News
News
News

[Mainland China] Chongqing's "15th Five-Year Plan" Water Security Assurance Plan Released: Unconventional Water Utilization to Reach 750 Million Cubic Meters; Bishan and Tongliang to Pilot Reclaimed Water Rights Confirmation and Trading

Industry News
2026-11-01
With the approval of the Chongqing Municipal Government, the Chongqing Municipal Development and Reform Commission and the Municipal Water Resources Bureau jointly issued the "Chongqing Municipality '15th Five-Year Plan' Water Security Guarantee Plan (2026–2030 年)". The plan sets 12 main indicators, specifying that the city's total water consumption be controlled within 105.58 亿 cubic meters, and that water consumption per 10,000 yuan of regional GDP decrease by more than 10% compared with 2025 年; in terms of water resource allocation, it requires the implementation of reclaimed water recycling projects, with unconventional water utilization reaching 7.5 亿 cubic meters. Most noteworthy is the water conservancy reform deployment: piloting reclaimed water rights confirmation and trading in Bishan, Tongliang and other areas, and promoting water rights pledge loans.

12 Indicators: A "Total Pool" Equivalent to One Quarter of the Three Gorges Reservoir Capacity

Based on Chongqing's municipal and water conditions, the Plan scientifically sets 12 main development indicators, covering total water consumption and efficiency, backbone water network coverage, water supply guarantee, rural water supply, irrigation efficiency, flood control compliance, ecological flow and water quality of rivers and lakes, and other aspects, systematically enhancing water security guarantee capacity.

  • Total water consumption and efficiency — the city's total water consumption is controlled within 105.58 亿 m³, and water consumption per 10,000 yuan of regional GDP decreases by more than 10% compared with 2025 年.
  • Backbone water network — backbone water network coverage reaches 85%, the annual water supply capacity of newly added water conservancy projects above designated size reaches 14 亿 m³, and newly added reservoir capacity reaches 8 亿 m³.
  • Water supply and irrigation — the rural tap water penetration rate reaches 98%, and the effective utilization coefficient of farmland irrigation water increases to 0.542.
  • Flood control and ecology — the compliance rate of 1–5 grade embankments exceeds 92%, the soil and water conservation rate rises to 74.5% and above, the compliance rate of basic ecological flow of key rivers and lakes exceeds 90%, and the proportion of good-quality water bodies is no less than 93.7%.
  • Digital intelligence — the digitization rate of major water conservancy projects is no less than 60%.

A relevant person in charge of the Chongqing Municipal Water Resources Bureau interpreted the total water consumption of 105.58 亿 m³ as an example: this figure is approximately equivalent to one quarter of the total capacity of the Three Gorges Reservoir. Using such a "total pool" to cover all production, domestic, and ecological water use across the city not only reflects rigid constraints, but also means that Chongqing must rely on multiple measures such as water network scheduling, water conservation, and reclaimed water utilization to guarantee it.

Six Areas of Tasks: Reclaimed Water Written into the "Project List"

Centering on the overall goals, the Plan deploys key tasks in six areas: water resource allocation, flood control and disaster reduction, ecological protection, digital-intelligent water conservancy, water conservancy reform, and modern water governance, and clarifies the list of key projects in the form of special columns.

In terms of water resource allocation, the Plan requires strengthening rigid constraints on water resources, advancing water conservation actions in key areas such as agriculture, industry, and urban areas, controlling the leakage rate of urban public water supply networks within 8.2%, implementing reclaimed water recycling projects, with unconventional water utilization reaching 7.5 亿 m³; at the same time, building, extending, or renovating trunk and branch pipelines of 3.7 万 kilometers, building the Yutan large-scale irrigation district, and comprehensively advancing the modernization and renovation of irrigation districts.

In terms of digital-intelligent water conservancy, the Plan calls for building the "three lines of defense" for rainfall and water regime monitoring and an integrated "space-air-ground-water-engineering" monitoring and perception system, advancing the "trinity" construction of digital twin basins, digital twin water networks, and digital twin projects, iteratively forming a "1+9+N" application cluster, and supporting the establishment of the Chongqing Digital Twin Water Conservancy Technology Innovation Center.

The Most Critical Sentence: Reclaimed Water Rights Confirmation and Trading

The statement in the water conservancy reform section of the Plan is the most groundbreaking sentence among the current round of local "15th Five-Year Plan" water security plans: advance water use rights trading, with Wanzhou, Jiangjin, and Changshou as pilots to promote paid acquisition of water use rights by industrial enterprises, with Bishan, Tongliang and other areas as pilots to explore reclaimed water rights confirmation and trading, and promote water rights pledge loans.

The significance of this statement lies in the fact that it advances Reclaimed Water from an "engineering object" to an "asset object." For a long time, the biggest obstacle to the promotion of Reclaimed Water has not been technology, but rather that value cannot be quantified, rights cannot be defined, and returns cannot be monetized—the Reclaimed Water produced by water plants lacks clear ownership certificates in legal and financial terms, and it is difficult for enterprises using Reclaimed Water to form water rights assets that can be recorded on the balance sheet. Once rights confirmation is completed, Reclaimed Water can enter the trading and pledge process, forming a closed loop of "rights confirmation—trading—pledge—reinvestment in construction."

