" segment is the physical basis of all salt separation processes.

The reason lies in the hydration form. Below 32.4 ℃, the solid phase in equilibrium with the solution is mirabilite decahydrate (Na₂SO₄·10H₂O), whose solubility rises sharply with increasing temperature; above 32.4 ℃, it becomes anhydrous sodium sulfate, and the solubility instead decreases with increasing temperature. This turning point is called the transition temperature, and its existence gives sodium sulfate two crystallization routes:

  • Freeze crystallization of mirabilite: Cool the feed liquid to 5~10 ℃ to precipitate mirabilite decahydrate. Cooling from 42.7 at 100 ℃ to 5.5 at 5 ℃ precipitates 37.2 g/100 g water, accounting for 87.1% of the dissolved salt.
  • Thermal crystallization of mirabilite: Heat the feed liquid to 90~120 ℃, where the solubility of anhydrous sodium sulfate drops to the 30~42 range, and mirabilite precipitates first. Suitable for feed liquids with a sodium sulfate content of 8%~25%.

In the same table, 8.4% and 87.1% differ by a factor of ten. This is why in salt separation projects, the word "freeze" belongs only to sodium sulfate, not to sodium chloride.

Solubility curves of sodium chloride and sodium sulfate
Figure 2 Two personalities on the same horizontal axis. Sodium chloride is nearly horizontal; cooling by 80 K precipitates only 8.4%; sodium sulfate bends at 32.4 ℃, and cooling to 5 ℃ can precipitate 87.1%. In the anhydrous salt region to the right of the turning point, heating can also force out the mirabilite, which is the basis for thermal crystallization of mirabilite.

The cost of freezing must be calculated clearly. Each ton of mirabilite carries away 250~330 MJ of crystallization latent heat and sensible heat, equivalent to 69~92 kWh. Producing 3.4 t of mirabilite per day means 235~313 kWh/d of cooling capacity, and since the COP of the refrigeration unit is only about 3, the power consumption must be multiplied by three. This electricity cost is often omitted from project proposals because it is not in the "evaporation" column.

IX. Mirabilite removes 1.27 tons of water

This is the most easily miscalculated account in salt separation projects. The molecular weight of mirabilite decahydrate is 322.19, of which anhydrous sodium sulfate is 142.04 and crystallization water is 180.15. Therefore:

1 t Na₂SO₄ → 2.268 t Na₂SO₄·10H₂O, carrying away 1.268 t crystallization water

55.9% of mirabilite is water. You evaporate the water and separate out the salt, and the salt brings the water back in the form of a hydrate—this water returns to the front end and must be evaporated again. It does not violate conservation, but it is a circulating load, and the circulating load directly determines the scale of the evaporator.

Add the washing water. The crystallized salt entrains mother liquor and must be washed with 0.5~1 times the salt amount of water to stably reach product purity. This washing water is saturated brine, and returning it to the front end means bringing the salt back as well. Adding the two together:

Salt separation route and material balance
Figure 3 Material flow of a typical salt separation route. The calculation example uses feed water 100 m³/d, NaCl 30 g/L and Na₂SO₄ 15 g/L. The circulating water (crystal water 1.90 t/d plus washing water 2.3~4.5 t/d) is 0.9~1.4 times the salt production, and this load must be reserved in the evaporation capacity.
Criterion Six: When performing the material balance for salt separation, "crystal water" must be listed as a return stream rather than treated as part of the product. Any scheme that calculates yield only as "feed salt ÷ salt output" omits this stream. Likewise, washing water is not a "loss" but a return stream carrying salt—it increases both water volume and salt load.

