Circulating cooling water cycles of concentration: raised from 3 to 5, blowdown reduced by 59%, makeup water reduced by only 16.7% — the remaining 33% does not exist arithmetically.

Multiple industries nationwide (petrochemical/chemical/power/steel/data center)
5,000–10,000 m³/h circulating water volume (pilot to full-scale)

Circulating Cooling Water Cycles of Concentration: From 3 Cycles to 5 Cycles, Blowdown Down 59%, Makeup Water Down Only 16.7% — the Remaining 33% Does Not Exist Arithmetically

The cycles of concentration of circulating water are often treated as a knob that can be turned at will: when the water bill rises, turn it up two notches. But for the same 10 000 m³/h system, when N is raised from 3 to 5, the blowdown volume drops by 59.3%, while the makeup water volume drops by only 16.7%—because the 128 m³/h that evaporates is determined by the heat load, and not a single drop of it can be saved. This article uses the formulas from two national standards to work the account through to the end: N is not a knob; it is the first of three ceilings to be hit.

Gaowutong · Industrial Water Treatment Technology Series · For industry technical personnel · All data are annotated with public literature and standard sources

First, draw the boundary: The normative definition of the cycles of concentration N is the ratio of makeup water volume to (blowdown volume + windage loss volume) (GB/T 50050—2017, Article 3.1.11), not a degree of freedom for salt content. This definition contains no circulating water volume, no holding water volume, and no heat exchange area—N is a result calculated from three other quantities: evaporation E (determined by the heat load), windage loss W (determined by the drift eliminator), and blowdown B (determined by the salt outlet). Treating N as an independent variable to be adjusted is equivalent to treating the result as the cause.

I. First, set out the four quantities: one identity, two boundaries

A circulating water system has only four water paths, and all water volume issues are locked down by them:

SymbolMeaningFormula and Source of Values
EEvaporation LossE = K·Δt·R, where K is the evaporation loss coefficient (1/℃), ranging from 0.0008 to 0.0016 depending on the dry-bulb temperature of the incoming air to the tower
WWindage LossW = loss water rate × R, 0.10% with drift eliminator, 1.20% without drift eliminator (mechanical draft)
BBlowdownB = E/(N−1) − W, i.e., Clause 3.1.22 of GB/T 50102—2014
MMakeup WaterM = E + B + W, which upon combination yields M = E·N/(N−1)
NCycles of ConcentrationN = M/(B+W), equivalent to N = 1 + E/(B+W)
TAverage Retention TimeT = V/(B+W), where V is the system holdup water volume, preferably less than R/3

The most important row in this table is M. Substituting B = E/(N−1) − W into M = E + B + W, W is eliminated:

M = E·N/(N−1)

In other words, the make-up water volume is determined solely by the evaporation volume and the cycles of concentration, and is independent of wind drift loss, the system holding water volume, and the blowdown volume itself. This is not a coincidence for easy memorization; it directly determines all the conclusions that follow: the room for water savings exists only in the coefficient N/(N−1) of E, and this coefficient is always greater than 1. When N = 2, it is 2.00; when N = 3, it is 1.50; when N = 5, it is 1.25; and as N→∞, it approaches 1.00.

Rewriting the same identity gives the second boundary: from N = 1 + E/(B+W), when the blowdown volume B is reduced to 0, N reaches its maximum possible value Nmax = 1 + E/W. The cycles of concentration has an upper limit set solely by wind drift loss and independent of blowdown.

II. Running the numbers on the same system: blowdown cut by nearly 60%, make-up water reduced by only one-sixth

Take the common operating conditions of a medium-sized system: circulating water volume R = 10 000 m³/h, temperature difference across the tower Δt = 8 K, summer dry-bulb temperature at the tower inlet 40 ℃ corresponding to K = 0.0016, mechanical draft tower already equipped with drift eliminators, W = 0.1%. Thus E = 128 m³/h, W = 10 m³/h. Raising N from 2 to 12, the blowdown and make-up water are calculated step by step:

NBlowdown B (m³/h)Makeup Water M (m³/h)Makeup Water Rate M/RBlowdown Rate B/R
2118.00256.002.56%1.18%
354.00192.001.92%0.54%
432.67170.671.71%0.33%
522.00160.001.60%0.22%
615.60153.601.54%0.16%
88.29146.291.46%0.08%
104.22142.221.42%0.04%
121.64139.641.40%0.02%

From 3 times to 5 times, blowdown volume 54 → 22 m³/h, down 59.3%; makeup water volume 192 → 160 m³/h, down 16.7%. Based on 8 000 h of annual operation, both the annual water savings and the annual emission reduction are 25.6 万 m³. Both figures are correct and refer to the same thing; the difference lies in the denominator: the blowdown volume is the small remainder left after subtracting the rigid evaporation from the makeup water volume, and with a small base, the reduction rate is large; the makeup water volume includes 128 m³/h of evaporation, and with a large denominator, the reduction rate is small. The blowdown reduction rate is 3.6 times the makeup water reduction rate.