The Plan also proposes deepening the water conservancy market, transforming ecological value, reforming water supply pricing, and exploring models such as water conservancy asset securitization and water security-oriented development, striving to achieve zero breakthrough in the issuance of water conservancy infrastructure REITs. This combination means that the financialization path for Reclaimed Water assets has been fully designed: rights confirmation addresses "what it is," trading addresses "how much it is worth," and pledging and REITs address "where the money comes from."

Regional Sample: Jiangjin Has Already Completed One Step

Chongqing did not start from scratch. In 2025 年, Jiangjin District publicly transferred the water intake operation rights of 122 reservoirs including Qingxigou Reservoir, with approved annual water intake of approximately 6000 万 m³ and a transfer period of 30 年; after Jiangjin Hub Port Industrial Park Operation Group won the bid, it jointly completed the value assessment of water intake operation rights and pledge loan procedures with financial institutions, raising over 10 亿 yuan, making it the largest single water intake operation rights pledge financing project in Chongqing.

The head of the Water Resources Section of the Jiangjin District Water Conservancy Bureau stated that the ability to pledge and finance water intake operation rights is equivalent to opening up a channel for transforming the ecological value of water resources into financial capital, which not only promotes the continuous optimization of the regional water use structure but also injects financial vitality into water conservancy infrastructure construction, effectively alleviating fiscal investment pressure. This directly echoes the Plan's deployment to "pilot paid acquisition of industrial enterprise water rights in Wanzhou, Jiangjin, and Changshou"—Jiangjin started with reservoir water intake rights, and will next continue to advance on industrial water rights and Reclaimed Water rights.

Connection with the National Policy Chain

Chongqing's local deployment is not an isolated case. Since 2026 年, the national pilot program for Reclaimed Water utilization configuration in typical regions jointly carried out by six departments has concluded, with the Reclaimed Water utilization rate in pilot cities increasing from 26% to 41%; multiple provinces have set urban Reclaimed Water utilization rate targets at 60% in their "15th Five-Year Plan" water security guarantee plans; Dongguan, Guangdong, through a combination of water rights trading and "water-saving loans," has increased its Reclaimed Water utilization rate from 18% to 26.2%. Chongqing's move to write "Reclaimed Water rights confirmation and trading" into a provincial-level five-year plan means that this mechanism is upgrading from spontaneous exploration by individual cities to a provincial-level institutional arrangement.

Three Implications for the Industry Chain

  • Metering and verification become upfront investment—the prerequisite for rights confirmation and trading is verifiable and traceable water production volume and water quality data. Online metering, water quality ledgers, automated reporting, and third-party verification will shift from "optional" to "standard."
  • Certainty of the industrial direct supply model rises—the Bishan and Tongliang pilots point to Industrial Park scenarios. Demand for double-membrane processes, quality-segregated water supply, and dedicated pipe networks will be released as rights confirmation is implemented, and users' requirements for water quality stability will increase accordingly.
  • Intelligentization is the technical foundation for rights confirmation—the constraint that the digitalization rate of major water conservancy projects be no less than 60%, combined with the "trinity" construction of Digital Twin, means that new construction and renovation projects need to deliver data platform capabilities simultaneously, rather than only process equipment.

What to Watch Next

The Plan clarifies that the next step for the Municipal Water Conservancy Bureau will be to coordinate with the Municipal Development and Reform Commission and other relevant departments to advance plan implementation and conduct implementation effectiveness evaluations in due course. For the industry, the most worthwhile item to track is the implementation rules for Reclaimed Water rights confirmation in Bishan and Tongliang—how the rights confirmation targets are defined, where the trading platform is hosted, and how pledge valuation is calculated. The answers to these three questions will determine the actual pace of Reclaimed Water assetization.


TIANYI TECH (TIANYI LIMITED) focuses on AI governance for Industrial Wastewater, water resource reuse optimization, and Digital Twin technology, providing products such as industrial wastewater treatment AI agents, industrial water reuse optimization systems, and water system Digital Twin platforms. It can provide integrated solutions for water production forecasting, online water quality verification, intelligent dosing, and pipe network scheduling optimization for Reclaimed Water configuration and rights confirmation trading pilot projects, helping users transform Reclaimed Water from a cost item into a measurable and tradable asset item.

Source: Chongqing Municipal People's Government website, Chongqing Daily (2026-11-01), China News Service Chongqing, and public information from the Chongqing Municipal Water Conservancy Bureau. The original plan text shall be subject to the official document jointly issued by the Chongqing Municipal Development and Reform Commission and the Municipal Water Conservancy Bureau.

Copyright © 2026 TIANYI LIMITED All Rights Reserved