X. Three Routes for Salt Separation and One Mixed-Salt Rate

In industry, mixed salts are separated through a combination of three means:

  1. Nanofiltration Separation First.The Nanofiltration / NF membrane has a high rejection rate for divalent ions (sulfate) and almost no rejection for monovalent ions (chloride), so one stream of water is split into two streams: "chloride-rich" and "sulfate-rich." The rejection rates given in the disclosed embodiment are sulfate 95%, chloride 10%, and nitrate 25%. After separation, the Cl:SO₄ ratio of the NF permeate is approximately 10.4:1, and that of the concentrate is approximately 1:2.2.
  2. Freeze Crystallization for Mirabilite.The sulfate-rich stream is cooled to 5~10 ℃ to precipitate sodium sulfate decahydrate (mirabilite), with purity easily achieving above 97%; the crystals are coarse and easy to separate.
  3. Evaporative Crystallization.The chloride-rich stream enters an MVR or multi-effect system, where vacuum, temperature, and residence time are controlled according to the phase diagram to crystallize sodium chloride.
Table 9 Salt product structure of a disclosed embodiment (only the ratio is taken, not the absolute quantity)
Productt/dProportionDestination
Sodium chloride8.3953.7%Chlor-alkali raw material
Sodium sulfate5.6236.0%Detergents, glass, sodium sulfide
Sodium nitrate1.388.8%Sold externally as industrial-grade product
Mixed salt0.231.5%Disposed of as solid waste
Fact check:The two feed streams given in this embodiment are 2.45 and 1.31 m³/h, with TDS 105 000 and 163 667 mg/L. Converted on this basis, the daily salt input is approximately 11.3 t, while the total salt output is 15.62 t/d—the input and output do not close (difference 38%). Therefore, this article only takes its salt-type ratio and the mixed-salt rate of 1.5% as reference, and does not cite the absolute quantities. Such inconsistencies are not uncommon in patent texts, and a multiplication check must be performed before citing them.

The order is not a matter of habit; it is a matter of where the composition falls on the phase diagram. First, look at which region the water falls into: for water with excess sulfate and insufficient sodium, sodium sulfate crystallizes first once evaporation reaches a certain point; for water where chloride ions are absolutely dominant and sulfate is only 1%~3%, sodium chloride crystallizes first, followed by sulfate on further concentration. Different landing points mean two entirely different routes. The entry point for judgment is three ratios—the molar ratio of Cl⁻ to SO₄²⁻, whether Na⁺ is in excess, and whether potassium is present.

The consequence of getting the order wrong is not "low efficiency" but "ruined salt": what should be frozen first goes to evaporation instead, sodium sulfate crystallizes out together with sodium chloride and mixes into the salt, purity drops from 99% to below 95%, and it cannot be washed back—it is a eutectic, not entrainment.

A mixed-salt rate of 1.5% is a very good level. What is more common in reality is another order of magnitude: an industrial park produces 25 t of mixed salt per day, composed of sodium chloride 62%, sodium sulfate 33%, calcium, magnesium and organics 5%, with outsourced disposal at 800 元/t—730 万 yuan per year. This is why the true KPI of a salt separation project is not "salt purity" but "mixed-salt rate": purity can be forced up by washing, but if the mixed-salt rate cannot be brought down, money keeps flowing out.

Criterion Seven: When evaluating a salt separation scheme, ask about the mixed-salt rate first, then purity. The mixed-salt rate is determined by the phase diagram landing point and mother liquor circulation; purity is determined by washing and centrifugation; the former is a design issue, the latter an operational one. Schemes that state only purity and not the mixed-salt rate usually leave the hard problem to operations.

XI. By-product Salt: 4.2 Points Difference Between Dry and Wet, 5-fold Difference in TOC

Once the salt is out, it still has to be sellable. Here there are two conventions, both more error-prone than crystallization itself.

The first: dry salt versus wet salt. GB/T 5462 gives two columns of specifications for refined industrial salt—dry salt calculated on a dry basis, wet salt calculated on the moisture-containing product. For the same batch of salt, 97.5% on a dry basis is Grade 2 qualified, while on a wet basis it is 93.3%—a difference of 4.2 percentage points, and the moisture limit happens to be exactly 4.00%.

