News
News
News

[Mainland China] Ecological Environment Code Takes Effect: Wastewater Resource Recovery Enshrined in Law, Sludge Disposal and Sewer Network O&M Responsibilities Made Rigid for the First Time

Industry News
2026-10-26

Introduction: The "Ecological Environment Code of the People's Republic of China" was voted through by the Fourth Session of the 14th National People's Congress on 2026年3月12日 and takes effect on 2026年8月15日. The Code consists of 5 parts and 1242 articles, making it the second law in China named as a "Code" after the Civil Code, and the world's first code named after "ecological environment". The Environmental Protection Law and 10 other laws are repealed simultaneously. For the wastewater treatment industry, centralized urban sewage treatment, harmless sludge disposal, wastewater resource utilization, and pipeline network operation and maintenance responsibilities have, for the first time, received code-level systematic regulation.

I. Ten Laws in One: Legal Restructuring at the Highest Level for the Industry

The Ecological Environment Code is divided into five parts: General Provisions, Pollution Prevention and Control, Ecological Protection, Green and Low-Carbon Development, and Legal Liability and Supplementary Provisions. It integrates the former Environmental Protection Law, Water Pollution Prevention and Control Law, Atmospheric Pollution Prevention and Control Law, Solid Waste Pollution Prevention and Control Law, and 10 other laws, achieving a systematic restructuring of the "ten laws in one" legal framework in the ecological environment field.

For the water treatment, water supply and drainage, and pipeline network construction and operation and maintenance industries, this means that industry norms previously scattered across various individual laws have been integrated into unified code-level provisions. The industry's compliance baseline and responsibility requirements are thereby clearer, and long-standing industry pain points such as the funding sources for sludge disposal and ambiguous pipeline network operation and maintenance responsibilities have also received institutional responses in the Code.

II. Centralized Urban Sewage Treatment: Codification of Planning, Construction, Charging, and Effluent Responsibility

Articles 302 to 304 of the Code constitute the core provisions on urban sewage treatment, each directly relevant to industry practice.

  • Planning First — The housing and urban-rural development department of the State Council, together with relevant departments, formulates national plans for the construction of urban sewage treatment facilities; local people's governments at or above the county level organize the formulation of plans for their administrative regions, coordinating the construction of centralized sewage treatment facilities and supporting pipeline networks, and harmless sludge treatment and disposal facilities, and advancing rainwater and sewage separation according to local conditions — "rainwater and sewage separation" is no longer an advocacy requirement but a statutory duty of the government;
  • Paid Services and Dedicated Fees — Operating units provide paid sewage treatment services and collect sewage treatment fees in accordance with national regulations; the fees must be used for facility construction, operation, maintenance, and harmless sludge treatment and disposal, and may not be diverted to other uses;
  • Lifetime Responsibility for Effluent Quality — Water pollutants discharged to centralized sewage treatment facilities shall comply with discharge standards; operating units are responsible for effluent quality, and ecological environment authorities conduct supervision and inspection of effluent quality and quantity;
  • Full Traceability of Sludge — Operating units and harmless sludge treatment and disposal units must harmlessly treat and dispose of sludge, ensure that treated sludge complies with national standards, and track and record the flow direction, use, and quantity of sludge, reporting to the urban drainage authority and ecological environment authority; unauthorized dumping and stockpiling are prohibited.

A particularly critical institutional breakthrough is that sewage treatment fees must cover the cost of sludge treatment and disposal. This directly resolves the long-standing industry pain points of "insufficient funding and unclear responsibilities" in sludge disposal, and promotes synchronous planning and advancement of sludge disposal and sewage treatment.

III. Wastewater Resource Utilization Written into Law: Reclaimed Water Included in Unified Water Resource Allocation

The Code explicitly writes wastewater resource utilization into its provisions, requiring governments at or above the county level to coordinate the construction of wastewater resource utilization infrastructure, include unconventional water such as reclaimed water and harvested rainwater in unified water resource allocation, and promote sewage treatment and reuse.

