According to the Middle East industry media MEED, the Dubai Municipality Sewerage and Recycled Water Projects Department recently issued two tenders in quick succession: the first is the Al-Lissaily Sewage Treatment Plant Design and Build Project, with a capacity of 3000 cubic meters/day, tender number DS311/1, with a bid deadline of 10 月 29 日; the second is the Strategic Stormwater Drainage System, covering an area of more than 1 亿 square meters, tender number TF-07-C1, with a bid deadline of 10 月 22 日. In addition, the Municipality has also tendered the Abu Hail stormwater system upgrade and renovation, including a stormwater pumping station with a total drainage capacity of 26 cubic meters/second, with an estimated cost of up to USD 1.63 亿.
Scope Breakdown: A Small Sewage Treatment Plant "Built Adjacent to the Community"
The Al-Lissaily Sewage Treatment Plant project (No. DS311/1) covers the full process of design, supply, installation, construction, and commissioning. In terms of scale, 3000 cubic meters/day is a small sewage treatment plant, but its technical requirements are very clearly targeted.
The Municipality specifically states that the plant site is close to residential communities and agricultural areas, so the project will incorporate a series of environmental and social measures—
- Odor control—the site is adjacent to residential areas, so odor control is listed as construction content rather than ancillary supporting facilities.
- Effluent quality—the surrounding area is agricultural, so effluent parameters need to take into account possible reuse and receiving environment requirements.
- Noise reduction and environmental performance—fully enclosed or semi-enclosed design and low-noise equipment selection have become hard constraints.
- Landscape and architectural design—the Municipality requires the plant area to integrate landscape and architectural language that reflects Dubai's traditional characteristics and harmonizes with the surrounding agricultural environment.
This type of "small but refined, built adjacent to the community" sewage treatment plant is technically highly homologous with the fully underground/semi-underground water purification plants that have become popular in China in recent years: compact footprint, fully enclosed odor control, high effluent standards, and the surface can be used as parks or open space. For Chinese equipment enterprises, this is a segmented market where the technical path can be directly transferred.
Scale of the Stormwater System: 1 亿 Square Meters and 3000 mm Pipe Diameter
The second tender, TF-07-C1, is the Strategic Stormwater Drainage System, significantly larger in scale. The project covers an area of more than 1 亿 square meters, geographically extending from Sheikh Mohammed Bin Zayed Road (E311) in the north to Emirates Road (E611) in the south, and from Expo Road in the west to Dubailand in the east.
- Service scope—providing stormwater infrastructure and connection services for more than 20 private developers and the Al-Yalayis 5 community.
- Trunk road coverage—supporting multiple arterial roads in the Jebel Ali area, including Sheikh Mohammed Bin Zayed Road, Emirates Road, Sheikh Zayed Road, Sheikh Zayed Bin Hamdan Al-Nahyan Road, Hessa Street, Al-Yalayis Road, and Al-Fay Road.
- Engineering parameters—including a large gravity stormwater drainage system, with pipe diameters up to 3000 mm.
The Municipality states that the project aims to enhance drainage capacity, divert and relieve pressure on existing and new stormwater systems, and strengthen resilience against extreme rainfall events. The real pressure behind this statement is not difficult to understand: in recent years, the frequency of extreme rainfall in the Gulf region has increased, and existing drainage systems were designed for arid climates, with clearly insufficient carrying capacity. Stormwater infrastructure is upgrading from "supporting works" to "resilience works."
The Abu Hail stormwater system upgrade and renovation is another line: it includes a stormwater pumping station with a total drainage capacity of 26 cubic meters/second, with an estimated cost of up to USD 1.63 亿, and bids closed on 10 月 15 日. A single pumping station reaching this magnitude reflects the intensity of Dubai's investment in drainage capacity.
Why Is the Tender Issued by the "Sewerage and Recycled Water Projects Department"?
A detail that is easily overlooked: the tendering entity this time is the Sewage and Reclaimed Water Project Department of Dubai Municipality. Merging sewage and reclaimed water into the same department is itself a governance signal—in the Gulf region, the effluent from a wastewater treatment plant is not the endpoint but the starting point of the reclaimed water system, and the two must be considered as an integrated whole in terms of planning, pipe networks, and water quality standards.
The trajectory of the Saudi market can serve as a comparison. The Saudi Water Authority (SWA) recently awarded India's VA Tech Wabag an EPC contract for the Aljouf 5000 万 liters/day brackish water reverse osmosis (BWRO) plant, adopting a process route of ceramic membrane pretreatment + microfiltration cartridge + reverse osmosis; in the 20 年 ROT concession awarded by the Saudi Industrial Cities Authority (MODON) to Miahona, the biological and advanced treatment system supplied by the UK's Bluewater Bio will expand the capacity of the Jeddah First Industrial City industrial wastewater treatment plant from 25 MLD to 40 MLD, and produce 24 MLD of reverse osmosis feed water. Water investment across the Gulf region is shifting from "building plants" to "building cycles."
Opportunity Window for Chinese Enterprises
Chinese water enterprises and equipment manufacturers already have established cases of entering the Gulf market. Previously, a consortium formed by Beijing BHT Environmental Protection and the UAE's CWT won the EPC general contracting for the wastewater treatment plant in the Hamriyah area of Sharjah, covering design, procurement, and construction, and providing equipment supply, construction management, and O&M support; China Energy Engineering International Group has also signed with Dubai Electricity and Water Authority (DEWA) International, entering its global water EPC project portfolio.
From these cases, the competitiveness of Chinese enterprises is concentrated in three points—
- Delivery speed—modular, factory-prefabricated equipment forms can compress the construction cycle, meeting the generally tight project schedules in the Middle East.
- Cost-effectiveness and full-chain supply—the complete supply capability from membrane modules, pumps and valves to electrical and automatic control reduces the owner's interface management costs.
- Localized consortium—forming a consortium with local enterprises to bid not only meets local qualification requirements but also solves the problems of O&M response and long-term service.
It should be noted that the Middle East market has specific requirements for adaptability to high temperature, high salinity, and high evaporation conditions, and owners generally require long-cycle O&M guarantees. Beyond pricing, Chinese enterprises need to focus on proving the stability of equipment under extreme climates and the advantages of full life-cycle costs.
Bidding Tips
The bid deadlines for the two tenders are 10 月 22 日 (TF-07-C1 Strategic Stormwater System) and 10 月 29 日 (DS311/1 Al-Lissaily Wastewater Treatment Plant), respectively. Enterprises interested in participating should obtain the complete tender documents through Dubai Municipality's procurement channels, and focus on verifying local registration, tax, and local entity requirements. For subsequent rounds, it is recommended to complete local partner screening and qualification filing in advance, because the winning window is often reserved for entities that already possess bidding qualifications.
TIANYI TECH (TIANYI LIMITED) focuses on AI governance for industrial water treatment, water reuse optimization, and digital twin technologies, providing products such as industrial wastewater treatment AI agents, industrial water reuse optimization systems, and water system digital twin platforms. For the high-temperature and high-salinity conditions in the Gulf region, the company can provide membrane system operation optimization, intelligent dosing, and energy consumption scheduling algorithms, and achieve remote cluster management and predictive maintenance through the digital twin platform, helping overseas projects operate stably and meet standards under conditions of limited professional O&M personnel.
Sources: MEED "Dubai tenders sewage and stormwater projects," Gulf Construction, and TradeArabia related reports. Tender information is subject to the tender documents officially issued by Dubai Municipality.
Industry News
2026-10-31