News
News
News

[Mainland China] The Ministry of Housing and Urban-Rural Development has specified that during the 15th Five-Year Plan period, approximately 770,000 kilometers of urban underground pipeline networks will be constructed or upgraded: drainage pipeline netwo

Industry News
2026-11-05
The Ministry of Housing and Urban-Rural Development has made it clear: during the "15th Five-Year Plan" period, China will build and renovate about 77 万 kilometers of urban underground pipeline networks, of which drainage and sewage pipeline networks account for the largest share; "full life cycle" management has been written into the governance path, and four markets—pipeline network inspection, trenchless rehabilitation, leakage control, and pipeline network digitalization—will continue to scale up as provincial and district/county-level lists are rolled out successively.

77 万 kilometers: the overall plan for underground pipeline networks in the 15th Five-Year Plan is finalized

Chen Shaowang, spokesperson and vice minister of the Ministry of Housing and Urban-Rural Development, stated at the State Council Information Office's "Starting the 15th Five-Year Plan" series of themed press conferences that during the "15th Five-Year Plan" period, China will build and renovate about 77 万 kilometers of urban underground pipeline networks, accelerate efforts to shore up weak links in urban drainage and waterlogging prevention facilities, continue to advance the construction of urban lifeline safety projects, and continuously improve the ability to withstand disaster risks.

Urban underground pipeline networks mainly include gas, water supply, drainage, sewage, and heating pipelines and utility tunnels. They are the "blood vessels" and "nerves" of cities and an important component of the modern infrastructure network system. Within the 77 万-kilometer overall plan, drainage and sewage pipeline networks account for the largest share—this both echoes the final assessment of sewage collection quality and efficiency improvement at the end of the "14th Five-Year Plan" period and signals that the pipeline network market during the "15th Five-Year Plan" will unfold with higher standards and on a larger scale.

Four measures: build well, use long, manage effectively, implement solidly

To accomplish the task of urban underground pipeline network construction and renovation, the Ministry of Housing and Urban-Rural Development has defined four measures:

  • "Build well," focus on systematic advancement—strengthen the connection between water, gas, heating and other pipeline networks and utility tunnels, coordinate the construction layout, sequencing, and standards of different pipeline networks, and at the same time strengthen the linkage between urban underground pipeline networks and the other "five networks" to improve overall efficiency;
  • "Use long," focus on quality and safety—guide and urge local authorities to keep a close eye on all links of projects including planning, design, construction, and acceptance, strengthen quality and safety control throughout the entire process, and firmly assign responsibilities to all parties;
  • "Manage effectively," focus on long-term management—accelerate the improvement of supporting policy systems, management systems, and working mechanisms, make coordinated efforts in engineering construction, project supervision, departmental coordination, operation and maintenance, and other aspects, place equal emphasis on construction and management, and ensure the safe and orderly operation of underground pipeline networks throughout their full life cycle;
  • "Implement solidly," focus on overall coordination—pipeline networks involve many departments and entities and require all parties to work together. Housing and urban-rural development departments in all localities will strengthen regular communication and collaboration with relevant departments, ensure smooth connection and form synergy in areas such as factor guarantees and administrative approval.

"Full life cycle" enters the agenda: the logic of pipeline networks shifts from repair to operation

The most important signal from this press conference is that the "full life cycle" has been explicitly written into the governance path. This means that pipeline network construction will no longer end at "completion and delivery," but will be coordinated according to the complete cycle of "design life—handover—operation and maintenance—renewal": early-stage design must consider inspection accessibility and rehabilitation reservations, handover must include complete as-built surveying and mapping data, operation and maintenance must establish health records, and renewal must be arranged on a rolling basis according to life cycle.