This is the first time at the national level that the "second water source" status of reclaimed water has been confirmed in the form of a code. Combined with the arrangement in the previous revision of the "Regulations on Urban Drainage and Sewage Treatment" to "include reclaimed water in unified allocation", and the rigid constraints of the Ministry of Water Resources' "15th Five-Year Plan" water-saving targets, reclaimed water utilization has risen from the level of policy encouragement to a statutory obligation. For water-scarce regions, reclaimed water allocation projects for reclaimed water reuse in industrial parks, municipal miscellaneous uses, and ecological water supplementation will obtain more stable planning and funding basis under the framework of the Code.

IV. Discharge Outfalls and Pipeline Networks: Rigid Control Sets the Industry Baseline

The Code sets refined and rigid provisions for discharge outfalls into rivers and seas: in water function zones where water ecological environment quality does not meet standards, the establishment of new, modification, or expansion of river discharge outfalls shall be strictly controlled, except for livelihood projects; the establishment of new discharge outfalls for centralized urban sewage treatment facilities in key areas such as nature reserves and ecological protection red lines is prohibited; where conditions permit, deep-water setting and offshore discharge of sea discharge outfalls shall be promoted. The investigation and remediation of discharge outfalls has been incorporated into the statutory duties of the government.

In terms of the pipe network, the Code clarifies the supervision and management responsibilities of the competent urban drainage authorities and requires operation and maintenance units to fulfill their responsibilities for routine inspection, repair, and upkeep; where drainage facilities need to be demolished or altered due to construction projects, the construction unit must prepare a plan in advance, submit it to the competent authority for review, and bear all costs. Pipe network operation and maintenance has been incorporated into the ecological environment credit supervision system. Where inadequate operation and maintenance leads to sewage leakage and environmental pollution, the path of accountability is clear—the long-standing industry problems of "unclear pipe network responsibilities and weak supervision" now have a Code-level solution.

V. Impact on the Industry and the Reclaimed Water Reuse Market

After the Code takes effect, the industry will face three certain changes. First, the compliance baseline will be raised across the board—from the single dimension of "effluent meeting standards" to legally mandated responsibilities across the entire chain of "planning—construction—operation and maintenance—sludge—resource recovery," making the responsibility boundaries and assessment basis for operating units more rigid; second, sludge disposal will enter a proper payment track—once charges cover costs, the economic viability of sludge harmlessness and resource recovery projects will improve significantly; third, reclaimed water utilization will gain support at the highest level of legislation—the unified allocation of unconventional water is written into the Code, providing a unified superior-law basis for subsequent local legislation, pricing mechanisms, and facility investment.

For market entities whose main business is industrial wastewater treatment and water resource reuse, the Code is both a compliance red line and a market blueprint: engineering demand in the three major directions of sludge treatment and disposal, pipe network upgrading and renewal, and reclaimed water allocation and utilization will continue to be released in the coming years.


About TIANYI TECH: TIANYI LIMITED is an innovative company focused on industrial wastewater treatment and water resource reuse systems. Relying on AI platforms, the Internet of Things, and Digital Twin technologies, it provides three major product modules: "Industrial Wastewater Treatment AI Agent, Industrial Water Reuse Optimization System, and Industrial Water System Digital Twin." The company has delivered more than 120 industrial water treatment projects, treating 2.4亿 tons of industrial wastewater annually, with average per-ton water treatment costs reduced by 30% and an effluent compliance rate of 99.6%, committed to "making every drop of industrial wastewater valuable."

Source: Articles 302 to 304 of the "Ecological Environment Code of the People's Republic of China" (adopted on 2026年3月12日, effective on 8月15日), and publicly available legal popularization interpretations by local competent authorities. This article is compiled based on public information and is for industry exchange and reference only.

Copyright © 2026 TIANYI LIMITED All Rights Reserved