Relationship curves between cycles of concentration and make-up water volume and blowdown volume
Figure 1 As N increases, the two curves both trend downward, but the make-up water curve asymptotically approaches the gray line E=128, while the blowdown curve can drop all the way to zero. Over the same interval 3→5, blowdown decreases by 59.3%, and make-up water decreases by 16.7%. (Plotted according to the formulas in this article)

III. The lower limit of make-up water is E, so water savings have an arithmetic upper bound

In Table 1, for the expression M = E·N/(N−1), as N→∞, M→E. This is the physical lower limit of make-up water: as long as the system is dissipating heat, E must be evaporated, and not a single ton less. Therefore, for any system raised from a certain starting point N1, the proportion of make-up water that can be saved relative to the original make-up water volume has an upper bound (subtract M∞=E from M1=E·N1/(N1−1) and then divide):

Maximum water saving rate = 1/N1

Starting point N1Original Makeup M1 (m³/h)Makeup after raising to infinity (m³/h)Maximum water saving rate on a makeup basis
2256.00128.0050.0%
3192.00128.0033.3%
5160.00128.0020.0%
8146.29128.0012.5%
10142.22128.0010.0%

This table can immediately filter out a batch of promotional claims. For a plant operating long-term at around 3 times, the makeup water volume can physically be reduced by at most one third; even if the concentration ratio is raised to 8 times, 10 times, or even zero discharge, the makeup water can only be squeezed further into that 1/3. Whenever a water saving rate is reported above 50% while the starting point is 3 times, the denominator is definitely not the makeup water volume.

IV. Three Ways of Reporting the Same Retrofit: 59.3%, 16.7%, 96.4%

By presenting the discharge basis, the make-up water basis, and the low starting point together, it becomes clear how those ranges in the industry come about:

Same Retrofit ItemDischarge BasisMakeup Water BasisRemarks
N 3 → 5 (existing system, only chemical dosing change required)−59.3%−16.7%Annual water savings 25.6 万 m³
N 2 → 10 (including side-stream demineralization retrofit)−96.4%−44.4%The lower the starting point, the better the discharge basis looks
N 5 → 12 (electrochemical side-stream)−92.6%−12.7%When the starting point is high, makeup water can hardly be reduced

The Catalogue of Industrially Encouraged Water-Saving Processes, Technologies and Equipment (2025 年 Edition) lists electrochemical treatment of circulating water as a category for promotion and application, stating that it raises the concentration ratio to 5–12 times and can achieve a water-saving effect of 30%–80%. Comparing with the table above: if the basis is makeup water, then 5→12 is only 12.7%, and 2→10 is 44.4%; to reach 80%, two conditions must be met simultaneously: the starting point is around 2 times and the calculation is based on discharge volume. If the basis is discharge, then 30%–80% falls between 3→5 (59.3%) and 5→12 (92.6%), which is easy to achieve.

Criterion: When you see a water-saving rate, first ask one question: "Is the denominator the make-up water meter or the blowdown meter?" Make-up water volume can be read directly from the water bill, while blowdown volume mostly has no meter; yet it is precisely the metric without a meter that yields the best-looking numbers. For the same retrofit, blowdown drops by 59.3% and make-up water drops by 16.7%, and the annual water savings calculated on a make-up water basis is 25.6 万 m³ — only this last figure can be written into the contract.

V. That W in the blowdown formula: GB/T 50102 explicitly subtracts it

The phrase most often heard on site is "blowdown = evaporation ÷ (N−1)". This phrase omits one term. The original formula given in Clause 3.1.22 of the Code for Design of Industrial Circulating Water Cooling GB/T 50102—2014 is:

Qb = [Qe − (n−1)·Qw] / (n−1)

That is, B = E/(N−1) − W. The consequences of omitting W are not minor: if the blowdown valve is set according to the formula with the missing term, the actual cycles of concentration cannot reach the design value, and the higher the target, the greater the discrepancy.

Target NB Set by Leakage-Type Design (m³/h)Actual NMakeup Water (m³/h)Excess Makeup vs. Design Value
364.002.73202.00+5.2%
532.004.05170.00+6.2%
818.295.53156.29+6.8%

You want to run at 5 times, but it stabilizes at 4.05 times—nearly a full tier short. And the first reaction on site when judging that "N cannot be raised" is often to add more chemicals and drain a bit more water, but neither of these will make up for W.