Table 10 GB/T 5462—2015 Dry and Wet Columns for Refined Industrial Salt (NaCl and Moisture, %)
GradeDry Salt NaClWet Salt NaClDifferenceMoisture Limit
Premium Grade99.196.03.10.30 (dry) / 3.00 (wet)
First Grade98.595.03.50.50 (dry) / 3.50 (wet)
Second Grade97.593.34.20.80 (dry) / 4.00 (wet)

97.5 multiplied by 0.96 gives 93.6, which differs from 93.3 by only 0.3—this 0.3 difference is water-insoluble matter and calcium and magnesium. In other words, the difference between the dry and wet columns is almost purely a moisture account. On the same test report, reporting as qualified on a dry basis and reporting as unqualified on a wet basis are both correct statements.

Second criterion: TOC. Meeting the main content specification is only the entry ticket. For the same sodium chloride by-product salt, the coal chemical industry group standard T/CCT002 sets TOC at 40 (mg/L), while the reclaimed industrial salt group standard T/ZGZS0302 sets it at 8, a 5-fold difference; the latter also adds a whole set of requirements: pH 6~9, ammonia nitrogen ≤1, total phosphorus ≤0.2, fluoride ≤1, cyanide ≤0.2, volatile phenols ≤0.005, and petroleum hydrocarbons ≤0.05.

Table 11 Comparison of the same batch of indicators across three standards (same main content, organics differ by 5 times)
IndicatorGB/T 5462 (Dry Salt Grade II)T/CCT002—2019T/ZGZS0302—2023
NaCl≥97.5%≥97.5%≥97.5%
Moisture≤0.80%≤0.80%≤0.80%
Water-insoluble matter≤0.20%≤0.20%≤0.20%
Total calcium and magnesium≤0.60%≤0.60%≤0.60%
Sulfate≤0.90%≤0.90%≤0.90%
TOCNot specified≤40≤8
Other—Whiteness ≥67pH 6~9, ammonia nitrogen ≤1, total phosphorus ≤0.2, etc., 9 items

Why is organic matter so critical? Because chlor-alkali plants use ion-exchange membrane electrolysis, and organic matter in the brine generates chloroform during electrolysis and also fouls the membrane. So whether by-product salt can enter the chlor-alkali process is not determined by main content but by TOC. What level do the best performers achieve? The product of a 6 万 t/a waste salt fractionation unit is NaCl ≥99.1%, TOC ≤10 mg/kg, whiteness ≥88%, sodium sulfate ≥99.0%—already superior to premium-grade dry salt.

Fact check: The TOC units in the table above need to be unified. Salt is a solid, so the reasonable unit for TOC is mg/kg; whereas the group standard states mg·L⁻¹, which is a solution basis. 40 mg/L and 40 mg/kg differ by one density (about 1.2) in saturated brine, which is not large, but the basis should be stated when reporting figures. Also note: meeting purity specifications does not mean it can be disposed of as general solid waste. When conducting leaching tests per GB 5085.3, exceeding the limit on even one item makes it hazardous waste; a main content of 99% will not save it. Purity and compliance are two separate accounts.

Twelve: The Five Parameters of the Crystallizer and a Selection Checklist

The crystallization stage is the section most prone to clogging, fine crystals, and purity degradation in the entire evaporation process. Five parameters are worth remembering:

Table 12 Main Control Parameters of the Crystallizer and Product
ParameterTypical RangeSymptom After Loss of Control
Slurry Density15%~30% (w/w)Too low: crystals cannot grow; too high: poor flowability, pump and pipe blockage
Circulation Ratio20~80Too low: local supersaturation and scaling; too high: secondary nucleation and excessive fine crystals
SupersaturationControlled within the metastable zone widthExceeding it causes explosive nucleation, particle size D50 drops to tens of microns, and solids escape with the centrifuge effluent
Product Purity97%~99%Mother liquor entrainment, insufficient washing
Moisture Content of Wet Salt3%~5%Insufficient centrifugation and drying, directly lowering the wet-basis grade (see Section 11)

Particle size D50 typically falls within 100~500 μm. This value is not the larger the better: if too fine, solids escape with the centrifuge effluent and are entrained during drying; if too coarse, the fluidized bed drying time is insufficient. It must match the subsequent centrifugation, drying, and reuse scenarios, and is not a standalone performance indicator.

