News
News
News

[Mainland China] MOHURD Initiates Partial Revision of the "Design Standard for Electroplating Wastewater Treatment": Public Comments Solicited from November 2 to December 5

Industry News
2026-11-08

Introduction: The General Office of the Ministry of Housing and Urban-Rural Development11 月 2 日 issued a notice to publicly solicit opinions on the national standard "Design Standard for Electroplating Wastewater Treatment (Partial Revision Draft for Comments)", with the deadline for feedback being 2026 年 12 月 5 日. Electroplating wastewater is one of the sub-sectors of domestic industrial wastewater with the strictest standards and the highest treatment difficulty. The partial revision of the design standard will directly affect the direction of upgrading and renovation of wastewater facilities in existing electroplating industrial parks.

I. Revision Initiated: From "Notice" to "12 月 5 日 Deadline"

According to the public consultation notice published on the official website of the Ministry of Housing and Urban-Rural Development on 11 月 2 日, the "Design Standard for Electroplating Wastewater Treatment (Partial Revision Draft for Comments)" was drafted by China Qiyuan Engineering Design and Research Institute Co., Ltd. and other units. This revision is included in the Ministry of Housing and Urban-Rural Development's engineering construction standard preparation work plan and constitutes a partial revision of the current national standard—that is, rather than starting from scratch, it provides targeted updates to relevant design provisions in response to process changes in the electroplating industry, tightening discharge requirements, and resource utilization needs in recent years.

The consultation has established dual channels of email and written mail, with the feedback deadline being 2026 年 12 月 5 日. In other words, industry enterprises, design institutes, and park operators have a window of approximately one month to directly incorporate frontline engineering experience in electroplating wastewater treatment into the national standard.

II. Why Electroplating Wastewater Warrants a Dedicated Standard

In the family of industrial wastewater, electroplating wastewater ranks among the highest in "difficulty coefficient":

  • Diverse heavy metal types and high toxicity—processes such as chromium plating, nickel plating, zinc plating, and copper plating respectively generate wastewater containing heavy metals such as hexavalent chromium, nickel, copper, and zinc. Hexavalent chromium is a strong carcinogen and must first be reduced (hexavalent chromium reduced to trivalent chromium) and then removed by precipitation.
  • High salinity and poor biodegradability—plating baths contain large amounts of sulfates, chlorides, and complexing agents. Chemical Oxygen Demand is not high, but salinity is high and biodegradability is poor, making conventional biological processes inadequate on their own.
  • Segregated collection is the lifeline—once chromium-containing, nickel-containing, and cyanide-containing wastewater are mixed and discharged together, chemical consumption and sludge volume increase exponentially. Therefore, the core design principle of electroplating wastewater treatment has always been "segregation by quality, treatment by category."
  • High reuse pressure—electroplating rinse water has high water quality requirements. Recycling and reuse of plating rinse water is both a water conservation requirement and a key to cost reduction. Many regions have already set mandatory targets for Reclaimed Water Reuse rates in electroplating industrial parks.

For these reasons, electroplating wastewater treatment design requires a dedicated national standard to unify technical requirements for process selection, structure design, sludge disposal, and reuse systems. Each time the design standard is updated, the "drawing baseline" for new projects and existing facility renovations is refreshed accordingly.

III. Industry Variables Behind the Revision

Since the current standard was issued, the landscape of the electroplating industry has undergone significant changes. First, centralized treatment in industrial parks has become mainstream: various regions are promoting the relocation of scattered electroplating enterprises into industrial parks, where professional electroplating parks centrally provide advanced treatment of wastewater after pretreatment by individual enterprises, greatly increasing the scale and process complexity of park-level wastewater treatment plants. Second, product process iteration: downstream industries such as PCB, new energy vehicle components, and hardware and sanitary ware have raised requirements for coating quality, driving updates in plating types and chemical bath systems, with consequent changes in wastewater quality. Third, tightening discharge and reuse requirements: special emission limits are being enforced in key river basins and key regions, and some areas require electroplating industrial parks to achieve specified effluent reuse rates.

The superposition of these three variables means that some design parameters, process boundaries, and reuse system provisions in the original standard need to be recalibrated—this is precisely the practical relevance of the "partial revision."

IV. Impact on the Industry Chain: Design Standards Are the "Starting Gun" for Upgrading and Renovation

  • Renovation demand for existing facilities becomes explicit — once the revised design standard takes effect, non-compliant old electroplating wastewater facilities will be required to be designed to the new standard at milestones such as reconstruction, expansion, and license renewal, turning renovation investment from "optional" into "a mandatory item on the drawings."
  • Equipment and material suppliers usher in standardization dividends — for segmented products such as heavy metal capture agents, membrane separation units, evaporation and crystallization equipment, and corrosion-resistant pumps and valves, the standard clauses will provide a clearer basis for selection.
  • Track segmentation for design institutes and EPC contractors — individual electroplating wastewater projects are modest in contract value, but have high technical thresholds and strong repeat-purchase characteristics; teams familiar with source-segregated collection and advanced heavy metal removal will continue to win industrial park orders.

It is worth noting that 11 月, an environmental protection company on the STAR Market, Jindalai, has just announced its winning bid for a 9900 万 yuan pure wastewater installation project in an electronics park (11 月 7 日 has reported), with the tendering party being an enterprise under a leading PCB company — electronic electroplating is precisely a key scenario covered by the electroplating wastewater standard. Signals from the standard side and the order side are arriving almost simultaneously: the treatment market for electroplating and electronic wastewater is moving from "compliance discharge" toward a dual-driven model of "standard constraints + reuse priority."

V. Key Points for Observation

  • Focus clauses in the feedback — the mandatory degree of source-segregated collection, the setting of reuse water quality indicators, and the linkage with the hazardous waste attributes of sludge are expected to be the three areas where opinions are most concentrated.
  • Alignment with local standards — major electroplating provinces such as Guangdong and Jiangsu already have local discharge standards; how the national standard aligns with local limits and park-contracted water quality deserves attention.
  • Release timetable — by convention, after the comment period there are still review and approval procedures, and official release is expected to take several more months; however, new project designs may refer in advance to the approach of the draft for comments to reserve flexibility.

About TIANYI TECH: TIANYI LIMITED has long followed industry developments in wastewater treatment, reclaimed water reuse, and water resource recycling, providing information, consulting, and technical exchange services to industry clients. This article is compiled from public information for industry reference.

Source: Public consultation notice of the General Office of the Ministry of Housing and Urban-Rural Development on the "Design Standard for Electroplating Wastewater Treatment (Partial Revision Draft for Comments)" (2026-11-02); public industry materials.

Copyright © 2026 TIANYI LIMITED All Rights Reserved