The same trace can also be seen in industry materials. For a 5 000 m³/h system, evaporation loss is calculated as 1.5% 75 m³/h, and wind drift loss as 0.1% 5 m³/h. The same document states that "when K is 4, the blowdown volume is approximately 75÷3=25 m³/h." However, 25 is the result of omitting W: the true B should be 25−5=20 m³/h. If the valve is set according to B=25, the system actually runs at 105÷30=3.50 times, not 4 times; to reach 4 times, the blowdown must be reduced to 20. The same document had just stated earlier that the wind drift loss is 5 m³/h, but then dropped it when calculating blowdown.

Another type of summary table does the opposite, folding W into the blowdown volume. A water conservation document for a certain refining and chemical enterprise provides data for a 10 000 t/h system: N is raised from 3.0 to 5.0, makeup water 166 → 138 t/h (−16.9%), blowdown 56 → 28 t/h (−50%). The evaporation volume implied by this set of numbers is 166−56=110 t/h and 138−28=110 t/h, which are completely consistent across the two levels, indicating that W is recorded as zero (or merged into blowdown). If W=10 t/h is listed separately according to 0.1%, the two sets of numbers yield 2.52 and 3.63 times, neither of which matches the 3.0 and 5.0 in the table header. When reading this type of table, the first thing to do is confirm which column W is in.

VI. The Other Side of W: The Upper Limit of Cycles of Concentration Is 1+E/W

Table 3.1.21 of the Code for Design of Industrial Circulating Water Cooling GB/T 50102—2014 specifies the wind drift loss rate very rigidly: mechanical draft towers with drift eliminators 0.10%, without drift eliminators 1.20%; natural draft towers with drift eliminators 0.05%, without drift eliminators 0.80%. Whether there is a drift eliminator makes a difference of 12 times.

Substituting W into Nmax = 1 + E/W, for the same system with E=128 m³/h, the upper limit of cycles of concentration is independently locked by W:

Tower Type and ConfigurationW/RW (m³/h)Upper Limit of N (B→0)
Natural Draft Tower with Drift Eliminator0.05%526.6
Mechanical Draft Tower with Drift Eliminator0.10%1013.8
Mechanical Draft Tower with Partially Failed Drift Eliminator (calculated as 0.5%)0.50%503.56
Natural Draft Tower without Drift Eliminator0.80%802.60
Mechanical Draft Tower without Drift Eliminator1.20%1202.07
The Two Ceilings of Cycles of Concentration: Chemical Residence Time and Windage Loss Rate
Figure 2 Left: The upper limit of N rises linearly with the allowable residence time of the chemical (N=1+E·T/V); Right: The upper limit of N decreases with the reciprocal of the wind drift loss rate (N=1+E/W). The two constraints share the same form, one with T as the variable and the other with W as the variable. (Plotted according to the formulas in this paper)

The conclusion is somewhat counterintuitive: For a mechanical draft tower without drift eliminators (or with drift eliminators that are damaged, clogged, or removed), no matter how small the blowdown valve is closed, the cycles of concentration cannot reach 3. In this case, if operated at B=54 m³/h per Table 2, the actual cycles can only reach 1.74, the makeup water increases from 192 to 302 m³/h, an additional 57.3%. The symptom observed on site is "N never goes up, and the water bill stays high," and the usual remedy is to increase blowdown—but increasing blowdown only makes N even lower.

Criterion: When N cannot be raised, first check the order of two things—① whether the blowdown rate is already very small (B+W approaching the theoretical value of E/(N−1)); ② whether there is water drifting from the tower top, whether the ground around the tower is wet and slippery year-round, and whether the drift eliminator sheets are scaled or collapsed. Item ② is never a parameter in the regulations, but it alone can knock N down by a full notch. See the article 11-20 for a similar phenomenon: a limit value written into another document, looking exactly the same, and no one would cross-check it.

VII. E is not a constant either: the evaporation coefficient doubles with the dry-bulb temperature difference

K in E = K·Δt·R is not a single number of 0.16%/℃. Taking values according to the dry-bulb temperature at the tower inlet, K ranges from 0.0008 at −10 ℃ to 0.0016 at 40 ℃, exactly a factor of two. With the same blowdown valve opening (B=54 m³/h) and the same tower:

Inlet Dry-Bulb Temperature (℃)K (1/℃)E (m³/h)Makeup Water M (m³/h)Actual N at Same Valve Setting
−100.000864.0128.02.00
00.001080.0144.02.25
100.001296.0160.02.50
200.0014112.0176.02.75
300.0015120.0184.02.88
400.0016128.0192.03.00