Compress the whole text into one checklist; ask in order when selecting a system:

  1. How much water must be evaporated? Calculate by mass balance, and add the two return streams of crystal water and wash water (Section 9).
  2. What is the BPE at the final-state concentration? It must be measured or looked up from the Dühring line; do not use the average concentration, and do not substitute clean water (Section 2).
  3. Design temperature rise = BPE + terminal difference 2~3 K + margin; multiply by 2.3 kWh/(t·K) to obtain the order of magnitude of specific power consumption (Section 3).
  4. Can the compressor type deliver this temperature rise? (Table 4)
  5. Where should the evaporation temperature be set? Consider the salt precipitation temperature, the heat sensitivity of the feed liquid, and the machine size brought by the specific volume of steam (Sections 5 and 6).
  6. Is there waste-heat steam? If yes, use multiple effect; if no, use MVR, then calculate the steam-electricity balance point 75 times (Section 6).
  7. Is salt separation required? First look at ΔS/ΔT: what can be frozen is frozen; what cannot be frozen can only be evaporated (Sections 7 and 8).
  8. Is the salt separation route "Nanofiltration—Freezing—Evaporation" or "Evaporation—Freezing"? Determine the order according to the phase-diagram landing point (Section 10).
  9. How should the crystal slurry density, circulation ratio, and supersaturation of the crystallizer be controlled? (Table 12)
  10. Who is the salt sold to? Work backward from the buyer's TOC threshold to set internal control indicators, and conduct leaching tests for each batch (Section 11).

13. Conclusion

1. The savings of MVR are not due to high efficiency, but because it buys something different. It does not buy the latent heat at 627 degrees; it only buys a temperature rise of a dozen or so degrees; the temperature rise is priced per K, and 1 K is about 2.3 kWh/t. This sentence translates "why MVR saves" into "how much MVR saves depends on the salt."

2. A large part of the temperature-rise budget is taken first by the salt. Saturated brine 8.8 K, plus terminal difference 3 K, is 11.8 K, equivalent to 26.9 kWh/t; while clean water requires only 7.0. When the same machine evaporates brine, 80% of the electricity cost is paid for the salt. Therefore, the first variable of energy consumption is not water quantity, but the final-state BPE.

3. The four numbers of specific power consumption (7, 16.8, 35, 40~55) are not in conflict; they are four levels of scope. Ideal work, simulated value, whole-machine measured value, and quotation including margin—each added layer of reality raises it a notch. Before comparing, ask four things first: evaporation temperature, temperature rise, whether auxiliary equipment is included, and whether fouling margin is included.

4. In the crystallization stage, physics has more say than process. The solubility curve of sodium chloride is almost flat; cooling can precipitate only 8.4%, so it can only be evaporated; sodium sulfate turns at 32.4 ℃, and cooling to 5 ℃ can precipitate 87.1%, so it can be frozen. Mirabilite, however, will carry 1.27 tons of water back to the front end, and this circulating load must be written into the evaporation capacity.

5. Salt coming out does not mean the job is done. Dry salt 97.5 and wet salt 93.3 differ by 4.2 points; TOC 40 and 8 differ by 5 times; passing purity does not mean passing leaching. The true KPIs of a salt separation project are mixed-salt rate and TOC, not purity.