For the industrial chain, four segmented markets will scale up accordingly:

  • Pipeline network inspection—CCTV inspection, sonar inspection, and in-pipe inspection robots, corresponding to the upstream links of "investigation—record creation—assessment";
  • Trenchless rehabilitation—CIPP ultraviolet curing, pipe bursting, close-fit lining, and other in-situ rehabilitation processes, reducing the interference of excavation with urban operations;
  • Leakage control—district metered areas (DMA), pressure management, and leakage warning, directly corresponding to "manage effectively";
  • Pipeline network digitalization—pipeline network GIS, Digital Twin, and the monitoring Internet of Things for urban lifeline safety projects, corresponding to the data foundation for the linkage of the "five networks."

Local lists are being rolled out successively: from provincial level to districts and counties

Under the national overall plan, local project lists have gradually emerged: the Hubei Province "15th Five-Year Plan" ecological and environmental protection plan proposes building and renovating more than 7000 kilometers of sewage pipeline networks across the province and advancing integrated plant-network projects in Wuhan, Shiyan, and Jingzhou; the implementation opinions of Anhui Province on the Beautiful Xin'an River require integrated construction and operation and maintenance of urban domestic sewage treatment plants and networks in river basin cities, with pilots launched by the end of 2026 年 and basically achieved by the end of 2028 年; the "15th Five-Year Plan" urban domestic sewage treatment and urban drainage and waterlogging prevention plan of Yongchuan District, Chongqing Municipality, launched public consultation in 11 月 3 日. The intensive public announcement of provincial, district, and county-level plans is a direct manifestation of the layer-by-layer decomposition of the 77 万-kilometer task.

  • Investment structure — The Ministry of Housing and Urban-Rural Development has made it clear to "coordinate the use of central and local funds, existing and incremental funds, and establish a sound diversified investment mechanism for the construction, operation and maintenance of underground pipeline networks." The combined financing of special bonds, ultra-long-term special government bonds and social capital will continue to expand;
  • Sequencing signal — "Strengthen the connection between water, gas and heat pipeline networks and utility tunnels, and coordinate construction layout, sequencing and standards" means that future road excavation will be coordinated under the "multi-network integration" approach, completing the renovation of multiple types of pipeline networks in one go, and packaged project bidding will become mainstream;
  • Assessment lever — The construction of urban lifeline safety projects continues to advance. The real-time monitoring coverage rate of high-risk pipeline sections such as gas and drainage will become an assessment indicator, and monitoring equipment and platform operation represent definite demand.

Three judgments for water and environmental protection enterprises

  • Drainage pipeline networks are the track with the highest certainty — Drainage accounts for the largest share of the 77 万 kilometers, and the assessment of sewage collection efficiency (BOD concentration, identification of low-concentration pipeline sections) has shifted from qualitative to quantitative, with inspection and detection orders leading the way;
  • "Equal emphasis on construction and management" benefits operation-oriented players — The promotion of the plant-network integration and pay-for-performance models turns pipeline network operation and maintenance from "emergency desilting" into "long-term service contracts," and enterprises with digital operation and maintenance capabilities will continue to benefit;
  • Regional market stratification is obvious — Provincial capitals and developed prefecture-level cities focus on renewal, renovation and smartization, while counties focus on addressing shortcomings and new construction. Equipment suppliers and engineering contractors can lay out their strategies accordingly.

The 77 万 kilometers are not an abstract number, but the largest systematic renewal of China's urban underground space in the next five years. Whoever can obtain the inspection reports, enter the operation and maintenance directory, and bind platform data will have secured the entry ticket to this market.


TIANYI TECH Co., Ltd. (TIANYI LIMITED) follows global water resource recycling and municipal pipeline network technology trends, providing information consulting and technology matching services in the fields of wastewater treatment and pipeline network operation and maintenance to industry clients.

Source: State Council Information Office "Starting the 15th Five-Year Plan" series of themed press conferences (2026-10-18) transcripts, Ministry of Housing and Urban-Rural Development public information, comprehensively compiled.

Copyright © 2026 TIANYI LIMITED All Rights Reserved