Two consequences. First, the cycles of concentration will automatically drop in winter—not because water quality has improved, but because evaporation is lower and makeup water is lower, while the blowdown valve has not been adjusted. In winter, N drops from 3.00 to 2.00, and the overall salt concentration shifts downward: scaling risk decreases while corrosion risk increases (low alkalinity, low pH, and weak buffering capacity against dissolved salts). This is another type of risk, not "safer." Second, if the annual water balance is calculated using the summer K, it will be overestimated by more than 30%: if weighted by 3 months at 0.0016, 3 months at 0.0008, and 6 months at 0.0012, the annual average K = 0.0012, E = 96 m³/h; using 0.0016 to calculate the full year, the annual evaporation is overestimated by 0.0016/0.0012−1 = 33.3%, and the annual makeup water is overestimated by the same proportion. If the payback period of a water-saving retrofit is based on this figure, it will be underestimated by one third.

Also correct a more commonly misunderstood inference: raising the temperature difference saves pump energy, not water

The same sentence appears repeatedly in industry materials—"Increase the supply-return temperature difference of circulating water, raising the temperature difference to about 8 ℃." This statement is correct, but what it saves is not water. For a fixed heat load Q, the circulating water volume is inversely proportional to the temperature difference (R=Q/(c·ρ·Δt)), while evaporation is determined only by the heat load: substituting R in E=K·Δt·R, Δt cancels out, giving E=K·Q/(c·ρ)—evaporation is independent of the temperature difference. Therefore, make-up water M=E·N/(N−1) is also independent of the temperature difference.

So what does raising the temperature difference actually change? It only changes W: W=0.1%×R, with R dropping from 16 000 to 10 000, and W dropping from 16 to 10. To maintain the same N, B must be increased from 48 to 54—water shifts from the windage loss column to the blowdown column, make-up water is not reduced by a single ton (both are 192 m³/h), while the circulating water volume drops by 37.5%; what is saved is pump power consumption. Making this point clear is very useful: when someone reports "raising the temperature difference from 5 ℃ to 8 ℃" as a water-saving achievement, the water savings figure should be filled in as 0, and only the electricity savings figure can be substantiated.

VIII. The second ceiling: chemical residence time, N = 1 + E·T/V

Clause 3.2.1 of GB/T 50050—2017 is a mandatory design constraint: the design residence time of circulating cooling water in an open system shall not exceed the allowable residence time of the chemicals, T = V/(B+W); GB 50648—2011 likewise emphasizes this point and notes that the allowable residence time is usually provided by the chemical supplier. Combining T = V/(B+W) with N = 1 + E/(B+W), W and B cancel out together:

N = 1 + E·T/V

Taking the upper limit V=R/3=3 333 m³, E=128 m³/h from Clause 3.2.2 of GB/T 50050, the slope E/V=0.0384 1/h, thus N = 1 + 0.0384·T. This straight line directly translates "how long the chemicals can soak" into "how many cycles of concentration can be reached":

Allowable Retention Time T (h)Corresponding Upper Limit of NWhich Generation of Chemicals This Tier Corresponds To
502.92Polyphosphates (P−O−P bonds hydrolyze readily; the hydrolysis product is orthophosphate, which forms calcium phosphate scale with calcium that is more difficult to treat)
1004.84Organic phosphonates (HEDP, ATMP; C−P bonds are stable)
1506.76Organic phosphonate + polymer blend
2008.68Upper limit range of blended formulations
30012.52Nominal values for modern composite chemicals

This column explains how the "3 times" figure is derived.It is not calculated from scaling; it is calculated from 50 h: polyphosphates hydrolyze and lose effectiveness after soaking in the system for 50 h, and a conventional system with V/R=1/3 and E/R≈1.28% corresponds to N=1+0.0384×50=2.92. In other words, N≈3 is a physical constant of the phosphorus-based chemical era, not a water quality constant. The statement in industry literature that "the cycles of concentration for phosphorus-based water treatment are generally around 3; this 3 is actually intended to control the chemical retention time to no more than 50 h" refers to exactly this.

