News
News
News

[Mainland China] Fujian Provincial Department of Housing and Urban-Rural Development released 15 typical cases of wastewater quality and efficiency improvement: 38.2 km of pipeline rehabilitation for RMB 3.15 million, collection rate increased by 12.66 pe

Industry News
2026-11-15
Fujian Provincial Department of Housing and Urban-Rural Development 11月11日 published typical cases of urban domestic sewage treatment quality and efficiency improvement projects: under the framework of the Three-Year Action Plan for Quality and Efficiency Improvement of Urban Domestic Sewage Treatment in the Minjiang, Jiulongjiang, and Aojiang River Basins (2026—2028年), the provincial department selected 15 representative projects from key cities and county towns, covering five fields: rainwater and sewage separation renovation, pipeline network construction in blank areas, pipeline network defect repair, sewage treatment plant and storage facility construction, and comprehensive water environment governance. Among them, the pipeline network repair projects repaired 1228 functional defects in pipelines, repaired a total pipeline length of approximately 38.2 kilometers, repaired 11 sewage pump wells, with an investment of approximately 315万 yuan; after repair, the pipeline flow capacity increased by an average of 50%, structural stability improved by more than 80%, the local domestic sewage centralized collection rate increased to 75.06%, an increase of 12.66 percentage points compared with 2024年, and the sewage treatment plant influent BOD₅ stably increased to 126.15 mg/L.

There have been many cases of sewage quality and efficiency improvement published across various regions, but Fujian's list is a rare one that clearly presents price, engineering volume, and performance indicators all at once. The 15 projects cover five categories of engineering, and the data provided by the pipeline network repair sample can almost be used as a "price list + report card" for the entire industry.

8.2万 yuan per kilometer: the price anchor for pipeline network repair

Let's do the math first: 38.2 kilometers of pipeline repair, 1228 functional defect repairs, 11 pump well repairs, with a total investment of approximately 315万 yuan—equivalent to approximately 8.2万 yuan per kilometer. It should be noted that this price corresponds to comprehensive engineering mainly involving desilting, dredging, and local repair, rather than full-line excavation and replacement; but even so, it still provides the industry with a scarce public price anchor. The trenchless pipeline network repair market has long suffered from dispersed quotations, making it difficult for owners to compare prices; unit prices for similar methods may differ several-fold across different cities. The official case's publication of a complete correspondence between "engineering volume—investment—results" is equivalent to providing housing and urban-rural development departments and design institutes across the country with a calibration ruler: to judge whether a repair plan is expensive, compare it with this figure first.

The performance-side data is equally convincing: after repair, pipeline flow capacity increased by an average of 50%, and structural stability improved by more than 80%. Spending just over three million to restore the conveyance capacity of 38 kilometers of old pipeline network to design level—compared with the excavation and pipe replacement cost of hundreds of thousands to over a million yuan per kilometer, the economic advantage of the "inspection—repair—re-inspection" trenchless route is firmly established by this set of figures.

BOD 126 mg/L: the hard acceptance criteria for quality and efficiency improvement

More important than price are two "hard indicators": domestic sewage centralized collection rate 75.06%, an increase of 12.66 percentage points in one year; sewage treatment plant influent BOD₅ concentration stably increased to 126.15 mg/L.

Everyone in the industry knows that "quality and efficiency improvement" has been advocated for years, and the real touchstone is these two numbers—the collection rate reflects whether the pipeline network has collected the sewage, and the influent BOD concentration reflects whether the collected water has been diluted by groundwater or river water. Since the national three-year action for sewage treatment quality and efficiency improvement was launched, cities with influent BOD concentrations below 100 mg/L have generally been named for rectification; being able to raise the collection rate by 12.66 percentage points in a single year shows that the repair was aimed at "blocking external water infiltration and collecting all sewage that should be collected", rather than a superficial project for appearance's sake.

A replicable combination of methods

The three major practices summarized in the case constitute a standard operating procedure for pipeline network repair:

  • Technology empowerment and precise diagnosis—pipeline inspection robots with high-definition cameras capture defects such as corrosion, rupture, and deformation; sonar detection identifies sedimentation and deformation under full-water conditions; examination first, prescription second, "one pipe, one strategy" rather than one-size-fits-all;
  • Classification-based measures and diversified repair—for sedimented pipes, high-pressure water jets, winch dredging, and sewer cleaning machines are used to restore the cross-section; for severely defective pipe sections, an in-situ replacement process of "old pipe continues drainage while new pipe is constructed simultaneously" is adopted, with no shutdown during construction; pump well repair uses submersible slurry pumps配合 high-pressure water guns for cleaning;
  • Dynamic management and coordinated advancement—projects are implemented on a rolling basis with regular inspections, and coordination with urban management, traffic police, and other departments optimizes traffic organization to minimize disruption to residents' lives.

The certain track of the 15th Five-Year Plan

Raise the perspective: the Ministry of Housing and Urban-Rural Development has explicitly set the goal of building and renovating about 77万 kilometers of urban underground pipeline networks during the "15th Five-Year Plan" period, and the "Urban Renewal 15th Five-Year Plan" requires carrying out underground pipeline network inspections and accelerating the renewal and renovation of old pipeline networks such as drainage and sewage. A considerable proportion of the nation's urban drainage pipeline networks were built in the last century, with leakage, misconnection, and siltation widespread — pipeline network rehabilitation is a certainty track with inspection basis, assessment indicators, and fiscal investment. Fujian's systematic release of typical cases in the name of the provincial housing and urban-rural development department means that rehabilitation methods are being standardized and tender parameters are being templated, which is a clear entry signal for three types of suppliers: inspection equipment (CCTV robots, sonar), trenchless rehabilitation materials and construction, and integrated pump-well equipment.

TIANYI TECH has long served urban sewage treatment and pipeline network quality improvement projects, covering the closed loop from inspection and assessment to rehabilitation construction and operational verification. We suggest paying attention to two spillover directions of the Fujian model: first, the "rehabilitation—collection rate—BOD" linked assessment may be written into action plans by more provinces, and inspection and rehabilitation budgets will be released along with the assessment; second, the provincial case list itself is a procurement clue — technologies and suppliers included in the list enjoy a credit endorsement advantage in subsequent projects within the province.


Source: Fujian Provincial Department of Housing and Urban-Rural Development, "Typical Cases of Urban Domestic Sewage Treatment Quality Improvement and Efficiency Enhancement Projects" (2026年11月11日). This article is compiled by TIANYI TECH industry research and is for reference only.

Copyright © 2026 TIANYI LIMITED All Rights Reserved