References

  1. GB/T 5462—2015 "Industrial Salt". Two grades of refined industrial salt: dry salt and wet salt indicators.
  2. GB/T 6009—2014 "Anhydrous Sodium Sulfate for Industrial Use".
  3. T/CCT002—2019 "Industrial Sodium Chloride as By-product of Coal Chemical Industry"; T/CCT001—2019 "Industrial Sodium Sulfate as By-product of Coal Chemical Industry".
  4. T/ZGZS0302—2023 "Reclaimed Industrial Salt — Sodium Chloride"; T/ZGZS0303—2023 "Reclaimed Industrial Salt — Sodium Sulfate".
  5. Analysis of the Current Status of Waste Salt Treatment and Resource Utilization in Coal Chemical Industry. Chinese Journal of Environmental Engineering, 2025. Table 4 "Comparison Table of Standard Control Indicators for Universal Reclaimed Industrial Salt".
  6. Ai S, Wang B, Li X, Shi W. Numerical analysis on the performance of mechanical vapor recompression system for strong sodium chloride solution enrichment. Applied Thermal Engineering, 2018, 137: 386-394. (16.8 kWh/t; concentration +1% → power consumption +8.2%, COP −2.7%)
  7. Analysis on Performance of Screw Compressor in MVR System. IOP Conf. Ser.: Mater. Sci. Eng., 2019, 604: 012002. (Condensing temperature 100~112 ℃ corresponds to 10~40 kWh/t; relationship among rotational speed—temperature rise—evaporation capacity)
  8. The influence of operation parameters on concentration ratio of multi-effect evaporation system with mechanical vapor compression. Chemical Engineering Research and Design, 2024. (When total temperature difference >10 ℃, CR 1.2~2.5, SPC >15 kWh/t; combined effect of BPE and last-effect secondary steam temperature)
  9. Heat Balance Coupled Calculation and Compression Ratio Selection of MVR Evaporation System. Industry Technical Data. (Terminal temperature difference 2~3 K, design temperature rise formula, compression ratio 1.2~1.8)
  10. Analysis of Maximum Concentration Ratio of MVR Evaporation System and Engineering Practice of Saline Wastewater. Industry Technical Data. (NaCl 8~10 K, Na₂SO₄ 10~12 K, NH₄Cl 12~14 K, CaCl₂ 25~30 K; upper temperature rise limits of various models)
  11. Measured Energy-Saving Effect of MVR Evaporator. Industry Technical Data. (Power consumption composition: compressor 60%~70%, circulating pump 15%~20%, vacuum pump 5%~10%; temperature rise 10 ℃ corresponds to 40~55 kWh/t)
  12. Common Problems of MVR Evaporation System. Instrument Network. (Boiling point of saturated brine 108.8 ℃, BPE 8.8 K; MVR heat exchange area is 3~6 times that of single-effect)
  13. Application of Evaporative Crystallizer in Salt Recovery. Industry Technical Data. (Crystal slurry density 15%~30%, circulation ratio 20~80, purity 97%~98%, moisture content 3%~5%, D50 100~500 μm, washing water 0.5~1 times salt amount, Mirabilite carries away 1.27 t water)
  14. How to Separate Sodium Sulfate from Sodium Chloride: The Boundary Between Thermal Salt Separation and Freezing Mirabilite Precipitation. Industry Technical Data. (32.4 ℃ turning point, thermal method 90~120 ℃, freezing 5~10 ℃, 250~330 MJ/t Mirabilite)
  15. High-Salinity Wastewater Salt Separation Zero Liquid Discharge System. Chinese Patent (Examples: NaCl 8.39, Na₂SO₄ 5.62, NaNO₃ 1.38, mixed salt 0.23 t/d; Nanofiltration rejection 95%/10%/25%).
  16. Annual Disposal of 6 万 Tons Waste Salt Salt Separation Crystallization Project. Engineering Case Data. (NaCl ≥99.1%, TOC ≤10 mg/kg, whiteness ≥88%; Na₂SO₄ ≥99.0%)
  17. Energy Consumption Comparison Between Multi-Effect Evaporation and MVR. Industry Technical Data. (Triple-effect 0.37~0.46 t/t, quadruple-effect 0.25~0.35 t/t, single-effect 1.10~1.30 t/t; investment higher by 30%~60%, payback period 2~4 年)
  18. Mixed Salt Disposal Case in Chemical Industrial Park. Industry Technical Data. (Daily mixed salt production 25 t, NaCl 62%, Na₂SO₄ 33%, calcium magnesium and organic matter 5%, disposal cost 800 元/t)
All formulas in this article can be recalculated using the tables and formulas herein; values marked as first-hand standards are subject to the original standard text, and values marked as industry data are reference ranges. The three accompanying figures are locally drawn according to the formulas in this article, and are not actual photographs or generative images.