For the same system, the actual residence time according to Table 2 is: 52.1 h at N=3, 104.2 h at N=5, 182.3 h at N=8, and 286.5 h at N=12. Thus three things hold true simultaneously:

  • To stabilize at 5 times, the allowable residence time for the chemicals must be ≥105 h—organophosphonates and compounded formulations are sufficient, but polyphosphates are not. This corresponds exactly to GB/T 50050—2017 raising the design cycles of concentration from "around 3" to "not less than 5.0";
  • To achieve 8 times (water efficiency guidelines for the steel industry in some provinces have already proposed 8 times or more), the corresponding value is 182 h, and the chemicals must be selected according to the 200 h tier;
  • 12 times corresponds to 287 h, which is already at the upper limit of the nominal 300 h for modern composite chemicals—if pushed any higher, what gets stuck is not the salt, but the shelf life of the chemicals.
Criterion: Before raising N, calculate two numbers—① T=V/(B+W), obtained by back-calculating B from the target N; ② request from the chemical supplier the allowable residence time for that formulation (the national standard does not give a specific value; this item must be written into the supply contract, and it is precisely this item that is marked as [to be supplemented] in this article). Compare the two numbers, and whether N can be raised is determined. The manifestation of exceeding the residence time limit is not immediate scaling, but rather a gradual increase in the heat exchanger approach temperature difference after three months and a shortened acid cleaning cycle—by then the cause can no longer be identified.

There is also a design blind spot here that is hardest to discover during the operation phase. B appears in the denominators of both N and T, and acts in opposite directions: reducing B increases N and also increases T—the hand that wants to save water is simultaneously pushing the chemicals toward extended service beyond their limits. Therefore, for "wanting both high N and short T," the only variable that can be adjusted is V (holdup volume), not B. The V/R ratio of old systems is often 1:2 or even larger (Article 3.2.2 of GB/T 50050 requires it to preferably be less than 1/3). Taking V=5 000 m³, at N=5, T=5 000/32=156.3 h, which has already exceeded the allowable value for some organophosphonate formulations; to reduce it to 100 h, V must be lowered below 3 200 m³. The approach is to clear dead corners, reduce tank volume, and cut off branch pipes that have not flowed for a long time—none of these three things cost money, but they never appear in water-saving retrofit plans.

IX. The first ceiling: salt, N ≤ 1100/(calcium hardness + alkalinity)

Article 3.1.10 of GB/T 50050—2017 stipulates: when the sum of calcium hardness and total alkalinity in indirect open cooling and direct cooling systems is greater than 1 100 mg/L (calculated as CaCO3), or when the stability index RSI is less than 3.3, sulfuric acid should be added or softening treatment should be carried out. This limit gives the "sum"; dividing it by the sum value of the make-up water itself gives the maximum cycles to which this water can be concentrated:

Make-up Water Calcium Hardness (mg/L, as CaCO3)Make-up Water Total AlkalinitySum of the TwoUpper Limit of NTypical Water Source
605011010.00Soft water in southern China, some reservoir water
80601407.86Surface water in the middle and lower reaches of the Yangtze River
100801806.11Surface water of relatively good quality
1201002205.00Just enough for 5 times
1501202704.07High-hardness, high-alkalinity groundwater in North and Northwest China
2001503503.14Deep groundwater, some karst water

Chloride is the second constraint, usually not the first, but it can overtake at coastal and high-chloride make-up water locations: carbon steel and stainless steel equipment with water on the tube side is limited to 1 000 mg/L; stainless steel equipment with water on the shell side (wall temperature ≤70 ℃, outlet water <45 ℃) is limited to 700 mg/L; direct-cooled rolled steel laminar flow is even stricter at 300 mg/L. Based on make-up water Cl⁻ of 30 mg/L, the three tiers correspond to 33.3, 23.3, and 10.0 times respectively; if the make-up water Cl⁻ has already reached 80 mg/L, only 8.8 times remain for the 700 mg/L tier.

The minimum of the three ceilings is the true value of N. Taking the above North China makeup water as an example again: salinity gives 4.07, chemicals (tier 200 h) give 8.68, and a normally functioning drift eliminator gives 13.8—the shortest stave in the barrel is salinity. GB/T 50050—2017 states "should not be less than 5.0, and shall not be less than 3.0"—the gap between these two terms is exactly where this group of plants sits: they cannot achieve 5.0, but 3.0 is the bottom line. To truly reach 5 times, salinity must be addressed first—adding sulfuric acid to knock down alkalinity, or softening/desalinating the makeup water—rather than switching to a chemical supplier that excels at high cycles of concentration.

