2026 年 10 月 22 日, industry media reported: a consortium formed by Beijing BHT Environmental Technology and UAE water company CWT has won the EPC turnkey contract for a sewage treatment plant in the Hamriyah area of Sharjah, covering the full process of design, procurement and construction, with BHT simultaneously providing equipment supply, construction management and O&M support. Previously, the Sharjah Public Works Authority had planned to build a new 2000 cubic meters/day sewage treatment plant in Hamriyah, and upgrade Kalba and Khor Fakkan, tripling the capacity of the Al Houma sewage treatment plant.
Contract Scope: EPC Turnkey + Full-Cycle Services
According to reports by industry media such as Newson Projects and Construction Business News ME on 2026 年 10 月 22 日, the project adopts the EPC turnkey model, with the scope of work covering design, procurement and construction. Leveraging its local team, BHT simultaneously provides technical delivery, equipment supply, project construction and O&M supporting services. At this stage, the contract amount, treatment capacity, project owner and start/completion dates have not yet been disclosed.
It is worth noting that BHT had previously won the Phase I upgrade and renovation project of the Kalba sewage treatment plant in Sharjah, continuously enriching its regional project pipeline. From single-point renovation to new-build EPC, the role of Chinese environmental enterprises in the Gulf water market is moving upward from "equipment supplier" to "engineering delivery and operations partner".
Why Sharjah: Closing the Gap in Sewage Infrastructure
Sharjah is accelerating efforts to close the gap in sewage infrastructure, and the Hamriyah area is welcoming the opportunity of a brand-new sewage treatment plant. Once completed, the project will improve Sharjah's sewage disposal system, enhance the regional environmental sanitation service level, coordinate urban and industrial wastewater treatment, and provide a foundation for the region's long-term sustainable development.
From public information, the pace of Sharjah's water infrastructure construction has not slowed: 2026 年 4 月, the Sharjah Public Works Authority stated that it plans to build a new 2000 cubic meters/day sewage treatment plant in Hamriyah and launch it before the end of 2026 年; at the same time, it is advancing the upgrade and renovation of Kalba and Khor Fakkan, and will triple the capacity of the Al Houma sewage treatment plant.
Industry Chain Opportunities: Pumps and Valves, Membranes, and Electrical Automation
With local urban and industrial expansion, the project will drive upstream and downstream procurement demand and unlock industry chain opportunities:
- Pumps and valves — basic demand in sewage lifting, recirculation and sludge conveyance; Gulf projects have high requirements for high-temperature resistance, salt-fog resistance and spare parts response.
- Membrane systems — MBR and reuse treatment routes have high penetration in Middle East reclaimed water scenarios; membrane modules and cleaning/O&M services are long-term revenue sources.
- Electrical and automation — the localization and adaptability of central control, instruments and online water quality monitoring directly affect acceptance and subsequent O&M contract renewals.
- Civil construction and prefabricated equipment — modular prefabricated sewage treatment plants can move a large amount of wet work to factories in advance, shortening the construction window pressure under the desert high-temperature environment.
Three Changes in Chinese Environmental Enterprises Going Global
- Model change — from pure supply to EPC, O&M and investment operations; customers place more value on the localized partner capability to "support installation, spare parts and after-sales".
- Track change — municipal sewage, industrial wastewater, reclaimed water reuse and sludge resource recovery are being released simultaneously; reclaimed water reuse has become rigid expenditure for water security in Gulf countries.
- Change in competitive factors — the weight of price is declining; delivery certainty, schedule risk and full-cycle cost control have become key bid evaluation factors, and digital intelligent O&M capabilities are beginning to enter technical scoring.
Risk Warning
Decision-making cycles of Gulf customers are generally lengthening; when project parameters are not fully disclosed, the investment scale and industry-driving effects still need continuous tracking and evaluation. Participants are advised to use "localized service network + certain delivery" as the entry point, and avoid entering the market with pure price competition.
TIANYI TECH (TIANYI LIMITED) focuses on AI governance for industrial water treatment, water resource reuse optimization and Digital Twin technology, providing products such as industrial wastewater treatment AI agents, industrial water reuse optimization systems, and water system Digital Twin platforms, and can provide digital support for intelligent control, energy efficiency optimization and remote O&M for overseas sewage and reclaimed water projects.
Sources: Newson Projects, Construction Business News ME (2026-10-22), and Chinese industry media such as Jiandao Network; contract amounts, treatment capacity, and other details are subject to the owner's official announcements.
Industry News
2026-10-29