10. The Same Basin of Water, Four Measurement Methods, Four N Values

The definition of cycles of concentration depends on "a certain component that does not leave with the water volume," and which component is chosen changes the result. Let the true value N = 5.0, makeup water Cl⁻ 40 mg/L, makeup water conductivity 520 μS/cm, makeup water calcium hardness 120 mg/L:

Determination MethodReadingBack-calculated NDeviationSource of Deviation
Chloride ratio (baseline method)200 ÷ 40 mg/L5.000Cl⁻ does not precipitate or biodegrade; however, chlorine-based biocides introduce additional Cl⁻
Potassium ion ratio20 ÷ 4.0 mg/L5.000Not subject to chlorination interference; requires atomic absorption or ion chromatography
Conductivity ratio3 200 ÷ 520 μS/cm6.15+23.1%Acid addition and chemicals contribute approximately 600 μS/cm
Calcium hardness ratio552 ÷ 120 mg/L4.60−8.0%Calcium has precipitated 8%, reducing the numerator
Four methods measuring the same tank water yield different concentration factors
Figure 3 True value 5.0 (vertical line), chloride and potassium ion methods hit the mark, conductivity method reads high by 23%, calcium hardness method reads low by 8%. One low, one high, a difference of 1.55 times. (Plotted per the formula in this paper)

The conductivity method reading high has a clear chemical cause: adding sulfuric acid converts 2HCO3− into SO42−; by equivalent conductance, bicarbonate is about 44.5 and sulfate about 80 S·cm²/eq, so when the same amount of alkalinity is replaced, conductivity nearly doubles, while Cl⁻ does not change at all. Therefore in any system where acid or salt-containing chemicals are dosed, the conductivity ratio will inevitably read high, and the magnitude of the overestimation varies with the amount of acid dosed. Conversely, the calcium hardness method reads low because calcium has genuinely left the water—how much left is exactly part of the scaling amount, so this method cannot be used to determine N, but it can be used to estimate scaling.

Criteria: Do three things together—① track the conductivity trend daily (online, continuous); ② calibrate once a week with the Cl⁻ ratio, and if the deviation exceeds 10%, check the acid dose and chemical dose; ③ the two water samples must be taken from the same meter and the same time period. The most common field problem is that the circulating water sample is taken from the tower basin while the makeup water sample is copied from a lab sheet six months old—the resulting ratio is meaningless. As for "how many times it actually runs at," do not look at the number in the operating procedures—that is the design value, not the operating value.

XI. Chemical dosing is calculated by blowdown, not by makeup water

Chemicals travel with the water, and they leave via two streams: blowdown and windage (evaporation carries no chemicals). Therefore, at steady state, the chemical loss rate equals concentration multiplied by (B + W), and the dosing rate should equal this number. If the same target concentration is dosed based on makeup water volume M, the steady-state concentration in the system will become N times the target value:

NB+W(m³/h)Chemical Loss Based on Blowdown(40 mg/L,kg/h)Dosage Based on Makeup Water(kg/h)Ratio
364.02.567.683.0
532.01.286.405.0

Looking at this from the reverse perspective yields the second benefit of increasing the cycles of concentration: when N is raised from 3 to 5, the chemical dosage at the same target concentration is halved (2.56→1.28 kg/h), a reduction of 50%, three times the reduction in makeup water of 16.7%. This is also the arithmetic basis for the claim that "high-cycle operation dilutes chemical costs." But two points need attention: first, the concentration target itself must be raised along with N (calcium hardness, alkalinity, and Cl⁻ are concentrated simultaneously, and the maintenance concentration of corrosion and scale inhibitors in circulating water typically must be raised from 4~6 mg/L to 6~10 mg/L), so the "halving" is calculated against the same target, and the actual formulation must be re-standardized; second, the dosing method for biocides must be changed—once the residence time doubles, oxidizing biocides maintained by residual chlorine have already decayed to nothing at the end of the system, so shock dosing must be adopted or a slower-degrading product must be used instead.

XII. Three Sets of Figures in Real Projects

ScenarioScaleRetrofit ContentResultBasis Note
Circulating water system of a refining and chemical enterprise10 000 t/hN raised from 3.0 to 5.0 (chemical dosing and operation adjustment)Make-up water 166→138 t/h (−16.9%), blowdown 56→28 t/h (−50%), water saving rate 16.9%W in the table is recorded as 0; when reading, confirm which column W is in
Electrochemical side-stream treatment of circulating water in the coking industryNot disclosedN raised from 2.5 to 5–6, scaling ions precipitated at the cathodeRemoval rate of total hardness and other indicators above 20%, wastewater reduction 50%–60%, corrosion and scale inhibitors eliminated, biocide and algicide reduced by nearly 70%"Wastewater reduction" is on a blowdown basis, not a make-up water basis
A data center in ZhangjiakouNot disclosedElectrochemical treatment introducedWater recycling rate raised to above 85%, overall water consumption reduced by 25%, annual fresh water savings exceeding 16 万 tonsThe water consumption reduction includes changes in cooling methods, not attributable to N alone

Looking at the three sets of figures together, the differences in basis are immediately clear: the refining and chemical set reports 16.9% on a make-up water basis, the coking set reports 50%–60% on a blowdown basis, and the data center set reports 25% on a total water consumption basis. None of the three figures is false, but only the first set can be directly reconciled with the water bill. Policy pressure is real: the Implementation Plan for High-Quality Development of Water-Saving Equipment (2025–2030 年) lists raising the cycles of concentration of circulating cooling water as a key research direction, and the water efficiency guidelines for the steel industry in some provinces already explicitly require high cycles of concentration treatment to reach 8 cycles or more; the Catalogue of Industrially Encouraged Water-Saving Processes, Technologies and Equipment (2025 年 Edition) lists electrochemical treatment (current density about 30 A/m²) as a category for promotion and application. For the 8 cycles target, when applied to the North China make-up water case above, the first hurdle to overcome is the salt barrier of 4.07.

XIII. Before Raising N, Go Through These Six Items in This Order

No.ActionCriterion / Target Value
1Measure the true N, do not rely on the numbers in the procedureFor one week continuously, use the dual method of Cl⁻ and conductivity, taking Cl⁻ as the baseline; if the deviation between the two methods is >10%, first check acid dosing and chemical dosing
2Perform a full analysis of the make-up waterFour items: calcium hardness, total alkalinity, Cl⁻, and conductivity; calculate Nsalt=1100/(calcium hardness+alkalinity) and NCl=limit value/make-up water Cl⁻
3Calculate the water balanceE=K·Δt·R (K is taken as 0.0008~0.0016 according to the local dry-bulb temperature), W from the table, B=E/(N−1)−W, M=E·N/(N−1)
4Calculate the residence timeT=V/(B+W), compare with the residence time allowed by the chemicals; if insufficient, change the formulation or reduce V, not reduce B
5Check the drift eliminator and side-stream filtrationDrift eliminator intact (W=0.1%); side-stream filtration configured at 3%~5% of the circulation rate and backwashing normally; online conductivity interlocked with automatic blowdown
6Have the chemical supplier re-submit the formulation according to the target water qualityChange all three items together: concentration target, allowable residence time, and disinfection method; do not merely raise the cycles of concentration

XIV. Summary: Three Ceilings, One Table

CeilingFormulaValue in This CaseWhat to Change to Move It
SaltN ≤ 1100/(calcium hardness + alkalinity)4.07 (North China make-up water)Add sulfuric acid to reduce alkalinity, soften or demineralize make-up water
Chemical residence timeN ≤ 1+E·T/V4.84(100 h)/ 8.68(200 h)Switch to a long-residence-time formulation, reduce V, eliminate dead zones
Wind drift lossN ≤ 1+E/W13.8(0.1%)/ 2.07(1.2%)Keep drift eliminators intact, inspect and replace
Water balance arithmetic (water-saving ceiling)Water-saving rate ≤ 1/N133.3% (starting from 3 cycles)None—this is dictated by the rigidity of E

Of the four rows, the first three are "how many cycles can be achieved," and the fourth is "how much can be saved once achieved." Among the first three, whichever is smallest governs; the fourth cannot be changed by anyone. Looking at them separately makes most debates about cycles of concentration disappear: "Why can't we reach 5 cycles" is a matter of salt, chemicals, and drift eliminators; "why does reaching 5 cycles save only 16.7%" is a matter of arithmetic and has nothing to do with operational level.

References

  1. GB/T 50050—2017 "Code for Design of Industrial Circulating Cooling Water Treatment" Clause 3.1.5 (corrosion rate 0.075/0.005 mm/a, adhesion rate 15 mg/(cm²·month), fouling thermal resistance 3.44×10⁻⁴ m²·K/W, tube-side flow velocity >1.0 m/s, wall temperature ≤70 ℃), Clause 3.1.10 (calcium hardness + alkalinity >1100 mg/L or RSI<3.3), Clause 3.1.11 (design cycles of concentration should not be less than 5.0, and shall not be less than 3.0; N=Qm/(Qb+Qw)), Clause 3.1.12 (heterotrophic bacteria 1×10⁵ CFU/mL, slime 3 mL/m³), Clause 3.2.1 (retention time shall not exceed the allowable retention time of the chemicals), Clause 3.2.2 (water volume should be less than 1/3 of the circulating water flow rate).
  2. GB/T 50102—2014 "Code for Design of Industrial Circulating Water Cooling" Clause 3.1.21 table (wind drift loss water rate: mechanical draft with/without drift eliminator 0.10%/1.20%, natural draft 0.05%/0.80%) and Clause 3.1.22 (Qb=[Qe−(n−1)Qw]/(n−1)).
  3. GB 50648—2011 "Code for Design of Circulating Cooling Water System in Chemical Industry": the design retention time shall be less than the allowable retention time of the chemicals, which is usually provided by the chemical supplier.
  4. GB/T 31329—2025 Table 3 (circulating cooling water quality indicators: chloride ion tube-side ≤1000 mg/L, shell-side stainless steel ≤700 mg/L; biological slime 2.0/3.0 mL/m³).
  5. Petrochemical Equipment Management Network "Water Saving and Emission Reduction Technologies for Refining and Chemical Enterprises": 10 000 t/h system N 3.0→5.0, make-up water 166→138 t/h, blowdown 56→28 t/h, water saving rate 16.9%; circulating cooling water accounts for about 35% of the total water intake of refining and chemical enterprises.
  6. Longda Water Treatment "Why the Cycles of Concentration of Circulating Cooling Water Get Stuck at 3 Times and Cannot Go Higher": 10 000 m³/h, Δt 8 ℃, make-up and blowdown calculation table based on evaporation of 1.4% and wind drift of 0.1%; the water efficiency improvement guide for the steel industry in Henan requires more than 8 times.
  7. Environmental Protection Online "Water Saving Technologies for Circulating Cooling Water: Cycles of Concentration and Reuse Key Points": 5 000 m³/h system blowdown calculation example with E=75, W=5, K=4; side-stream filtration reuse; scale and corrosion inhibitors 30~50 mg/L.
  8. Bolaier Technology "When the Cycles of Concentration of Circulating Water Cannot Be Raised, the Problem Is Often Not the Chemicals": four common misjudgments (low hardness ratio, dosing based on make-up water, looking only at total hardness, ignoring side-stream filtration).
  9. Bolaier Technology "Why Higher Cycles of Concentration of Circulating Water Do Not Always Mean More Water Savings": the "should not be less than 5.0" in GB/T 50050 is a guiding value; conductivity is generally controlled within 4 000 μS/cm.
  10. China Energy Conservation Network "Relevant Technologies for Water Saving, Environmental Protection and Zero Liquid Discharge of Circulating Cooling Water": the cycles of concentration for phosphorus-based water treatment is about 3, which actually means controlling the chemical retention time not to exceed 50 h.
  11. "Field Guidance Significance of Average Chemical Retention Time": allowable retention times of three generations of chemicals (polyphosphate 50 h, organic phosphonates and polymers 100~200 h, modern composites below 300 h); calculation example of N=E·T/V+1.
  12. Bawofu Environmental Protection "What Is the Average Retention Time of Circulating Cooling Water in the System": definition of T=V/(B+D) and consequences of excessively long retention time.
  13. Toutiao "How to Monitor the Cycles of Concentration of Circulating Water": four methods using conductivity, Cl⁻, K⁺, Ca²⁺ and their respective sources of deviation.
  14. Qingdao Ruipute "How to Determine the Cycles of Concentration of Circulating Water for Plate Heat Exchangers": the three calculation methods should be consistent; E≈R·Δt·0.16%/℃, B=E/(K−1), M=E·K/(K−1).
  15. Steel Pipe Power "Circulating Cooling Water for Cold Rolling and Pickling Gets More Concentrated the Longer It Is Used": retention time and V/R ratio; three levels of chloride ion 1000/700/300 mg/L; discharge criteria in GB 13456—2012 Table 2.
  16. "How Much Water Can Be Saved by Raising the Cycles of Concentration from 3 to 5 Times": water balance calculation of B=E/(K−1); Item 11 of the "Catalogue of Industrial Water-Saving Processes, Technologies and Equipment Encouraged by the State (2025 年 Edition)" (electrochemical 5~12 times, 30%~80%); coking measured N 2.5→5~6, wastewater reduction 50%~60%, biocide reduction 70%; Zhangjiakou data center water recycling rate 85%, water consumption reduced by 25%, annual fresh water saving of 16 万 tons.
  17. Huoqiu County "Environmental Impact Report Form for HDPE Pipe Granule Production Project (Phase I)": GB/T 50102—2014 comparison table of evaporation loss coefficient K and dry-bulb temperature at tower inlet (−10~40 ℃ corresponding to 0.0008~0.0016 1/℃).
  18. Cooling tower drift eliminator technical data: after installing drift eliminators, the wind drift loss rate decreases from 0.1%~0.3% to 0.005%~0.01%; wind drift loss water rate ≤0.1% for mechanical draft towers and ≤0.05% for fan-cylinder natural draft towers.

All derived figures in this article (Table 1~Table 6, Table 8~Table 11) are calculated item by item using public formulas under the same operating conditions, and the operating conditions and assumptions are stated below each table; the three figures were drawn locally according to the same set of formulas and are not generative images. The item marked [To Be Supplemented] in the text is the "allowable retention time" of each chemical formulation; the national standard does not provide specific values, so they must be obtained from the supplier.